What is the process of floor paint construction process?

Updated on culture 2024-03-23
8 answers
  1. Anonymous users2024-02-07

    In home decoration, paint engineering occupies a very important part, the appearance of paint construction engineering has basically indicated that the decoration and more than half, the general paint construction process is for the interior surface to be more interesting, so what is the specific paint construction process.

    Introduction: In home decoration, paint engineering occupies a very important part, the appearance of paint construction engineering has basically been said to be decoration and more than half, the general paint construction process is for the interior surface to be more interesting, so what are the specific steps of the paint construction process.

    In home decoration, paint engineering occupies a very important part, the emergence of paint construction engineering has basically indicated that the decoration and more than half, the general paint construction process is for the interior surface to be more interesting, so what are the specific steps of the paint construction process.

    When decorating a house, most of the owners are handed over to the decoration company to decorate, which not only saves their own time, but also reduces some of the decoration troubles. Generally speaking, in home decoration, the paint project is generally the face of home decoration, if it is not done well, it will not only affect the quality of home decoration, but also leave many troubles to the owner, such as the appearance of paint loss, so in home decoration, what are the steps of the paint project?

    1. Steps of painting project: preparation.

    Before decoration, the construction personnel should prepare for painting in advance, generally including the cleaning of the paint environment, the protection measures of furniture, etc., such as the door and window frame is best pasted with a layer of color separation paper, and the furniture of wooden cabinets and partitions is best wrapped with a layer of newspaper, so as to avoid the situation that the paint drips on the surface of the furniture and is stained.

    2. The steps of the paint project: color mixing.

    In the home space area of the finish, first of all, calculate how much paint is needed to avoid the occurrence of insufficient paint or waste in the later stage, and then evenly allocate the required paint to prevent the surface of the furniture from being affected when painting, resulting in uniform color, and finally the primer is applied to avoid the texture of the furniture surface.

    3. The steps of the painting project: construction.

    If the owner has done the first two steps of the work, now officially entered the construction stage of painting, which is in the order of first hanging ceiling, lines, and then the wall. Generally speaking, it is necessary to repeat at least two times when painting the wall, but it is best to have a certain time interval between the two coats.

    4. The steps of painting engineering: grinding.

    After the paint is finished, in order to keep the wall smooth, we need to polish the wall, when the wall is sanded, we can touch the wall with our hands to see if the wall is smooth, and then use the softer putty to process it again, and then sweep the wall again.

    5. Steps of painting project: cleaning.

    After the construction personnel have completed the above steps, the owner can accept it, and during the acceptance, it is necessary to carefully check whether the wall and the surrounding area are clean and clean, and whether there are traces of paint in other places.

  2. Anonymous users2024-02-06

    1. Ground grinding: Use a grinder to polish and level the parts of the ground such as cement slag above the ground to remove the ground ash. Other treatment measures are used for loose and oily ground.

    2. Primer: After the concrete substrate is processed and cleaned, the primer (roller coating or brushing) can be carried out, and the roller coating or brushing should be even.

    Uniform, consistent thickness. The primer has a certain water vapor permeability, which can enhance the strength of the substrate and increase the adhesion of the coating to the substrate.

    3. Intermediate coating: Quartz sand and quartz powder are added to the prepared water-based epoxy coating (intermediate coating) to form a water-based epoxy mortar, and it is evenly coated with a trowel to increase the thickness and compressive strength of the coating.

    4. Batch supplement: After the middle coating, the floor is polished with sandpaper, and the putty composed of water-based epoxy paint (medium coating) and quartz powder is constructed according to the actual needs, and it is required to be smooth and no holes, and there is no batch of knife marks and sanding marks.

    5. Putty batch supplement: the use of primal coating materials is deployed according to the proportioning method of primal coating materials, and the surface can be directly coated in polishing without adding water.

    layer is scraped onto the layer. If necessary, you can appropriately add finer quartz powder or heavy calcium powder to make up, and polish it as a whole with fine sand disc paper after the batch is finished, and the reference amount of the material is supplemented.

    6. Topcoating: Applying the water-based epoxy floor coating to the surface coating, the surface coating roller coating is applied twice, and the overall ground gloss is required to be soft, clean and uniform after completion.

    1. No empty drums.

    7. Maintenance: It takes 24 hours for the surface layer to be dry, and it should be closed during this period, so as not to affect the clean and smooth effect of the surface. 3D can be uploaded.

    people, 7 days after the completion of maintenance can be officially put into use (25 shall prevail, low temperature needs to be moderately extended).

  3. Anonymous users2024-02-05

    The specific construction steps of floor paint are as follows:

    1. Plain land treatment: Generally, it is necessary to maintain health for more than 28 days on plain land, and ensure that the plain land is subject to cement powder smooth surface or grinding stone ground, no oil stains, and the ground is smooth and clean. More than 28 days, and ensure that the plain ground is subject to cement powder smooth surface or grinding stone ground, no oil stain, flat and clean ground.

