-
This is not possible unless you have people in the background, so you can. You record orders across outlets.
-
It is recommended not to come to the United States to apply for customer service recruitment, saying that the customer service actually came only to find out that it was an information officer,** , just off work, it is a day of obligatory overtime, the shoulder hurts, there are still a lot of things that have not been dealt with, there are too many things to be upset and responsible, md, customer service is me, the record is me, dozens of orders a day manual recording table, md and two systems to get, but also to send workers to the master, follow up the list is me, and the master docking is me, the work will never have a head, the longer the time is in, the more things are more, the annoyance is very, the machine problem master professional problems have not been dealt with well and have to deduct our wages, I am a person, not a machine, a typical Zhou peeling company, a day of required to deal with the work has been overloaded or on the basis of the two hours of compulsory overtime is still a lot, 12 o'clock at noon to the time of eating instant noodles in the company, and not all the time to rest, after work to deal with the list of problems in a timely manner, I have a sentence MMP especially want to say, in addition to going to the toilet and eating has not left the post has been doing things, after work to deal with, of course, if you are procurement and management do not have to look, less things on time off work high salary, sick, to be honest, what to do on that salary is not good, things are too little, the only benefit can ** , I ate a lot of work for 5 days and lost weight, but I am prone to stomach problems, frozen shoulder, and the spine is particularly prone to problems, and I am now thinking about being able to get money** Insist, ready to leave after a maximum of 3 months, do not want to drag across the body for this money, this kind of company does not pay attention to the development of employees at all, just want to squeeze employees, especially our position, get the lowest wage, responsible for the most things, the most work, the most gas, the most assessment, every day compulsory overtime, work, normal off work above 19 o'clock, at the time of 18 o'clock, several times overtime to more than 20 o'clock, hope to see the netizens do not make an appointment for installation and maintenance in the future, I am now very irritable at more than 17 o'clock, take the order and increase the workload, which means that the overtime time will increase the annoyance very, MD, and quantity and qualityI think I'm a machine at work all day, and I don't want to go to work in advance, so I go to work again, and as soon as I turn on the computer, I constantly have things to deal with, like a volcano that keeps erupting, it will only grow more and more, and it will never stop, and it will never have a head.
-
Of course, this can be logged in across outlets. As long as it's the same **.
-
Midea's engineering machine should not be able to record orders across outlets, and this should be done on an exclusive interview, otherwise, this should not be recorded.
-
There is no way to record this list of mining outlets, normally this function is not supported, generally speaking, only this area can be alone. Yes.
-
Leave the contact of the local Midea air conditioning maintenance outlets** to facilitate the user's future service contact, otherwise the negative incentive is 100 yuan. It can be submitted in two installments per month, but generally not more than twice (except for engineering machines).
-
Midea's engineering functions can be sold across regions, and it can be installed after sales, but it cannot be sold in stores, otherwise it will be regarded as cross-shipment.
-
It is recommended to consult with the local sales company to confirm.
If you still have questions, you are welcome to ask questions to the company in the United States; I wish you a smooth work and a happy life!
-
Engineering machine is an air-conditioning equipment that provides ambient temperature, humidity and cleanliness guarantee for the reliable operation of industrial product production process or industrial process equipment.
Air conditioning engineering machines are also called industrial air conditioners. The design of industrial air conditioning is to ensure the process requirements as the main purpose, and the comfort of indoor personnel is secondary.
The products belonging to industrial air conditioners include: constant temperature and humidity air conditioners used to ensure the normal operation of electrical control room equipment, low-temperature unit air conditioners used in meat processing workshops, and mobile overhead cranes in steelmaking workshops.
special air conditioners for high-temperature environments, etc.
-
The air conditioner engineering machine is 1 customer, which is generally required by the company, and the number of air conditioners to be purchased is more than 12 units. The company made him an engineering machine. The engineering machine is specially made by the manufacturer, and there is no choice. Cheaper than the market.
The engineering machine of my Gree air conditioner is similar to the ordinary market machine, which is 1 point different, and there is no room for customers to choose. Installation, delivery, and repair are the same. **It is very different from other brands.
Engineering machines must be installed in 1 unit. It should not be installed anywhere else, but should be photographed.
-
Engineering machine refers to a unit or company specific number of 12 or more customized models, basically used for engineering applications, the function is different from that of household air conditioners, more consideration of engineering effects, rather than human experience.
Not recommended for home use.
There are also some engineering machines are some dealers for the performance of the low-cost model, the name of the upgrade, the use of the user's greedy and cheap psychology, it is recommended that you do more to understand.
-
In other words, the new product is not available yet.
-
The minimum cost of 30,000 yuan for the whole machine can be reported as an engineering machine.
-
It seems that you can apply if you have more than 8 units.
Midea air conditioning quality is very average.
-
Forget it, you're still the boss, you don't know how to apply for an engineering machine, you're too stupid.
-
Generally, it is a unit procurement, which is directly changed to the enterprise to handle the payment, and the rebate of the regional ** is generally not very high, but the quantity is large.
-
In a word: it is easy to do if there is a business, and it is not easy to do without a business.
-
Midea air conditioners can be said to have the highest failure rate, and most of the engineering machines are produced with cheap accessories, which are low, but the quality is not as good as ordinary machines.
-
The after-sales service of the general engineering machine is only one year, and the after-sales of the ordinary machine is 3 years. Engineering machine refers to the equipment provided for some projects, the purchase quantity is large, used in hotels and enterprises and institutions of equipment, due to the large competition of engineering machine projects, so the transaction price is relatively low.
Midea electric water heaters are produced by Midea Group's secondary industry group - Midea Household Appliances Group.
Midea Daily Household Appliances Group is a secondary industrial group of Midea Group, and is a comprehensive manufacturing enterprise with consumer appliances as its leading products. The group has the largest and most complete industrial cluster of small household appliances and kitchen utensils in China.
-
Everything is the same, but engineering machines are cheaper.
-
Yes, Midea's commercial ** air conditioner has done a very good job and has a very large share in the air conditioning market.
-
Some. You can contact your local sales center to purchase it.
-
Yes, you can go to the mall or the distributor to find out: there is a designated engineering model.
Advantages: The hydrological situation of the Yellow River is very complex, in order to ensure that the Yellow River crossing project is foolproof, the Ministry of Water Resources has organized the Yangtze River Design Institute and the Yellow River Committee Design Institute to independently design two schemes for the aqueduct to cross the Yellow River in the air and the tunnel to cross the Yellow River in the ground, and conduct comprehensive research and selection. After repeated arguments, the experts finally chose the tunnel piercing scheme. >>>More
It is best to take the vehicle test for undergraduates in mechanical manufacturing, automation, electromechanical, materials, and mathematics, and it seems that mechanics is okay, but the others should be a little difficult.
Are you talking about the air conditioner not starting, it's best to find a professional air conditioner maintenance person to take a look, let him check the specific reason, he generally can't solve it.
There are many reasons why the air conditioner can't be turned on: the first remote control reason: 1. The screen is garbled or frozen. >>>More