If it is only the main construction of the house, excluding the soft decoration in the building, then it takes about 100,000 to 150,000 yuan to build a 100,000-square-meter house. It is important to know that the cost of self-built houses in rural areas is also getting higher and higher year by year, and under normal circumstances, the cost per square meter of self-built houses in rural areas is also more than 1,000 yuan, and the highest can reach about 1,500 yuan. So if you calculate it, a 100-square-meter house will need at least 100,000.
And what we are talking about is actually the average in the industry, maybe some people when building a house, the cost per square meter is less than 1000 yuan, but the materials used in this way must be relatively poor. There are also some people who build a house, the cost price per square meter is more than 1,500 yuan, and the materials selected by these people must be high-end materials. Therefore, the specific construction ** depends on your personal choice of materials.
When building a house, we first have to calculate the ** of the foundation part, and this part of the ** mainly includes the cost of slotting, cushion.
cost, the cost of the pile base, and the ground beam.
Usually these costs add up to about 20,000 to 30,000. Then you have to calculate the cost of the wall, and the main materials used in the construction of the wall are cement, sand, bricks, and the cost of labor. Under normal circumstances, the height of the wall of the house built in the countryside will not exceed three meters, and the number of bricks used is between 20,000 and 10,000, and the current ** of bricks is about 5 cents each, so the bricks alone will cost about 15,000 yuan.
If you calculate other materials and labor costs, then the ** of the wall should be about 40,000. In addition to these, there are also roof construction costs, door and window construction costs, etc., and these miscellaneous costs are basically maintained at about 50,000 yuan. <>
You must know that this does not include soft decoration, if the soft decoration cost is also included, it is more, and everyone's requirements for interior decoration are different, so this cost can not be generalized.
-
It takes about more than 200,000 yuan, and if you add decoration, it will cost 300,000 yuan at most, and it is still very cost-effective to build a house in the countryside.
-
About 3,000 is needed, mainly because the level of consumption in the countryside is not very high. It doesn't cost much to buy a house in the countryside. However, many people are willing to build houses.
-
It costs about 50,000 dollars. In fact, this is not very expensive in the countryside, if it is in the city, it will cost about 100,000.
-
Rural houses, not only different regions, the cost of houses is different, that is, in the same area, the cost of two-story houses with the same area of 1oo square meters is also very different, such as frame structure.
Brick-concrete structure, pure brick wall structure, the cost is different.
How much does it cost to build a two-storey self-built rural building of about 100 square meters?
Now the prices are all in**, and the building materials are also a price a day, and it is not necessarily too cheap to buy a house and build it yourself. Rural own housing homesteads.
are divided according to the population, if their homestead area is enough, there is no need to spend extra money to buy, if not enough need to buy, the rural homestead foundation ** in 300 to 500 or so a flat.
The materials needed to build a house are, sand.
gravel, cement, rebar, bricks, etc. In my hometown, because of the reason for the sale of red bricks in many places, the red bricks have to be about 8 cents, and now the red bricks have to be booked to buy, and the sand is now about 270 or so, the gravel is about 165 or so, the cement is about 650 a ton, and the steel bar is about 4800 a ton. These data are basically about 100,000.
Artificial ** is now working in various places.
Generally ** in the range of 300-600, about 200 small workers, (generally rural housing neighbors will come to help, small workers generally do not use) the fastest time to build to the completion of the time is about three months, so that a worker is about 20,000, and the workers use more about 100,000.
The small suggestion of building a house can save money for self-built rural buildings.
There are a few suggestions when building a house, and if you use it well, you should be able to save money. First of all, it is recommended to build a house in the opposite season, avoiding the peak season of building a house, so that the price and materials are cheap, for example, there are few people who build a house in spring and summer, and you can choose to build a house at this time; Secondly, it is recommended to buy data on the Internet such as a treasure, which can save a lot of money; Finally, when decorating, choose to buy materials by yourself, not all-inclusive, you can save a lot of money, and the quality can be guaranteed.
It takes about 200,000 yuan to build a two-story self-built rural building of about 100 square meters; And if you add decoration, the cost is 140,000, and the total is about 340,000. However, the prices are different from place to place, and there may be differences, but they should all be about the same.
Epilogue. Two or three hundred thousand yuan, in a big city it is estimated that you can't even afford a down payment on a house, and you can have a small bungalow of your own in the countryside, what an actionable thing. It's just that the rural areas are generally inferior to the big cities, although the integration of urban and rural areas has been promoted.
