There is an urgent need for a model of construction organization design for a 6 storey residential b

Updated on society 2024-02-20
7 answers
  1. Anonymous users2024-02-06

    Six-storey brick-concrete structure construction organization design.

    Construction organization design of a six-storey frame structure apartment building.

    Construction organization design of a six-storey brick-concrete apartment building.

    Six-storey brick-concrete construction organization design scheme.

    Construction plan of brick-concrete structure of 6-storey apartment building.

    Construction organization design of 6-storey brick and concrete residential building.

  2. Anonymous users2024-02-05

    What is the specific content of the construction organization design of the six-storey brick-concrete structure residential building, the following Zhongda Consulting will answer for you.

    Chapter 1 Project Overview.

    Project Overview. The residential building project is located in the east living area of the company, to the west and to the south, it is an affordable residential building built by the enterprise and the full amount of funds raised by the employees, and its completion will alleviate the housing difficulties of some of the company's employees.

    The project is designed by the Design Institute, consisting of 36 three three-unit independent residential buildings, with a total construction area of 7548m2, a single building area of 2516m2, building height, floor height of 3m, its room type is two bedrooms and one living room, and the ground floor has a small courtyard.

    The structure of this project is a six-storey brick-concrete structure, with a seismic fortification intensity of seven degrees, the foundation is a rubble concrete strip foundation, 240 red brick masonry walls, except for the kitchen and bathroom for cast-in-place concrete floor slabs, and the rest are porous prefabricated floor slabs. The floor is leveled with cement mortar (the stairwell is cement mortar floor), the interior wall is white 106 paint, the exterior wall is 803 cream yellow paint, and the cornice and canopy are red brushed stone. The doors are plain wooden plywood and the windows are 70 series white aluminium sliding windows (with screen) and blue glass.

    The roof is waterproof with three felts and four oils, and an overhead layer is provided.

    Site conditions. The site of this project is a vegetable field, and some earthwork will be transported. The on-site water, electricity and roads all meet the construction requirements. Domestic and construction wastewater can be discharged directly into the mining drainage network.

    All prefabricated panels can be sourced from local prefabricated component factories.

    Chapter II Construction Preparations.

    Site layout.

    According to the on-site situation and the requirements of the owner's bidding and Q&A meeting, the on-site living facilities will not be considered for the time being, and the production facilities will only be considered according to one building. In order to meet the construction requirements, achieve civilized construction, and scientifically and reasonably arrange production facilities, we have planned Appendix 1: "Construction Site Layout Plan" and Appendix 2:

    Temporary Land Table.

    Construction water and electricity.

    Temporary water use. On-site temporary water is diverted from the factory pipe network to a DN50 galvanized steel pipe to each water point on the construction site; The construction sewage is built along each water point with a trench of d h of 200 300mm, and a sedimentation tank of 400 400 500mm is built at the end of the trench to precipitate the sewage, sand and gravel, and then the precipitated sewage is discharged to the sewage pipe network of the plant area. For temporary water, see Appendix 3 "Temporary Water Floor Plan".

    Temporary use of electricity. Overview. The project is provided by the owner near the site to provide construction power, all to.

    The cables of the first and second distribution boxes are all armored power cables, and they are laid overhead or buried according to the actual situation of the site. For details, please refer to Appendix 4 "On-site Construction Electricity Plan", Appendix 5 "On-site Construction Electricity System Diagram", and Appendix 6 "General Distribution Box System Diagram".

  3. Anonymous users2024-02-04

    The graduation project is still done well by yourself, and you can still learn something.

  4. Anonymous users2024-02-03

    Construction organization design of a six-storey brick-concrete apartment building.

    One. Project Overview:

    The 2nd floor project of Anhui Fuhuang Group staff apartment is a six-story brick and concrete structure with a construction area of 3,110 square meters. For residential buildings, the high-rise roof is mainly a sloping roof, and some of them are flat roofs. It is divided into four units.

    There are four reinforced concrete staircases. The south façade has an outward-mounted balcony.

    Foundation and structural design.

    This project is a brick-concrete strip foundation. The elevation of the bottom of the foundation is a specific structure: 200mm C15 plain concrete. M10 cement mortar, MU10 mechanism clay brick masonry. The height is C25 reinforced concrete foundation ring beam.

    Wall: The following wall is M10 cement mortar, MU10 clay solid brick masonry; The above to four layers are M10 mixed mortar. The fifth layer is a mixed mortar. The sixth floor to the roof is M5 mixed mortar, MU10 clay hollow brick masonry.

    Architectural decoration and decoration.

    Doors and windows: mainly steel doors, casement wooden doors, half-slope PVC swing doors, half-slope PVC sliding doors, windows are mainly plastic steel with insulating glass (6+12+6) provided by Party A.

    Floor: The ground is plain soil tamping, 100mm thick gravel cushion, 60mm thick C20 concrete with pounding and plastering, plain cement slurry, 20mm thick 1:2 cement mortar surface layer.

    The floor is a plain cement slurry with a 20mm cement mortar surface layer. The kitchen and bathroom floors are covered with polyurethane waterproof coating film, and 150mm high concrete waterstops are added along the walls, and the floor elevation of the kitchen and bathroom is 20mm lower than that of other rooms

    Inner stucco: 14mm thick 1:3 cement slurry bottom, 6mm thick 1:2 cement slurry surface, full scraping putty, two interior wall paints.

    Ceiling: 8mm thick 1:1:4 cement lime mortar bottom, 7mm 1:2 cement mortar surface, one full scraping putty, two interior wall paints.

    Exterior decoration: the exterior walls are all cement mortar whitewash; High-grade exterior paints (color owner-determined).

