What are the processes of home renovation design?

Updated on home 2024-02-24
11 answers
  1. Anonymous users2024-02-06

    1.Pre-design.

    Before decoration, it is necessary to clarify the tiling area, wallpaper area, floor area and tiling area of the house, and at the same time, measure the wall size of the furniture placed in the decoration design.

    2.The main body was dismantled and transformed.

    The main demolition mainly includes the demolition of the wall, the construction of the wall, the shovel of the wall, the removal of heating and the replacement of plastic steel windows and other projects, the garbage generated after the demolition, to clean up the room in time, to ensure the cleanliness of the room, for the future construction preparation.

    3.Retrofitting waterways and electrical circuits.

    Before the hydropower transformation, the cabinet designer needs to measure and determine the exact location of the lamps, basins, bathtubs, washing machines and switches, so as to formulate the hydropower transformation plan and design the location of the power supply and interface. The air conditioner and power supply should be placed on this wall at the head of the bed as much as possible to prevent it from blowing directly on people.

    4.Paste wallpaper.

    After the putty and wall paint are painted, the painter will paint the nitro paint in the place where the wallpaper needs to be pasted, and after the nitro paint on the wall is completely dry, you can choose your favorite wallpaper for paving.

    5.Install the socket panel.

    This project only takes half a day to complete the installation, but in the installation process, pay attention to the use of sockets with switch function as much as possible, electrical appliances can be directly controlled by switches, without repeatedly plugging and unplugging the power supply, it is more convenient.

    6.Install cabinets.

    When installing cabinets, you can buy range hoods, sinks and stoves in advance and install them together with cabinets, saving time and effort.

    7.Install the finished door.

    The finished door is installed earlier than the floor, because there are not only many cumbersome steps to install the finished door, but also a lot of tools are required, and if the finished door is installed after the floor is installed, it is easy to cause the floor to bump.

    8.Install the hardware.

    Scraps such as drying racks, curtain rods, light fixtures, sanitary ware, and bathrooms should be completed before the floor is installed, otherwise it is easy to cause damage to the floor.

    9.Install the flooring.

    When installing the floor, try not to let the workers cut the floor tiles indoors, otherwise it is easy to cause damage to the floor tiles that have been laid.

    10.Post-decoration.

    When the frame of the whole house is figured out, add some later accessories, such as curtains and decorations, according to the decoration style and space design.

  2. Anonymous users2024-02-05

    1. Home improvement consulting.

    Now the decoration is generally handed over to the decoration company for construction, so when the decoration is carried out, you need to find the decoration company, and then connect with the designer to discuss the decoration style, cost and project time.

    2. On-site measurement.

    The designer conducts on-site investigation and comprehensive investigation of the room to be decorated by the customer, so as to carry out the home decoration design more scientifically and reasonably. After the measurement, the floor plan of each room in the room is drawn according to the scale, and the length and width of the room are indicated in the floor plan, and the location of doors, windows, and heating covers is indicated in detail, and the placement of new furniture is indicated at the same time.

    3. Sign the contract.

    After deciding on the renovation company and discussing the cost, the two parties inadvertently sign the contract and clarify the responsibilities and rights of both parties.

    4. On-site disclosure.

    The customer, designer, project supervisor and construction person in charge will participate in the project, and the designer will explain the budget items, drawings and special processes to the construction person in detail on site, and coordinate the relevant procedures.

    5. Material acceptance.

    After the home improvement materials enter the site, the construction can only be carried out after the acceptance by the customer.

    6. Mid-term acceptance.

    The customer, designer, project supervision, and construction person in charge participate, and sign the quality report for confirmation after passing the acceptance.

    7. Final acceptance.

    The customer, designer, project supervisor and construction person in charge participate in the overall acceptance of the engineering materials, design and process quality, and sign and confirm after passing the qualification.

    8. The project is completed.

    The home improvement project was completed, and the construction site was cleaned and organized.

    9. Home improvement warranty.

    According to the contract, the home improvement company is responsible for a certain period of maintenance of the home decoration project, Article 32 of the "Residential Interior Decoration Management Measures" stipulates: under normal use conditions, the minimum warranty period of the residential interior decoration project is 2 years, and the leakage prevention warranty period of the kitchen, bathroom and exterior wall with waterproof requirements is 5 years, and the warranty period is calculated from the date of completion and acceptance of the residential interior decoration project.

