-
Kitchen cabinet decoration, generally speaking, takes at least two weeks to move in, if you move in as soon as possible, it is recommended to take the following measures to remediate:
1. Physical removal of formaldehyde: activated carbon is a kind of physical adsorption, like activated carbon, nano live ore, bamboo charcoal, which is very safe and harmless to the human body.
2. Plant removal method: select and place plants according to the different functions and size of the room. Like aloe vera, spider plant, pothos, tiger pill orchid, one-leaf orchid, ivy and these.
3. Clean water absorption method: When the new house is deodorized, put a few basins of water in the new house, and put vinegar, green onions, orange peels, etc. in the water, which can not only absorb the residual odor in the room, but also protect the paint surface of the wall after water evaporation. The water absorption method for deodorization of new houses is not only simple, convenient and economical, but the water needs to be changed twice a day.
Simi Cabinet uses the highest level of safety in the industry, the most practical laminate structure; The white laminate tray is integrated with the color of the cabinet body, which is more beautiful; Embedded installation, the safest card slot installation process in the kitchen cabinet industry, to avoid the occurrence of potential safety hazards.
Simi is a good choice, Simi cabinets use the highest level of security in the industry, the most practical laminate structure; The white laminate tray is integrated with the color of the cabinet body, which is more beautiful; Embedded installation, the safest card slot installation process in the kitchen cabinet industry, to avoid the occurrence of potential safety hazards.
-
It takes at least 10 days to move in, and there are many steps to decorate the kitchen, such as tiling the walls and floors, installing cabinets, and buying household appliances. After the tiles are laid, it takes 24 hours for them to set initially, and at least a week for them to set completely. After the tile is paved, the tile must be inspected, especially the hollowing problem, and then the cabinet must be installed, in short, it will take at least half a month to move in.
What to pay attention to in kitchen decoration.
1. Kitchen tiles.
Kitchen decoration is commonly used tiles, especially ground decoration, the ground tiles should be non-slip, wear-resistant, but also consider the cleaning aspect. And the tile should also choose a good tone, if the kitchen light is poor, you can now use light-colored tiles to avoid the kitchen light is too dark.
2. Kitchen ceiling.
Kitchen ceiling is an important part of the beam, the commonly used ceiling material is aluminum gusset ceiling, which is used in most families. This kind of ceiling has the characteristics of fire prevention and heat resistance, and the gypsum board ceiling is also good, and the jujube seepage has strong water resistance and good waterproof effect. The kitchen is renovated with a suspended ceiling that is not only beautiful, but also convenient for cleaning oil stains.
3. Kitchen storage.
In order to make the kitchen look cleaner and tidier, the kitchen must be renovated to store the stool stove. You can design more wall cabinets, storage shelves, etc. in the kitchen, and the wall space can be fully utilized, and the kitchen utensils can be hung on the wall to save space.
4. Kitchen area.
The kitchen area should be moderate, generally about 10 square meters, which can make reasonable use of space. When decorating the kitchen, you should also pay attention to the lighting and ventilation problems, because the kitchen smoke is relatively large, if the ventilation effect is not good, the oil smoke will not be able to emit, resulting in bad air.
Summary: The above is about how long it takes to stay in a kitchen, I believe everyone understands! There are many places that need to be paid attention to in kitchen decoration, if you don't know it, you can take a look at the above content.
-
Summary. It takes about half a month for the newly made kitchen cabinets to be used. After the cabinet is ordered, the material used will release a certain amount of formaldehyde, so it is necessary to open the cabinet door and ensure that the kitchen is well ventilated.
Then wait until about half a month, the formaldehyde concentration in the cabinet decreases, and you can use the cabinet to stack things.
It takes about half a month for the newly made kitchen cabinets to be used. After the cabinet is ready, the materials used will release a certain amount of formaldehyde, so the cabinet door should be opened and the ventilation effect of the kitchen should be ensured. Then wait until about half a month, the formaldehyde concentration in the cabinet decreases, and you can use the cabinet to stack things.
1. How long can the newly made kitchen cabinets be used, and the newly made kitchen cabinets can be used for about half a month. After the cabinet is ordered, the material used will release a certain amount of formaldehyde, so it is necessary to open the cabinet door and ensure that the kitchen is well ventilated. Then wait until about half a month, the formaldehyde concentration in the cabinet decreases, and you can use the cabinet to stack things.
2. How to install kitchen cabinets 1. Before installing cabinets, it is necessary to divide the location of the stove, sink and kitchenware cabinet, so as to better formulate suitable cabinets and ensure the later use. Under normal circumstances, the distance between the sink and the kitchen utensils is closer, which is more convenient to use, and the sink should be far away from the switch socket to avoid water gradually entering the switch socket. 2. When designing the cabinet, it is also necessary to take into account the height of the problem, which should make the use of Nabi socks more square and convenient.
