    Aluminum plate insulation integrated board detailed introduction, construction process.

    There are many kinds of exterior wall insulation integrated boards, and the more popular materials on the market are: thin ceramic thermal insulation composite integrated board, thermosetting composite thermal insulation integrated board, aluminum plate thermal insulation integrated board, etc. Today, I will introduce you to the aluminum plate insulation integrated board.

    1. Material introduction.

    The raw material is aluminum or aluminum alloy material, and the aluminum product plate is made by heating and straightening technology.

    Second, the process introduction.

    Aluminum ingots, flat plates, cutting, punching, opening angles, rolling, rolling, folding, nailing, welding, reinforcement assembly, grinding, spraying pretreatment, spraying, high temperature baking, packaging finished products.

    3. Feature introduction.

    1.Light weight, is 1 5 of marble, reduces the building load;

    2.Strong corrosion resistance, UV resistance;

    3.It does not fade for a long time and has a long service life.

    Fourth, the construction and installation process.

    1.Grassroots treatment.

    For the uneven surface of the base wall, adjust it with special mortar.

    2.Stickup.

    Paste the insulation board to the wall with professional mortar to achieve the specified bonding strength.

    3.Anchoring.

    The plates and walls are firmly connected together with anchors, which effectively improves the safety of the building.

    4.Seam treatment.

    Reserve a 5mm-10mm wide joint between each insulation decorative board, when the mortar at the bottom of the board is dry, then fill the foam material, fill the gap with weather-resistant sealant.

  2. Anonymous users2024-02-06

    Thermal insulation integrated board, also known as thermal insulation decorative integrated board, compared with the traditional broken plastering system, the installation of integrated board is simpler, the performance is stable, the life is longer, and it has both thermal insulation and decorative effects. Take Tianjin Huapeng's thermal insulation integrated board as an example, the construction process is roughly as follows:

    3.Cutting and grooving: using special tools, slotting on site according to the calculation results.

    4.Paste on the wall: use a special adhesive, paste the frame point, and adjust the position.

    5.Anchor installation: Use L-type and H-type anchorage according to the design.

    6.Grout treatment: stuff foam rods, paste paper tape, apply sealant.

    That's all.

  3. Anonymous users2024-02-05

    Summary. The operation process of the insulation integrated board: 1

    First of all, place the insulation board on a flat ground to ensure its safety. 2.Then, plug the power plug of the insulation board into the power socket and turn on the power switch.

    3.Next, put the items to be insulated into the insulation board and adjust the temperature of the insulation board to the desired temperature. 4.

    Finally, after placing the items in the insulation board, close the door of the insulation board to ensure the insulation effect.

    The operation process of the insulation integrated board: 1First of all, place the insulation board on a flat ground to ensure its safety.

    2.Then, plug the power plug of the insulation board into the power socket and turn on the power switch. 3.

    Next, put the items to be insulated into the insulation board and adjust the temperature of the insulation board to the desired temperature. 4.Finally, after putting the items in the insulated integrated celery board, close the door of the insulating integrated board in front of the macro to ensure the thermal insulation effect.

    Relevant information: Thermal insulation integrated board refers to the EPS, XPS, polyurethane, rock wool and other thermal insulation materials and a variety of shapes, a variety of colors of thin stone, metal beam collapse plate or inorganic oak round pre-coated decorative board in the factory for organic compounding, to achieve the prefabrication, standard, combination of products, production plants, construction and assembly, to achieve the purpose of thermal insulation and decoration function in one.

  4. Anonymous users2024-02-04

    1. Grassroots treatment. The base layer is treated accordingly to ensure that the base layer is flat, dry and clean.

    2. Measure and pay-off. According to the design of the building façade or wall, the horizontal lines, vertical lines and dividers of doors and windows are popped up at the base layer.

    3. Hang the baseline. Hanging vertical lines around the perimeter of the building and where it needs to be carried, and horizontal lines at the appropriate locations on each floor, helps to control the verticality and flatness of the panels.

    4. Prepare the mortar of the sticky hall. Strictly abide by the manufacturer's requirements for proportioning and instructions, and must be responsible for the deployment process. In particular, the adhesive mortar must be mixed with the ready, and for the bonded mortar that has been mixed, it must be used up within 2 to 4 hours.