    2. Bottom coating: This stage is generally guaranteed to be completed within four hours, and the required main agent and hardener should be fully mixed, of course, the viscosity can be appropriately adjusted according to the actual situation. This stage requires more than eight hours of health.

    3. Medium coating: This stage is mainly to add quartz sand and evenly coat, this stage needs to be completed within half an hour, and the health care time is more than eight hours.

    4. Surface coating: ensure that the ground is clean, and mix the main agent and hardener in accordance with the correct proportion, complete the construction within half an hour, this stage mainly uses a roller or trowel to evenly coat the material, and generally can be on the person within 24 hours after completion. In the construction process of using epoxy floor paint, it is necessary to pay attention to the temperature and humidity of the construction site, pay attention to the treatment of the floor surface, and pay attention to the maintenance of construction equipment and tools after the completion of construction.

  4. Anonymous users2024-02-04

    The construction process of ordinary floor paint is: 1. Treat the foundation ground well to achieve no oil stain and no cracking; 2. Mix the strengthened asphalt filler and roll the foundation ground with a primer; 3. Coat the surface layer with stirred paint and apply scraping oil; 4. Epoxy mortar can be applied by scraping and trowel coating. Floor paint is manufactured by a variety of different substances through multi-process production processes such as mixing, dissolving, and dispersing, and is mainly divided into decorative floor paint, heavy anti-corrosion floor paint, and heavy-duty floor paint.

    Floor paint has the characteristics of bright, real, beautiful, wear-resistant, waterproof and anti-corrosion. The self-leveling properties mentioned in floor paints mainly refer to topcoats, primers and secondary coats, which are the same as other types of floors. The quality of the self-flowing flat paint is the key to the appearance and use of the epoxy self-leveling floor.

    The construction of epoxy artesian plane paint mainly takes the form of trowel batch scraping, and gently drives the artesian plane paint through the toothed side of the trowel to create power and then let the artesian plane paint level by itself.

  5. Anonymous users2024-02-03

    Floor paint construction process.

    The floor paint adopts a one-time coating process, no matter how large the area, there is no connecting joint, and it is also a dust-free material, with strong adhesion, abrasion resistance, strong hardness and other characteristics, which has been widely used in China. Epoxy floor paint can be divided into solvent-based and solvent-free types. Solvent-based epoxy floor coatings emit a certain amount of volatile organic compounds (VOCs) during production, construction and curing, but the cost is relatively low; The solvent-free epoxy floor coating is environmentally friendly and has no volatile organic compound emissions.

    It is widely used in the finishing of modern industrial floors.

    Based on years of experience in floor paint construction, CMMT Co., Ltd. has sorted out the floor paint construction process including base surface treatment, finishing sealing coating, batch scraping and scraping, finishing floor paint middle layer, finishing floor paint surface layer and precautions.

    1. Base surface treatment 1, the foundation surface is subject to cement powder surface or grinding stone. 2. The plain land needs to be maintained for more than 28 days, and the moisture needs to be less than 8% before the construction of the plain land, if there is unevenness or hollowness, it needs to be removed. 3. Remove the cement slurry, old paint and adhered garbage and debris on the surface.

    4. Completely remove the oil stain on the surface and treat it with Keyou King cleaning agent. 5. Remove stagnant water and dry the tide thoroughly. 6. The cleaning of the surface needs to be completed by a dust-free sweeper and a large vacuum cleaner.

    7. The allowable void of the flat surface is 2, the water content is below 6, and the pH value is 6. The hairing of the floor surface needs to be completed with a dust-free grinder and thoroughly cleaned with a vacuum cleaner. 9. Fill the ground with epoxy mortar. 10. Apply putty to the holes and obvious depressions on the surface of the floor to fill the batch scraping, and polish and vacuum after drying.

    Fourth, the middle layer of floor paint is painted.

  6. Anonymous users2024-02-02

    Answer 1, plain ground treatment: the ground to cement surface or grinding stone ground shall prevail, the ground should be placed for more than 28 days, the moisture needs to be less than 8% to be constructed, if the ground is uneven or hollow drum to be removed first, with epoxy mortar to level the ground, the ground oil should be cleaned, and the ground should be kept dry and clean before construction.

    Epoxy floor paint construction process:

    2. Ground treatment: grinding, repairing, decontamination and dust removal according to the ground conditions;

    3. Epoxy primer: Epoxy primer with strong permeability and adhesion is used to enhance surface adhesion;

    4. Epoxy mortar: add an appropriate amount of quartz sand with epoxy two-component, and coat it with a trowel to achieve the required number of layers;

    5. Epoxy putty: Add an appropriate amount of putty powder to the epoxy two-component, and evenly coat it with a trowel to increase the flatness of the ground;

    6. Epoxy paint: one to two coats with epoxy paint;

    7. Epoxy topcoat: Roll coat with epoxy topcoat to make the ground bright and wear-resistant;

  7. Anonymous users2024-02-01

    Epoxy floor paint construction process:

    1.Plain land treatment:

    The ground is based on cement or grinding stone.

