If the requirements are not high, you can use an excavator, but it is not good, one is that the excavator may not be able to hit 10 meters deep, and the other is that the excavator may be biased and tilted.
Small pile drivers can be employed.
-
The rectangular section, which should be called a special-shaped section pile, is very strange. Why, so designed? There must be some special reason.
Excavator pile driver, whether it uses an excavator to drive piles, or, like an excavator pile driver. Sorry, didn't get it.
If you use an excavator to drive piles, you have to lift at least a heavy hammer (a big piece of iron or something). It would be dangerous to use an excavator to erect a 10-meter pile and keep it vertical. (Pure guessing, don't be surprised).
If it's an excavator-style piledriver, there's nothing wrong with that. The excavator's bucket was removed and a pole was attached. (It's too strenuous).
Forget it, let's do it anyway. First use an excavator to dig a pit as deep as possible, find a way to 6 8 meters can still be done, and then, bury this pile into it, and the rest is only 2 3 meters on the ground, and then, hang a hammer and smash it down. (The pile head also needs to be protected by an iron hat).
Then, water it every day for a year and then use it again. (This is called a water rammer). That might work.
If you are in a hurry, simply drive the excavator around the pile head and drive a few more laps, and it may be possible to use the method of compaction. Note that burying that pile may require the cooperation of two excavators.
-
A construction method in which piles of various materials are driven, pressed, vibrated or screwed into the foundation soil with special tools. Commonly used methods include hammering, vibration, water injection and pile pressing methods.
Hammering. The impact energy of the pile hammer is used to overcome the resistance of the foundation soil to the pile, and the pile is driven to a predetermined depth, which is suitable for soft plastic or plastic cohesive soil layer. The main equipment used is pile frame, pile hammer, power equipment, etc.
Vibration method. When piling, the high-power vibrating excavator pile driver is installed on the top of the pile, and the vibration force is used to reduce the resistance of the foundation soil to the pile. It is highly efficient to drive piles in sandy soil, and can also be used for sinking and drawing steel sheet piles and steel pipe piles.
Water injection method. It is also known as the water injection pile sinking method. It is an auxiliary method of hammering and vibration method.
Using high-pressure water flow, through the water injection pipe installed on the side of the pile or in the hollow pile, the soil layer around the pile tip is loosened to reduce the sinking resistance of the pile. It is generally used in the sand layer and is very efficient. When the pile tip sinks to about 1 meter from the design elevation, the water injection should be stopped, and the pile should be sunk to the design elevation by hammering or vibration method.
Pile pressing method. With the help of the self-weight of the pile frame and the weight on the pile frame, the pile is pressed into the soil by the reversal of the pulley. The pile pressing method can reduce the noise and vibration of the foundation soil and adjacent buildings when hammering or vibrating the excavator pile, and is suitable for more homogeneous soft soil foundations.
In sandy soil and other hard soil layers, it is not suitable for use due to excessive resistance. Due to the limitation of the height of the pile pressing frame, each pile needs to be pressed into sections, so there are many joints, and the new pile connection process using sulfur cement as the cementing agent has been successful and promoted.
-
Percussion drilling into a hole cast-in-place pile: It is a percussion drilling rig or winch suspended percussion bit (also known as a hammer) to impact up and down to crush the hard soil or rock layer into a hole, part of the slag and mud are squeezed into the hole wall, most of them become mud, and the hole is pulled out with a slag washing cylinder, and then the concrete is poured into a pile. To put it simply, it's piling!
-
1. Fully hydraulically driven, can rotate left and right 180 degrees to operate, simple to operate;
2. It is easy to transport and can be connected with the excavator
3. It can be applied to various work sites, rainy days can also be used in riverside, water surface, underwater operations;
4. It can be driven and dialed steel piles, cement piles, rail columns, iron plates, H plates, and drainage belts
5. Driven by German original hydraulic motor (rotary motor and vibration motor), small in size and light in weight, but can output high power and high speed, high reliability, and strong and durable
6. Advanced oil circuit design, so that the stuck pile and vibration are synchronized, improve the efficiency of driving and dialing piles, better protect the main oil system of the excavator, and the new design of the safety device, when the vibration operation of the safety device makes the chuck automatically tightened, not loose with the pile plate, safe and efficient;
7. Cylindrical stick bearings imported from Japan, low noise, high speed, high reliability, and better quality of the whole machine
8. When driving and pulling piles, the speed and vibration frequency can be adjusted to meet the requirements of different working environments
9. Optimize the design device, the two ends of the protective pile are not easy to be damaged, and the building itself will not be damaged when working in close proximity to the building
10. Adopt well-known brand shock absorbers to reduce vibration and noise, more in line with environmental protection requirements, and improve the lasting reliability of the machine.
Note: When working underwater, an exhaust pipe should be added.
-
In fact, it is not complicated, it is similar to the breaker, the large clamp in front is equivalent to the breaker or an ordinary bucket, and there is a separate button to control the vibration, which is very close to the breaker.
-
The pile driver needs to be modified with a hydraulic vibratory hammer, on which an iron sleeve is clamped on the cement pile, so that the pile will not be broken.
-
Shanghai Zhonglian second-hand excavator market professional answer for you:
1. The dry pile driver can be modified with an excavator, which is actually very convenient.
2. The specific amount depends on how big the brand of machine you need.
3. Shanghai Zhonglian second-hand excavator market has large, medium and small excavators of various brands, you can come and take a look.
-
It doesn't cost much to modify it yourself.
-
Your problem is a bit unclear, let's put it this way, the pile driver and the excavator pile pressing method is different, one is like screwing and the other is like smashing iron nails, if the excavator is a transformed rotary excavator, its hole diameter and trailer fee are not within the scope of rural infrastructure. There is also a pile driver, 100t aperture can be adjusted, the minimum working area is 5*10m, and the trailer fee is 1w
-
The difference in price! The price and cost of the tractor and the excavator are not the same, and the profit is the same.
-
Yes, the piling excavator has a wide range of piling, and different nozzles can be replaced according to different pile types, and 9-18 meters of pipe piles, steel sheet piles, steel pipe piles, prefabricated piles, and wooden piles can be driven.
-
You're talking about steel sheet pile hammers, and you have to relearn if you know how to dig the excavator.
-
It is a rotary drilling rig with different levels of difficulty and is more boring than an excavator.
You are in a different position when pouring from left to right and from right to left.
You multiply your file size by 2 to get the size that you've already occupied. >>>More