But there is a difference. In rural areas, travel is not as convenient as in the city, and there are not as many opportunities for young people to choose if they want to find a job, which can be regarded as a pros and cons. It's up to you to decide.
-
Now the cost of building a house in rural areas is relatively low, if you want to build a house of more than 100 square meters, the budget is about 70,000 or 80,000 yuan.
-
About 500,000 yuan is needed, because it is very difficult to build a house in the countryside now, and the policy of building a house in the countryside is now restricted. So there are a lot of places that need to be spent.
-
If you want to build a house of more than 100 square meters in the countryside, the funds need to be about 10 200,000 yuan, because the house of 100 square meters is not very large, and it is also because you have to buy materials to build it, and it is very cheap to build, which can save a lot of costs and costs.
-
It takes about 300,000 yuan to build a house of more than 130 square meters, but if you add decoration, it will cost more than 500,000 yuan.
-
The cost of building a 100-square-meter house in the countryside can be affected by a number of factors, including location, building materials, labor costs, and more. According to the market price of the dusty land, a ** range can be roughly given.
If you want to know the specific decoration**, you can use the "decoration artifact" ** device to calculate, just enter the area + city, immediately calculate the local decoration**, list the detailed list of 102 decorations, so that you don't have to worry about overspending on the decoration, click here to start calculating: [3 seconds to get the local decoration**].
First of all, building materials are one of the important costs of building a house. Common building materials include cement, bricks, rebar, etc. According to the local market price, it is possible to roughly estimate the ** of the material.
Taking cement as an example, the ** of each bag of cement is between 10-20 yuan, and the amount of cement that needs to be purchased will vary depending on the size and structure of the house.
Secondly, labor costs are also one of the important expenses for building a house. Based on the local wage level and the number of construction workers, labor costs can be roughly estimated. Generally speaking, the salary of construction workers is between 200-300 yuan per day, and the number of workers required will vary depending on the length of the construction period and the intensity of the work.
In addition, there are other costs that need to be taken into account, such as design fees, construction management fees, equipment rental fees, etc. These fees are on a case-by-case basis and can be estimated based on local market prices.
Taking into account the above factors, the approximate cost of building a 100-square-meter house is between 10-200,000 yuan. Of course, this is only a rough estimate, and the specific Brother Fei is useless and needs to be adjusted according to the actual local situation.
In general, building a 100-square-meter house requires a number of factors such as building materials, labor costs, and other expenses. Based on the local market price, you can roughly estimate the range of costs. The final fee will also need to be adjusted on a case-by-case basis.
Tuba Rabbit is one of the largest decoration platforms in China, with a total of more than 41 million owners, 110,000 decoration companies, covering more than 300 cities across the country, user reputation is very good, not only to meet your decoration needs, but also to provide professional decoration companies according to your budget, want to find a good company, learn more about decoration knowledge on Tuba Rabbit, click here, free 1 to 1 for your home decoration services: [Tuba Rabbit ** official website].
-
How much does it cost to build a 100-square-meter house on the first floor in the countryside? Judging from the question, the subject's homestead is not too generous, not enough, if the family is not large, the first floor will be more practical. How much it will cost depends on the local labor and building materials**.
The following set of cases is from a rural village in Zhuzhou, Hunan, where the house was started.
The house is a double detached house built by the owner and his sister, mainly used to go home to live on holidays, with 2 bedrooms, 1 living room, 1 kitchen and 1 bathroom, with a construction area of 220 square meters and a single family of 110 square meters.
Because of the humid rainy season in Hunan, the basement was built as a garage and miscellaneous houses, and the houses were as high as the branches.
The one-story building was completed quickly, and the main cost of labor and materials was 160,000 yuan, and the owner and his sister paid half of it, that is, 80,000 yuan, which is still very cost-effective.
According to the subject's requirements, if the brick-concrete structure is built, the whole package will be given to the rural construction team, about 1,200 yuan per square meter, and the main cost of a 100-square-meter layer is about 120,000 yuan. If you want to save more money, then hire a part-time worker and buy materials to build it yourself, although it takes a lot of effort and effort, but it can be done for almost 100,000 yuan.
The following is to share a few sets of one-story houses with friends who have the same problem as the subject, and the self-built houses in the new countryside should not only save money, but also take into account the comfort and rationality of the layout and the beauty of the appearance of the residence.
