-
1) Put the single machine out of the machine according to the form shown in Figure 3;
2) As shown in Figure 4, the pressure device (hydraulic plate) is placed on the lower frame machine that has been placed; Then place the lower hot plate on top of it. After the three are aligned, the lower hot plate is covered with plastic film (or sprinkled with talcum powder);
3) Place the tape joint that has been processed and processed and filled with rubber material on the lower hot plate; After finding the center line, fix both sides of the tape with clamping plates and clamping mechanisms. Its form is shown in Figure 5;
4) On top of the tape joint. The position corresponding to the lower hot plate is covered with plastic film (or sprinkled with talcum powder), and then the upper hot plate and heat insulation plate are placed on it in order. The form is shown in Figure 6.
Note: When multiple vulcanizers are working in parallel, the family scale pads a thin metal plate with a long seam at the joint of the lower hot plate.
5) Place the upper rack on the heat shield as shown in Figure 7, and align and align with the lower rack.
6) According to Figure 8, install the preloaded bolts, washers and nuts in the long holes at both ends of the upper and lower frames, and tighten the nuts with a wrench. At this time, the main part of the vulcanizer is installed.
7), according to Figure 9, the quick connector of the pressurized pump system is connected with the water inlet hole of the pressure device, the primary power supply wire is correspondingly inserted on the socket of the electric heating control box, one end of the secondary wire is inserted on the socket of the electric heating control box, and the other end is inserted on the electric heating plate; Insert the thermal resistance (or thermocouple) wire into the socket of the electric heating control box accordingly, and insert the other end into the temperature measuring hole of the electric heating plate. At this time, the vulcanization installation is complete, and the timed operation of pressurization and heating is ready.
-
set is the function key, and the up and down arrows are the setting keys.
-
It's very simple to read the manual.
-
From the electrical contact pressure gauge, it can be adjusted a little larger from the touch screen of the machine.
-
I think it's normal to have a noise!
-
Leader, say, you are not retreading tires.
-
Working principle of plate vulcanizer::When the motor is running, the oil enters the oil pump from the oil filter of the oil storage tank, and enters the control valve through the oil pump discharge pipe, at this time, if the hand control valve is in the closed position, the oil enters the oil cylinder through the control valve and the oil pipe, and drives the plunger and the lower template platform to rise, as mentioned before volcanization, when the pressure reaches the upper limit of the specified value, the electric contact pressure gauge contact control stops the operation of the oil pump motor, and the check valve is automatically closed. So that the pressure in the cylinder is maintained (the upper limit of the pressure gauge is really adjusted to the required working pressure, but it cannot exceed the pressure maintenance when it is adjusted to the required minimum working pressure. The electrical contact pressure gauge contact controls the operation of the oil pump.
The oil pressure rises again. Until the vulcanization heating time is complete. The motor stops.
Open the mold to take the workpiece. The mold is fixed between the upper and lower platforms. Generally, it is heated by an automatic temperature control electric heating pipe.
After the rubber is heated for a few minutes. That is, it is vulcanized to fix the properties and shape. The vulcanizer has some functions like steaming steamed buns
If the hand control valve is opened, there is the weight of the lifting platform and the plunger, the oil in the oil cylinder is pressed back to the oil storage tank through the oil cylinder hand control valve and the oil pipe, the lower template hot plate is lowered, and the electric contact pressure gauge is controlled on the control valve, and is connected with the hydraulic cylinder.
-
Touch screen tune··· The relevant settings are... Turn up the flow and pressure...
The pirated version can't be good, I've deleted it.
Why didn't you mention "Haojie Chunxiang", it's super good-looking.
The game is best played in the NetEase version.
I often hear this song in dance halls on TV, but I haven't studied the name of it.
Minimum Configuration:
cpu:pentium 4 >>>More