If the height of the user is relatively short, then the cabinet should not be designed too high, otherwise it is very inconvenient to use in the later stage, of course, it should not be too low, otherwise you have to look down to find something at all times, which is very tiring. 3. The range hood is also one of the indispensable electrical appliances in the kitchen, which can absorb the oil smoke generated inside and discharge it into the room to ensure that the indoor air is clear. However, the choice of range hood is also particular, not only to see the layout of the room, but also to see the situation of personal use.
-
1.After the installation of the ceiling is completed.
Kitchen ceiling installation can improve the overall grade of the kitchen, ceiling installation can bring out the decoration design characteristics of the kitchen, the ceiling should choose environmentally friendly and easy to clean and wipe materials in the selection of materials, because in the process of cooking in the kitchen, even if there is a range hood, but can not ensure that all the fumes are removed. After the ceiling installation is completed, the cabinet is installed again, the actual space height of the kitchen after the ceiling installation shall prevail, the best installation height of the wall cabinet is measured, if the ceiling is installed after the hanging cabinet, it is not only not conducive to measuring the height, and in the process of installing the ceiling, the decoration material waste can not be avoided from falling down, affecting the overall aesthetics of the cabinet.
2.After the installation of the kitchen door cover is completed.
After the installation of the kitchen door cover is completed, it can be convenient for the construction personnel to estimate the installation size of the cabinet, as well as the design of the specific structural layout of the cabinet installation.
3.After the kitchen paint is finished.
Kitchen construction and installation is a big project, and the kitchen is installed after the kitchen is painted, so as to avoid the paint from polluting the cabinet during the painting process, resulting in very troublesome cleaning and difficult to organize.
4.After the hydropower retrofit.
Hydropower installation is the most basic functional facilities in the kitchen, before installing the cabinet, we must install and lay the kitchen water and electricity lines, the general water and electricity lines are installed in a hidden place, the best installation place is the ground. If the water and electricity lines are not laid before the cabinet is installed, then the subsequent project will be very difficult, because after the cabinet is installed, the water and electricity will be laid, and the tunnel must be dug and the pipeline will be laid, which will affect the cabinet design.
-
After the completion of the kitchen wall and floor tiles and the kitchen ceiling, the conditions for installing kitchen cabinets are met.
-
Cabinet installation involves the installation of countertops, and the countertops of general artificial stone, marble and other materials will produce a lot of dust during installation, so as long as the tiles, floor tiles, and ceilings in your kitchen are all done, you can install them, but you must remember to be in place before you arrange the furniture.
-
We installed the cabinets after installing the water and electricity, and before the floor.
-
After the floor is laid and painted, when the overall cabinets are installed, the house is basically finished
-
Decoration cabinets are generally after the bricklayer has finished leveling and the ceiling is installed, and you can enter the site, and ask the carpenter to make the cabinet or install a custom cabinet. Cabinet installation involves the installation of countertops, and the countertops of general artificial stone, marble and other materials will produce a lot of dust during installation, so it is necessary to make all the tiles, floor tiles and ceilings in the kitchen.
What material is good for cabinet doors?
1. Solid wood type Qingshen, solid wood cabinet door panel, with natural texture, is also more environmentally friendly, the surface of the solid wood door panel can be concave and convex modeling, external spray paint, it looks more high-end.
2. Paint the door panel, the paint plate is rich in color, the surface is brighter, and it is easy to clean, waterproof and moisture-proof, and the fire performance is also better.
3. Fireproof door panel, the color of the fireproof door panel is relatively bright, with a variety of characteristics, wear-resistant, high-temperature resistant, scratch-resistant, etc., it is also relatively easy to clean, and can be moisture-proof, non-fading and other advantages.
4. Hydronamine veneer type, this kind of cabinet panel has many colors, and the texture of the panel is mostly different, the surface is relatively flat, not too deformed, and has the characteristics of wear resistance and erosion resistance.
5. Blister door panel (PVC molded board), blister board belongs to MDF, uniform color, has the characteristics of no cracking and no deformation, can be scratch-resistant, heat-resistant, stain-resistant, anti-fading, is one of the more suitable materials for cabinet door panels.
What should I pay attention to when making cabinets?
1. When installing cabinets, we should pay attention to a reasonable layout, not only to facilitate the use of the kitchen, but also to reflect the aesthetics, such as the placement of the stove appliances should be far away from the pool on the countertop, and the power plug should be close to the stove appliances, so as to facilitate the use and prevent the potential safety hazards of electricity.