    Of course, there are many more construction processes for thermal insulation and decorative integrated boards, and I will give different examples.

  5. Anonymous users2024-02-03

    Zhonghe building materials exterior wall insulation integrated board construction process sharing:

    Check the base layer of the wall first, if the wall is bulging or the wall skin is falling off, it needs to be flattened first. Then remove the dirt and dust from the surface of the wall. In this way, the adhesion of the board to the wall can be increased and the service life can be extended.

    Then you need to pop up the wall with ink lines to divide the line, the horizontal line, and the vertical line. In this way, during construction, it can ensure that the surrounding boards are on the same level, making the construction more efficient.

    When the material is ready, it's time to mix the glue, mix the mortar evenly with a stirrer, and add the interface powder. This results in a better fit and stronger fit to the wall.

    When pasting, the mortar is applied evenly behind the board and then along the dividing line. Pay attention to the pasted sheet from top to bottom; If you encounter special structures such as doors, windows, balconies, etc., you can first finish the special structure and paste the remaining parts; In the actual construction, there may be deviations from the expected measurement, so be sure to check and adjust again with a ruler.

    After the whole is pasted, paste the masking paper on the concave surface of the building base, pay attention to straightness. Then, use a glue gun to inject sealant into the separating joint of the plate to ensure uniformity, and you can use a scraper to smooth it out to ensure the thickness of the left and right.

    After the glue is completely dry, tear off the glue and remove the remaining glue stains on the surface of the wall.

  6. Anonymous users2024-02-02

    Before the board is put on the wall, the construction wall should be cleaned, and the steel frame keel or directly installed on the wall should be installed according to different materials and situations.

    Direct installation on the wall: special fasteners for wall perforation installation, and special glue on the back of the insulation board can be spliced on the wall.

    Installation with steel frame keel: special fasteners can be directly installed on the steel frame keel and the insulation board is spliced one by one, I hope to help you.

    Question: Hello, how to write the plan of the glass curtain wall?

  7. Anonymous users2024-02-01

    Grass-roots inspection - hollowing, falling off and leveling of the grass-roots wall - elastic reference line and segmentation - pasting insulation decorative board - anchoring decorative board with special fasteners - filling the caulking with thermal insulation foam strips - cleaning the gap of the board - pasting masking tape - pouring silicone weather-resistant sealant - installing special exhaust plug - tearing off masking paper - cleaning the panel.

  8. Anonymous users2024-01-31

    1. Preliminary preparation.

    Before the installation of the external wall insulation integrated board, relevant preparatory work must be carried out, including the formulation of the construction plan, the inspection of the site environment, the inspection of construction materials and equipment, etc. The construction plan should be reasonably designed according to the actual situation, and the loss of materials and the risk factors in the construction process should be fully considered. The main purpose of the site environmental inspection is to ensure construction safety and construction efficiency.

    The inspection of construction materials and equipment is mainly to ensure that the equipment is working properly and the quality of the materials is qualified.

    2. Basic treatment.

    Before the installation of the external wall insulation integrated board, the wall foundation must be treated. This includes cleaning the wall to make it smooth and flat. After the surface of the wall is cleaned, it needs to be coated with a layer of environmentally friendly construction-grade water ridge mortar to make the surface smoother and smoother.

    3. Basic layer processing.

    After the surface treatment of the wall is completed, it is necessary to apply a layer of insulation base layer on the wall. The thickness of the base layer is required to be uniform, the brushing area should not be too large, and the brushing area should not exceed 2 square meters each time. The anti-crack net in the insulation base layer should be consistent with the insulation layer, which can effectively ensure the stability of the insulation layer.

    4. Installation of external wall insulation integrated board.

    After the treatment of the insulation base layer is completed, the installation of the external wall insulation integrated board needs to be carried out. Before installation, the cutting and nesting of the panels need to be carried out on site. After the sheet cutting and nesting are completed, the integrated board is positioned one by one on the base layer.

    During the installation process, it is required that the plate and the base surface are tightly bonded.

    5. Insulation layer treatment.

    After the installation of the exterior wall insulation integrated board is completed, it needs to be coated with a layer of insulation layer again. The treatment of the insulation layer is mainly to repair the brick joints and small damage on the surface of the board to ensure the smoothness of the outer surface. In the process of insulation treatment, it is necessary to ensure the quality of materials and avoid uneven thickness or unqualified quality.