    Roofing: cast-in-situ reinforced concrete flat and sloped roofs. The flat roof is 100mm thick lime coke slag, 40mm thick polystyrene insulation, 20mm 1:

    3. Cement mortar screed. 30mm thick self-adhesive waterproofing membrane, 35mm thick steel waterproof roof (Master roof plus 25mm cement mortar surface layer); The sloping roof is 15mm 1:3 cement mortar screed, thick BAC self-adhesive waterproofing membrane, 40mm thick expanded EPS polystyrene board, 20mm 1:

    3. Cement mortar screed, 30 thick 1:2 waterproof mortar pasted with mud water tile.

    Paint: wooden doors, stair handrails with blended paint; Pre-embedded wood bricks are water-asphalted and anti-corrosion.

    Hydropower installation. The water and electricity installation of this project includes domestic drainage system, electrical lighting and seismic grounding system.

    Construction site conditions.

    The construction site has three links and one level, and the construction conditions are met.

    The water and electricity used for construction are connected to the construction site by the owner.

    The construction period of this project is 150 days, and it is required to be a qualified project. And adopt a supervision and management supervision system.

  5. Anonymous users2024-02-02

    Is it appropriate to send it to you upstairs.

    If it's not suitable.

    I've got you here, I'll send it to you.

  6. Anonymous users2024-02-01

    Construction organization design of A3 and A4 floors of a high-rise residential garden phase I in Kunshan 84 construction plan for external wall insulation (steel wire mesh frame) of high-rise residential building project 30 Organization design of plumbing construction of a high-rise residential building in Tianjin 42

    Construction organization design of reinforced concrete shear wall structure of high-rise residential main building of a power design institute 51 Organization design of water and electricity installation construction of staff residential building of a hospital in Sichuan Province 75 Construction organization design of a high-rise residential community in Chengdu 318

    Chongqing high-rise residential construction organization design (33-storey Three Gorges Cup Award Project) 255 Harbin residential community fire engineering construction organization design 150 a high-rise residential basement raft engineering construction plan 148

    Shandong Armed Police Frontier Corps Temporary Electricity Construction Organization Design for High-rise Residential Buildings 42 Zhejiang Province Residential Water and Electricity Construction Organization Design 56

    Organization design of temporary electricity construction of a faculty residential building 113 Organization design of construction of a high-rise residential building (shear wall structure) 309 Special construction plan of punching piles for residential community engineering 137 Organization design of hydropower installation and construction of a residential community in Shanghai 162 Organization design of interior fine decoration construction of a high-rise residential building in Beijing 201 Organization design of fire protection engineering construction of a residential building in Beijing 167

    Residential water and electricity construction organization design of a community in Chengdu 134

    Construction organization design of electrical engineering in a residential community in Beijing 150 Construction plan of formwork for buildings 4 and 5 in the North District of staff housing of the Chinese Academy of Sciences and Tsinghua University 125 Construction plan of a high-rise residential basement raft project in Wuhan 199 Construction organization design of a high-rise residential building in a community 589

    Huamei Cangzhou residential building roof steel structure maintenance project construction plan.

  7. Anonymous users2024-01-31

    Construction organization design of four-storey brick and concrete office building 115

    Construction organization design of a brick-concrete structure residential community 212

    Construction organization design of a residential community (brick-concrete, strip foundation) 131 Controlled blasting and demolition of eight-storey brick-concrete buildings 99

    Construction organization design of a brick-concrete structure office building in Xi'an 456 Construction organization design of resettlement housing project (brick-concrete structure) 126 Six-storey brick-concrete construction organization design 270

    Construction organization design of a public security fire building in Heilongjiang (brick-concrete structure) 117 construction organization design of brick-concrete structure residential building project 1730

    Construction organization design of a 7-storey brick-concrete structure student apartment building in Shandong 431 brick-concrete structure construction plan 493

    Mianyang City a bank accommodation building reinforcement project construction group (** after the reinforcement of brick and concrete structure) 125 a certain brick concrete construction organization 293

    Construction organization design of decoration and decoration project of a local taxation office in Henan (brick-concrete structure) Construction organization design of 280-storey brick-concrete residential building 1056

    Brick and Concrete Housing Construction Scheme 739

    Organization of the construction of brick-concrete structures 1889

    Organization design of brick-concrete structure construction 499

    Construction plan for brick-concrete structure of 6-storey apartment building 1728

    Construction organization design of multi-storey brick-concrete structure student dormitory building 1620 Construction organization design of six-storey brick-concrete structure 1981

    Organization design of brick-concrete structure construction 1282

    Kindergarten brick and concrete structure construction organization design 642

    Construction organization design of multi-storey brick and concrete residential buildings 1904

    Construction plan for an eight-storey brick-concrete residential building.

Related questions
5 answers2024-02-20

According to the Ministry of Construction, the spacing between buildings shall be formulated. >>>More

13 answers2024-02-20

I'm the opposite! After Goethe finished speaking, he smiled and retreated to the side of the road. >>>More

27 answers2024-02-20

Magic weapon: 2 double water 9-layer windbags + 50 speed. Other attributes: Double 9-ply windbag +48. It is suitable for PK to quickly start sealing people. >>>More

8 answers2024-02-20

From Nanjing Railway Station, take No. 13 to go up (Nanjing Railway Station - Nanhu), transfer to No. 134 to go down (Stone Town Park - Cotton Embankment) at Tuas Tea Pavilion to arrive at Lushan Road. Approx. km. >>>More

14 answers2024-02-20

Minimum configuration. Operating System:

Microsoft Windows XP Vista 7 Processor: >>>More