  3. Anonymous users2024-02-04

    The first is the consultation: what you need to design, what kind of style you want.

    Then choose the materials: see what style of furniture you need, and then buy it according to the theme.

    Final down payment: After everything is confirmed, let the designer customize a set of plans, and then charge for it.

  4. Anonymous users2024-02-03

    1. Preliminary design - 2 main body demolition and modification - 3 Hydropower renovation - 4 carpentry - 5 tiling - 6 wall paint - 7 kitchen and bathroom ceiling - 8 cabinet installation - 9 wooden door installation - 10 floor installation - 11 wallpaper - 12 radiator installation - 13 switch and socket installation - 14 lamps and lanterns installation - 15 hardware and sanitary ware installation - 16 curtain rod installation - 17 pioneer cleaning - 18 furniture entry - 19 household appliances installation - 20 home soft decoration accessories. Fun decoration.

  5. Anonymous users2024-02-02

    Home renovation is a very complex project, so let's take a look at the process of home renovation.

    Step 1: Change water, electricity and heating, including the location and layout adjustment of kitchen and bathroom water pipes. According to the principle of ergonomics, the height and position of the water pipe often have to be changed greatly, for example, the water pipe access height of the toilet may not be the same as the reserved height.

    electricity, mainly considering the transformation of energized lines. Change the location and number of switches and sockets to make them more rational.

    warm, heated or underfloor heating. It needs to be designed in advance.

    The reason why water, electricity and heating are listed as the first step is that if the early stage is not well considered, it will lead to inconvenience in construction.

    Step 2: Floor tiles and wall tiles.

    In the first step, after the water, electricity and heating are adjusted, the floor tiles and wall tiles need to be paved.

    Step 3: House ceiling.

    Suspended ceilings for living rooms, bedrooms, study, dining rooms, kitchens, bathrooms, and balconies.

    Step 4: Wrap the door and mouth.

    The decoration of doors and windows, as well as the production of some furniture accessories, such as entrance treatment, TV background wall production, etc.

    Step 5: Painting the walls.

    Wall painting, you can use painting, wallpaper, wall covering, etc.

    Step 6: Primer topcoat.

    Priming and topcoat of doorways, windows, and parts of furniture.

    Step 7: Lighting installation.

    Install all the lamps in the room, including all kinds of ceiling lights, downlights, chandeliers, spotlights, etc.

    Step 8: Ventilation and cleaning.

    Maintain good ventilation conditions and sufficient ventilation time.

  6. Anonymous users2024-02-01

    The process of home decoration is mainly design, demolition and modification, water and electricity, carpentry, masonry, oilman, main material installation, and soft decoration and furnishings.

  7. Anonymous users2024-01-31

    The steps of home renovation design are as follows:

    1.Partition of space and division of areas:

    A very important aspect of decoration design, it is particularly important to carry out reasonable zoning and space division for those new houses with unreasonable layout and frame structures that can be divided by themselves. Living rooms, bedrooms, kitchens and bathrooms and other rooms can only be convenient if the space is reasonably distributed. In addition, after the function of each room is determined, the specific design can be carried out according to the characteristics of each room.

    2.Practical and functional design:

    For example, the kitchen needs to design a variety of cooking utensils, cabinets, stoves, refrigerators, layout, so that the kitchen is handy, and other rooms should also be designed according to the actual needs of use to meet their respective functional needs.

    3.Furniture design:

    The shape and placement of furniture also have a great impact on the decoration effect, because their volume is usually larger; At the same time, the furniture also has practical functions, must conform to the principle of ergonomics, if the design is not reasonable, it will be inconvenient to use. Making your own furniture in the decoration can make full use of the space and can also be integrated with the overall style. If you plan to buy finished furniture after decoration, you should also consider the shape and color of the furniture in advance when designing, so as not to destroy the overall style.