    The ground should be placed for more than 28 days, and the moisture content needs to be less than 8% before construction, and the ground should be removed first if it is uneven or hollow.

    Fill the ground with epoxy mortar.

    The ground should be cleaned of oil.

    Keep the ground dry and clean before construction.

    2.Undercoat:

    To keep the floor clean, then mix the main agent and hardener.

    The viscosity of the mixture should be adjusted according to the ground conditions, and then the application should be carried out within 4 hours.

    It takes about 8 hours for the bottom layer to harden.

    3.medium coating.

    To keep the ground clean, then mix the main agent and hardener with Hu Li and stir.

    Add some quartz sand to the mixture.

    Use a trowel to evenly coat the material.

    The mixture is completed within 30 minutes.

    It is necessary to do a good job of handover.

    The hardening time of the middle coat is more than 8 hours.

    4.Soil layer.

    Mix the main pants with the hardener.

    Use a batch knife to evenly coat the material.

    The mixture should be completed within 30 minutes.

    The curing and hardening time of soil is more than 8 hours.

    5.Top coating.

    The ground needs to be kept dry before construction.

    Before use, the main agent is stirred to bend evenly.

    Mix the main agent and hardener.

    The mixture is completed within 30 minutes.

    It is necessary to do a good job of handover.

    After completion, it will be possible to ascend 24 hours later.

  8. Anonymous users2024-01-31

    The process of floor paint construction process mainly includes the following steps:

    1.Ground treatment: First of all, the ground needs to be treated, including cleaning, sanding, repairing, etc. Cleaning can be done by vacuuming, wiping, etc., grinding can be mechanical grinding or manual grinding, and repair can be filled and scraped.

    2.Primer applied: After the ground treatment is completed, the primer is applied.

    The role of the primer is to enhance the adhesion and durability of the ground, and at the same time, it can also prevent the ground from blistering, cracking and other problems. Primer painting needs to pay attention to issues such as uniform brushing and appropriate thickness.

    3.Intermediate coating: After the primer is applied, the secondary coating is required. The role of the middle coat is to increase the thickness and hardness of the ground, and at the same time, it can also enhance the wear and chemical resistance of the ground. It is necessary to pay attention to the problems of uniform brushing and appropriate thickness.

    4.Top-coat Qingxiao Rotten Painting: After the middle coating is completed, it is necessary to answer the leakage to carry out the top-coating.

    The role of the topcoat is to increase the aesthetics and gloss of the floor, and at the same time, it can also enhance the abrasion and chemical resistance of the floor. Attention needs to be paid to the problems of uniform brushing and appropriate thickness of the topcoat.

    5.Hardening: After the topcoat is applied, it needs to be hardened.

    The hardening process is used to enhance the hardness and durability of the ground, and at the same time, it can also prevent problems such as blistering and cracking of the ground. The hardening process can be either natural or artificially hardened.

    6.Curing: After the hardening process is completed, it needs to be cured.

    The function of curing is to allow the floor paint layer to fully solidify, enhancing the durability and aesthetics of the floor. The curing time is generally 7-14 days, during which it is necessary to pay attention to avoid the ground being crushed by heavy objects and soaked in water.

    The above is the process of floor paint construction technology, it should be noted that in the construction process, it is necessary to strictly follow the operating procedures to ensure the quality and safety of construction.

Related questions
5 answers2024-03-23

1) Varnish construction process.

Clean the surface of the wood Finish with sandpaper Finish on the powder Sandpaper Scrape the first putty, sandpaper polish Scrape the putty for the second time, polish the fine sandpaper Brush the oil Brush the first varnish Spell the color, refill the putty, polish the fine sandpaper Brush the second varnish, fine sandpaper polish Brush the third varnish, polish the water sandpaper sandpaper, wax, polish. >>>More

5 answers2024-03-23

How to apply epoxy resin paint?

Reference for two-component epoxy paint construction. >>>More

5 answers2024-03-23

Do the math how much it will cost you to renovate your home >>>More

5 answers2024-03-23

Ceramic floor tile floor construction process:

1.Grassroots treatment. (Clean up the surface debris). >>>More

11 answers2024-03-23

1. Sample production: make 1:10 samples with foam, (not colored) ** communicate with Party A, if Party A is satisfied, enter the amplification stage, enlarge to 1:1, foam draft. Communicate with Party A again, and after Party A is satisfied, the gypsum mold will be remade. >>>More