    6. Apply the outer protective layer.

    After the insulation layer is treated, the outer protective layer needs to be applied. The outer protective layer is mainly applied to prevent moisture, waterproof and fireproof, and avoid damage to the insulation layer by wind, rain, sun and high temperatures. The outer protective layer is coated with high-quality cement and silicone materials, which are sheared and mixed evenly and then modified for construction.

    After the outer protective layer is applied, it is thoroughly dried and cured.

    7. Cleaning and acceptance.

    After the installation of the exterior wall insulation integrated board is completed, the construction site must be cleaned, including cleaning materials, tools and site garbage. After the cleaning is completed, the entire construction process needs to be accepted to ensure that the construction quality meets the requirements of the project.

    8. Summary. The construction flow core of the external wall insulation integrated board is more complicated, which requires the technical strength, quality level and discipline of the entire construction team. It is necessary to strictly implement the construction standards and procedures to ensure that the construction quality meets the standards and ensure the quality and safety of the project.

  9. Anonymous users2024-01-30

    In the cold area, the exterior wall will generally use thermal insulation integrated board, which solves the problem of building thermal insulation and is very in line with the current trend of building materials development. The exterior wall and exterior insulation integrated board are mainly based on bonding, supplemented by anchoring, and we will immediately learn about the detailed construction process.

    First, the construction process of the external wall insulation integrated board.

    1. First of all, treat the surface of the substrate to avoid floating dust, dirt, protrusions, etc., the purpose is to ensure the penetration of the adhesive mortar and the bottom layer, strengthen the bond strength, and have a longer service life.

    2. Measure the actual exterior wall, set the grid line and mark it; Then, according to the grid line, hang horizontal and vertical lines on the wall.

    3. Stir the slurry with a handheld electric mixer for about 5 minutes, until the consistency of the mortar is uniform and moderate. Ensure the bond strength of polymer mortar.

    4. The addition of interface agent can make the bonding between the insulation integrated board and the surface of the exterior wall more firm, adjust it in proportion, scrape it behind the insulation decorative board with special mortar, and paste it according to the grid line. Then use a 2m ruler to check whether the wall is flat, and if not, adjust it to the allowable range.

    5. According to the building base surface and thermal insulation decorative board, choose different anchoring methods. Then clean up the floating dust on the surface, paste masking paper on both sides of the groove, keep it horizontal and vertical, and the width is consistent. Use a sealing gun to evenly apply sealant in the separator, and scrape the sealant with a flat hanging knife with a thickness of .

    6. Remove the masking paper after drying, and pay attention to the fact that there are no scratches and dirt on the surface. The final acceptance is completed.

    2. Precautions for installation of thermal insulation integrated board.

    Before installation, it is necessary to check the flatness of the wall, the error must be less than 2mm, and then see whether the external quality of the insulation integrated board is qualified, such as color difference, flatness, whether the surface layer of the insulation board has scratches or dust marks, etc.

    During the construction, in order to reduce the gap between the plate and the plate before, the PE glue rod can be used to close the plate seam first, and the gap between the board joints after the weather-resistant glue can be avoided when the silicone sealant is used to seal it later, which will affect the gluing and sealing effect.

    It is also necessary to pay attention to the weather during construction, if the construction is not possible in rainy and windy weather, otherwise the plate will be affected by bad weather and affect the service life. Avoid the polymer mortar connected to the board and the wall from being washed by rain before it dries, and if necessary, the freshly constructed board wall should be protected by training.

  10. Anonymous users2024-01-29

    Preparation before the construction of thin ceramic exterior wall insulation and decorative integrated board.

    What is a thin ceramic insulation integrated board:

    A new type of building insulation material, which is composed of a thin ceramic outer layer, an insulation layer and an internal bearing layer. The thin ceramic outer layer has the characteristics of fire resistance, corrosion resistance, weathering resistance, etc., and can be combined with EPS board, XPS board, silicate board, rock wool board, glass wool board and other materials, and the internal bearing layer plays a supporting role.

    The following preparations need to be made before the construction of ceramic sheet exterior wall insulation and decorative integrated board:

    1.Preparation of design scheme: According to the structure and characteristics of the building, the construction plan and drawings of the corresponding ceramic sheet exterior wall insulation and decoration integrated board are designed.