2. Check whether the color of the quartz countertop is consistent with the color when you purchased it; Secondly, we can use a harder sharp weapon on the table to test the effect; At the same time, it is also necessary to see whether the countertop interface is slender, the finer the better.
3. We will generally carry out some rectification before installing the cabinet, and there will be some discrepancies with the original design drawings, so we must make rectification in time when installing.
4. Whether the wall cabinet is installed well or not, the straight tank rubber connection affects the installation effect of the cabinet, which requires us to pay attention to ensuring the quality when installing the wall cabinet, ensuring the level of the wall cabinet and the ground, and the wall vertical. At the same time, after the installation of the wall cabinet, the levelness of the wall cabinet should be checked.
5. When installing cabinets, although the installation and matching of large parts are very important, the installation of hardware can not be sloppy, because hardware is the premise of convenient use of cabinets, if the hardware is not installed, it means that the use of cabinets is also a problem. Therefore, the small parts of the cabinet should not be neglected. You have to take a closer look at the front and back of each door panel, whether there are scratches or inconsistent colors.
-
It mainly depends on the size and complexity of the cabinet, and generally two or three days is enough at the earliest.
-
Look at whether the master is professional or not, it can be done in one day, and you can find an installation master at home in Luban to install.
-
Most of the formal cabinet installation is done in the factory, and the customer's home is only assembled.
The length of time it takes to install the cabinet is not fixed, and depending on the material chosen, the final construction period will also have a certain impact. For example, solid wood cabinets take a relatively long time, which may take about 60 to 80 days, while if you choose cabinets of other materials, the time required is about 30 to 60 days.
-
The installation time depends on the degree of complexity, the size of the cabinet and the speed of the master's installation, generally simply 1 day, complex, such as the cabinet is 10 meters faster, the wall cabinet is covered with a range hood, there is a top line to resist the ceiling installation, and the wall cabinet perforated tiles are all made of glass drill bits to hit the full tile, which is much slower. About 2 days. Of course, small workshops or small brands, the masters are the kind of work in the market, and it is normal to have two sets a day, because it is too simple and has low requirements.
8 years to install pass-by.
-
<> double veneer takes at least 8 to 9 days, and lacquered boards and solid wood boards take about 28 days. Customized overall cabinets need staff to come to the field to measure the size, designers need to communicate with customers, customize the plan according to the needs, and start production and installation after determining the overall cabinet production plan. If it is a custom-made cabinet, you can order the material, style, color, etc. and design style of the cabinet first, and it can be completed in 8-9 days.
-
In the decoration process, it is better to install the whole kitchen after the overall hard decoration is completed, that is, after the floor is paved and the paint putty on each wall is brushed.
-
Personally, I feel that at the beginning, because the amount of work in the kitchen is relatively large, it is not easy to design, so it may be better to install it at the beginning.
-
I think it's better to install it after the renovation is done in other places. This way, you don't have to worry about other problems happening.
-
If you should do this, it is more convenient, when decorating, it is also easier, and most importantly, it helps to improve the overall appearance.
-
You can install a flood guard, when the water reaches the "effective liquid level line", it will sense, and immediately send you a prompt message on the mobile phone app, my aqara flood guard experience is very good, the bear children at home play with the water hole, every time there is a prompt to tell me, never made a mistake.
During the renovation period, it may also need to be re-dimensioned, and after the basic kitchen decoration projects such as water and electricity renovation, ceiling, wall, and floor finishes are completed, the cabinet can be installed. I went to the field to see the comparison with the outside, and finally chose the current set, I, like many people, don't know anything about cabinets, I have seen and studied for a while, and now I share some tips for choosing cabinets. >>>More
I'm the same as you, I also considered whether it was convenient to clean when I installed the cabinets, because I was usually busy with work, and I came home quite late, and then I was tired of doing some complicated housework, so I specially installed a set of Banberg, this stainless steel cabinet is easy to clean up, because the countertop is one, not splicing, so there are no seams, there is no place for the ash to get stuck, it will be clean when you wipe it, the corners are also sleek, it is curved, and the residue is never a problem that I am worried about.
If you don't want to spend too much money, it is recommended to find a decorator to help you make it, which can save a lot of money.
When decorating the kitchen, you can try to use warm colors to make the whole kitchen appear warmer. The best combinations for kitchen renovation are white and red, yellow and orange. Creamy white with pale yellow. Wood with green. Brown with gray.
If possible, I recommend that it is better to choose a one-piece cabinet, which is not only neat and clean, but also beautiful. For electrical appliances, you can choose the one that matches the cabinet.