Simple European style, very suitable for the new countryside self-construction, this house occupies an area, floor area, construction area, a total of 3 bedrooms, 2 living rooms, 2 bathrooms, 1 kitchen, 1 cloakroom.
If the subject feels that the above set of area is too large, you can also take a look at the following set of Chinese-style wind culture closed grid courtyard, this set of units covers an area, covers an area of 104, construction area of 104, simple Chinese style, no extra decoration, the overall cost will not be too high.
Since the original design of the owner used this house as his own holiday cottage, a large office area was designed to facilitate their own work, and everyone can also change it into a hall or living room according to their needs.
-
Building a 100-square-meter house in the countryside requires a large cost of about 25-300,000 yuan.
Among them, the cost of the main part is about 12-150,000 yuan, the cost of the decoration part is about 8-100,000 yuan, and other expenses (such as water and electricity, doors and windows, exterior walls, etc.) are about 50,000 yuan.
-
This problem is a bit bad, because the regions are different, the price level is different, and the cost of building materials is inconsistent, so the total cost of building a building of the same scale and style must be different, and it is very different. So there is no standard answer to this question, it can only bring you a certain reference value.
Next, I will take the situation of the local building materials market to briefly calculate the input costThe main structure of the building is different, such as brick concrete, wood or frame, etc., and the results obtained are of course completely different, so we use the brick and concrete structure that is common in rural areas.
Let's do the math! <>
The construction of houses in rural areas is relatively simple, and there are basically no design drawings and construction drawings, so the investment in this area is basically non-existent; At the same time, the construction of balconies, stairs, roofs and floor floors of houses is basically made of reinforced concrete.
Water; Most of the walls are made of green bricks.
Masonry. In this way, when we calculate, we can divide it into parts.
1. The input cost of green bricks. I only make a general estimate here, each piece of green brick from the brick factory to the wall, including the freight cost, labor cost, cement, yellow sand, etc., on average, about yuan; The two-storey building covers an area of 100 square meters, and the total construction area is 200 square meters, which is about 10,000 bricks.
Then the total cost of green bricks is about 10,000 yuan.
ConcreteThe total cost. The construction of rural buildings requires the use of a large amount of concrete, mainly stairs, floors, roofs and balconies, etc., and the total cost is roughly estimated to be about 50,000 yuan.
Structural columnsconstruction costs. Brick-concrete buildings, structural columns and ring beams between walls.
Otherwise, the whole building will be in a very unstable situation, and such a building is a dangerous building and cannot be inhabited. The construction cost of structural columns and ring beams is about 60,000 yuan.
4. Housing decoration costs. Decoration is a bottomless pit, depending on the preparation of your funds, it may be tens of thousands of yuan, or hundreds of thousands of yuan. According to the simple decoration of ordinary families, it is roughly estimated that it will cost about 100,000 yuan.
5. The cost of infrastructure construction of the house. The foundation part is not easy to measure, because the situation of the underground part is more complex, and it needs to be roughly measured after the actual construction starts. Anyway, the cost of this part may be low, but it may also be very high, depending on the local excavation, backfill, the distance of the stone, etc., so I will not include it in the construction cost here for the time being.
Through the calculation of the above parts, the total construction cost is about 10,000 yuan, excluding the cost of the foundation part.
To sum up, the total cost of building a two-story building covering an area of about 100 square meters in the countryside is about 300,000 yuan, not the pursuit of high-end and atmospheric, but the style of general living in the countryside. In the actual construction process, there may be a variety of unexpected influencing factors, which will greatly increase the construction cost, so it is really not easy to build a house in the countryside!
Do you think my calculations are reasonable? How much do you think is needed?
Well, if you want to build a two-story house, you should first ask if you only build two floors and then don't want to build more, or build two floors first and wait for the money to complete all the floors? Then I'll divide it into two types: >>>More
First of all, you have to meet the various application conditions stipulated by the state, if you do, it will be easy to do, you can communicate more with the village leaders, and it will generally be approved. If you don't meet the conditions, you can consult with the leader further, and if you have a better relationship, you can move around more, considering that both parties can get benefits, and the application may be successful. <> >>>More
In the past, self-built villas in rural areas did use more lime powder. Now the people who use it have beenThere are not many menstruations, but you still need to use some points when you cover them. The subject asks why it is used less now. >>>More
It should be a matter of quality.
There are many reasons for this, and the amount of cement used during construction is insufficient. >>>More
I think the homeowner only needs to take 10% 20% of the blame because the homeowner hires a team of engineers.