  8. Anonymous users2024-01-30

    1. The general process of new house decoration.

    1. Preliminary design--2 main body demolition and alteration--3 water and electricity transformation--4 bricklayer--5 carpentry--6 wall paint - 7 kitchen and bathroom ceiling - 8 cabinet installation - 9 wooden door installation - 10 floor installation - 11 wallpaper laying - 12 radiator installation - 13 switch and socket installation - 14 lamps and lanterns installation - 15 hardware and sanitary ware installation - 16 curtain rod installation - 17 pioneering cleaning - 18 furniture and household appliances - 19 decoration completed.

    2. The renovation of water circuit is a concealed project, and the safety of the line needs to be fully considered when installing and constructing. The circuit design should fully consider the number, location, size and height of future electrical appliances and the convenience, reasonableness and feasibility of the circuit. It can't end up being unreasonable or full of lines.

    Water pipes and fittings are recommended to use better quality brand fittings, once the hidden water pipe leaks will be very troublesome, wash basins, washing machines, etc.

    3. It is not feasible to lay tiles without leaving gaps. In order to pursue beauty, many owners like to leave fine seams or no seams when paving tiles, but this practice is not right, there must be gaps between the wall tiles when paving, because with the change of temperature, the tiles will expand when heated, and leaving no gaps or small gaps will cause the tiles to be squeezed into each other and produce cracks.

    4. The exhaust volume of the range hood is not as large as possible. To a certain extent, the increase in smoke exhaust volume can improve the smoking effect of the range hood, but the bigger the better. Blindly pursuing a large amount of smoke without considering the actual use, there may be troubles such as oil smoke backfilling, energy waste, and noise increase in daily life.

  9. Anonymous users2024-01-29

    1. Measuring the room. Measure and understand the basic information of the house, and clarify the area involved in the decoration process: especially the area of tiles, wall paint, wallpaper and floor, etc. Clarify the size of the furniture, and measure the room before making a more accurate design plan.

    2. Check the original waterproofing of the interior of the house. Carefully observe the corners of the house for water seepage, and if there is a problem, you can deal with it in time.

    3. Demolition and alteration of the main body. According to the design drawings, the original structure of the house is demolished, mainly including wall demolition, wall building, shoveling wall skin, dismantling heating, replacing plastic steel windows, etc.

    4. Hydropower transformation, hydropower transformation is a hidden project, which is not done well, which will directly affect future life. Before the hydropower transformation, you should tell the designer of the decoration company your needs completely, so that when the designer makes measurements, the transformation plan of the circuit and waterway will be determined according to your needs.

    5. The masonry enters the site, mainly to decorate the ground, wall, bathroom, kitchen waterproofing, etc., and the waterproof project should be focused on doing a good job. After the floor tiles and wall tiles are laid, it is necessary to pay attention to whether there is a hollow drum.

    6. Carpenters and painters enter the site. Carpentry is mainly for on-site customized furniture, such as doors, door casings, background walls, ceilings, etc. The painter is to polish and oil the walls, and paint the furniture.

    7. Installation stage. Install socket panels, install chandeliers, install cabinets, install doors and windows, install various hardware and a series of installations.

    8. Clean decoration garbage. After the renovation is basically completed, you can clean every corner of the house.

    9. Household appliances and furniture are admitted. After the house is cleaned, the appliances and furniture can be entered. Beds, mattresses, wardrobes, shoe cabinets, sofas, dining tables, refrigerators, air conditioners and other furniture and appliances can be installed on the premises.

  10. Anonymous users2024-01-28

    Home improvement steps.

    1. Choose a decoration company 1Learn about the renovation company design process.

    2.Look at the model house.

    3.Make a request to the renovation company.

    4.Learn how renovation companies charge and price each other.

    5.Compare and choose the right renovation company.

    Second, the decoration plan negotiation.

    1.Signed a contract for consignment design (preliminary negotiation).

    1) The decoration company conducts on-site measurement records;

    2) The decoration company provides a preliminary plan for the plane and the top surface;

    3) Communicate and finalize the preliminary design plan.

    2.Full set of scheme design (deep talk).

    1) The decoration company provides detailed engineering design drawings;

    2) Communication and finalization of design details;

    3) Draw up a list of building materials.

    3. Discussion and finalization of building materials and budget (detailed discussion) (1) Discuss the applicability of building materials;

    2) Confirm the project budget;

    3) Determine the building materials table.

