What materials are required to register a solar installation and repair company

Updated on home 2024-06-09
3 answers
  1. Anonymous users2024-02-11

    1. Natural persons.

    1. The original and copy of the ID card of the person in charge.

    2. The original and copy of the real estate certificate (or the certificate of use of the house issued by the township and the superior).

    3. For public rooftop photovoltaic projects, it is also necessary to provide the consent construction certificate of the property, the owners' committee or all the owners in the same building, as well as the use or lease agreement of the building and facilities.

    4. For contract energy management projects, it is also necessary to provide the contract energy management cooperation agreement signed by the project owner and the electric energy user.

    5. If it is an agency situation, it is also necessary for the project owner to issue a "Power of Attorney for Distributed Power of Attorney for Grid-connected Business".

    6. A copy of the bank card (it must be consistent with the project investor, indicating the name of the specific network point of the opening bank).

    7. The user's electric energy meter ** (the table number is clear), and the panoramic view of photovoltaic installation**.

    2. Legal persons and other organizations.

    1. The original and copy of the ID card of the person in charge, and the original power of attorney of the legal person (person in charge); or the original and photocopy of the ID card of the legal person (person in charge).

    2. Business license, tax registration certificate, organization certificate, land certificate and other project legality supporting documents.

    3. The geographical location map of the power supply project (indicating the direction, adjacent roads, rivers, etc.) and the relevant agreement on site rental.

    4. ** The investment department agrees with the approval or explanation of the preliminary work of the project (only applicable to projects that need to be approved or recorded).

    Solar PV cherry destroying system installation requirements:

    1. Solar photovoltaic power generation system installation requirements: determine whether your house is suitable for installing residential solar energy system. To install a rooftop solar system, it is necessary to assess the firmness, area, and orientation of the roof.

    2. Solar panels should face west instead of south: When installing solar panels on rooftops, we are usually told to install them facing south. But the researchers found that west-facing installations were the most cost-effective.

  2. Anonymous users2024-02-10

    Legal analysis: You can call 95598 for consultation first, and then go to the nearest power supply business hall to apply for it. If you are using a public area, you need to provide proof of consent from other owners, property owners, and neighborhood committees.

    Legal basis: "Interim Measures for the Supervision of Photovoltaic Power Generation Operation" Article 5 The competent energy department and its dispatched agencies shall supervise the implementation of the power licensing system of photovoltaic power generation project operators and power grid enterprises. Except for photovoltaic power generation projects exempted from electric power business licenses in accordance with regulations, other grid-connected photovoltaic power generation project operators shall apply for electric power business licenses。

    The licensed business entity shall maintain the licensing conditions, and if there is a change in the licensing items or registration items, it shall go through the change procedures in accordance with the regulations.

  3. Anonymous users2024-02-09

    What certificates do I need for solar PV installation? What qualifications?

    Pro, "Photovoltaic power station installation qualifications: business license, Anhe Congquan production license, project manager digging shed erection, technician, safety officer. The registered capital of the enterprise is more than 300 million yuan.

    The net assets of the enterprise are more than 100 million yuan, the average annual project settlement income of the enterprise in the past three years is more than 1.5 billion yuan, and other conditions of the enterprise have reached the first-class qualification standard. Construction qualification documents: qualification certificate, business license, safety production license, organization certificate, tax registration certificate, to the safety supervision station where the enterprise is located to apply, a total of the main form and attachments need to be filled. ”

Related questions
5 answers2024-06-09

Developed countries have long proposed possible implementation plans for future solar power generation. >>>More

16 answers2024-06-09

It's convenient, it's cost-effective, and it's cheap. Electricity is used on a regular basis. **You don't have to pay so much. And it's often sunny on our side. So. Particularly practical.

8 answers2024-06-09

Solar street lights are lighting devices that use solar energy to generate electricity and store electricity for street lighting. It has the advantages of independent power supply, no wiring, energy saving and environmental protection, and is widely used in urban roads, rural roads, parks, squares and other places. The technical parameters of solar street lights mainly include the following aspects: >>>More

10 answers2024-06-09

The following information is required to register a company: >>>More

8 answers2024-06-09

1. The stored water in the solar water heater needs to be discharged regularly to avoid pollution caused by long-term water accumulation. The discharge cycle is determined by the local water quality conditions, and the discharge can be done in the morning when the collector temperature is lower. >>>More