    3.Preparation for waterproofing: Before construction, it is necessary to waterproof the surface of the exterior wall to ensure that the wall is dry and free of moisture.

    4.Preparation for base treatment: Before construction, the base wall needs to be reinforced to ensure that the wall is smooth and firm.

    5.Equipment preparation: Prepare the tools and machinery and equipment required for construction, such as cutters, wrenches, scaffolding, etc.

  11. Anonymous users2024-01-28

    In order to better meet the needs of users, Tiandi large thermal insulation decorative integrated board has developed perfect construction steps, and the process flow of thermal insulation decorative integrated board is as follows:

    Grass-roots inspection, elastic baseline, pasting insulation and decorative integrated board, anchoring, sealant, and protective film.

    1.Grassroots inspection: the surface of the wall that needs to be installed should be clean and free of impurities, no hollow bulging and sand peeling, etc., the wall is smooth and without convex depressions, and the comprehensive specifications such as large angle vertical meet the plastering standard.

    2.Bounce baseline: according to the design division drawing, determine the horizontal baseline, and determine the vertical control line according to the requirements of the drawing and the size of the model, the baseline is bounced on the surface of the wall with an ink line, and finally checked with a tape measure.

    3.Paste insulation decorative integrated board:

    a. In accordance with the design requirements, the thermal insulation decorative integrated board is cut into the specified size.

    b. According to the specified proportion, add the special powder paste to appropriate water, and mix evenly with an electric mixer.

    c. Apply the evenly adjusted adhesive mortar to the back of the finished board with a scraper, then push the insulation board to the wall by hand, then attach the adsorption plate to the surface of the board, use the suction cup to adjust the position of the insulation board, and finally check the flatness of the pasted with a ruler and a level, so that the overall board surface remains flat and aligns the separator.

    4.Anchoring: After each insulation integrated board is pasted, it is installed from the middle of the 300mm-500mm gap, and the effective anchorage depth of the screws is 25mm into the wall, 5

    Sealant: clean up the impurities and dust on the board surface of the thermal insulation and decorative integrated board, uncover the protective film of the board, pop out the divider line according to the requirements of the grid width, and then paste the paper tape along the line, first use the glue gun to evenly and appropriately mark the sealant in the separator, and then scrape it flat with a scraper, and pull off the paper tape after construction.

    6.Remove the protective film: first remove the plastered dirt on the edge of the thermal insulation decorative integrated board, then tear off the protective film and clean it with a towel.

    The construction personnel must wear safety helmets, do a good job of protective measures for high-altitude work, and the insulation integrated board stacking area should be far away from the welding operation area or take effective isolation measures, and the site is equipped with sufficient fire extinguishers to ensure safety.

Related questions
6 answers2024-03-25

Declaration Procedure. 1. Local project declaration. The applicant shall submit the project application materials to the competent department of finance and housing and urban-rural construction where the project is located, and apply for ** financial subsidy funds; The local departments in charge of finance and housing and urban-rural construction shall seal and report to the departments in charge of finance, housing and urban-rural construction of the provinces, autonomous regions, municipalities directly under the Central Government and cities specifically designated in the state plan. >>>More

9 answers2024-03-25

Warehousing and distribution integration is a collection of warehousing, to be shipped, value-added services and other services as one of the warehouse management. The main business is to be shipped, Jiaxing Sutong Cloud Warehouse is a company that provides warehousing and delivery, which can be referred to.

9 answers2024-03-25

Thermal insulation decorative integrated board is a new type of building material integrating decoration, fire prevention, waterproof, energy saving and environmental protection, which has the advantages of stable quality batch, increased production capacity, and is not affected by the environment of the construction site, and has wide applicability, and is widely used in exterior walls, indoors, subways, tunnels and other fields, with great development potential and market prospects. At present, there are many companies with better thermal insulation and decorative integrated boards, such as Baffley.

4 answers2024-03-25

Enterprises applying for the qualification of design and construction integration for the first time need to submit the following materials: >>>More

4 answers2024-03-25

There are four classical second-level disciplines to which the first-level discipline of mechanical engineering belongs: mechanical manufacturing and automation, mechanical design and theory, mechatronic engineering and vehicle engineering. >>>More