    3. Decoration contract signing.

    1.Confirmation of the project budget.

    2.Formal signing of the decoration contract.

    3.Pay part of the renovation cost.

    Fourth, decoration construction.

    1.Construction begins.

    1) Start construction according to the date of signing the contract;

    2) Designers, constructors, and water and electricity commissioners make on-site disclosures.

    2.Formal construction.

    1) Material distribution site;

    2) construction according to the drawings;

    3) Ask someone to supervise the work or supervise the work in person;

    4) Designer on-site coordination;

    5) The decoration company completes the inspection and issues the warranty card.

    5. Household acceptance (please have a person or in person) and renovation stage.

  11. Anonymous users2024-01-27

    1. What are the steps of decoration?

    The choice of home improvement company.

    Design floor plans and renderings.

    Partial wall demolition of the house.

    Disclosure and transformation of hydropower projects.

    Do kitchen waterproofing and closed water test.

    Tile or level the floor.

    Carpenters, bricklayers, and lacquerers enter the site in turn.

    Kitchen and bathroom, ceiling, cabinet installation, etc.

    Flooring, light fixtures, switch installation, etc.

    Curtain hardware fittings installation.

    Cleaning of the house.

    Soft furnishings and appliances are introduced.

    Second, what are the decoration skills of the new house

    1. Never dig holes in the load-bearing wall. May not be visible on the surface. In fact, it can crack the wall, seriously affect the quality of the house and destroy the earthquake resistance.

    2. In the decoration process, some money can be saved, but some money must not be saved, especially about the cost of infrastructure, such as: wire laying, etc., it is absolutely not possible to choose to buy inferior products in order to save money, it is recommended that you must choose high-quality copper core wire, and should be packaged with a regular casing, so as to avoid accidents such as leakage.

    3. If you choose to pave tiles, then it is recommended that you try not to buy marble, because the weight of marble is dozens of times that of ordinary tiles, which will bring double pressure to the floor and affect the quality and safety of the building.

    4. When decorating the kitchen, the gas pipeline must not be completely wrapped, which is easy to leave potential safety hazards, and if it encounters danger in the later use process, it will lead to serious consequences.

    5. If you want to install a shower room in the bathroom, you should choose tempered glass, so that it is less likely to burst during later use. If the user chooses to install a semi-tempered glass shower room, the semi-tempered glass may burst due to high temperature in the later use process.

Related questions
9 answers2024-02-24

Hello, we all know that decoration is a very troublesome thing, but also a headache, now everyone has higher and higher requirements for decoration, the decoration of the new house is not just brush the paint so simple, it is very laborious and time-consuming to operate, its process is complex, to go through a lot of processes. So let's discuss what are the key points of home decoration Chinese restaurant decoration design! The top --- should be decorated with plain and clean materials, such as lacquer, local wood, metal, and set off with lamps and lanterns. >>>More

9 answers2024-02-24

It depends on what paint you want to use, traditional coatings can be used Nippon, China Resources and other brands are relatively good, but with the improvement of people's living standards, the taste of home decoration is getting higher and higher, and then it has also driven the rapid development of the art paint industry. >>>More

17 answers2024-02-24

A comfortable and comfortable villa house life is inseparable from the comfortable and warm decoration design, villa design and decoration is more complex than you imagined, not only involving the transformation of the building structure, but also covering the indoor and outdoor environment supporting systems, large area, more space, complex structure leads to the whole decoration process is not simple. >>>More

13 answers2024-02-24

According to the different interior partitions, the bathroom, kitchen, dining room, bedroom, and living room are different. Suspended ceilings, decorative lines. or direct latex paint. >>>More

4 answers2024-02-24

1. The material process must meet the requirements of the company's specifications: all wires are made of famous brands such as pigeon brand BV wires, lighting circuit sockets air conditioners 4mm2, kitchens, bathrooms 4mm2, and grounding wires, especially emphasizing that DAEX general light (16) pipes or DAEX (16) B pipes, round tees, direct, locks, and yellow wax pipes should be used in the threading, and bellows, elbows, and equal diameter tees are never allowed. 1 16 pipes can only be used for one circuit, 20 can only be used for 6mm21 circuits and the circuit between the toilet bomb and the switch. >>>More