    Ceramic floor tile floor construction process:

    1.Grassroots treatment. (Clean up the surface debris).

    2.Find the surface level. (Measure well and mark the distance).

    3.Springline. (Use an ink fountain to bounce the distance).

    4.Plaster screed cement mortar.

    5.Elastic Pave Paste Control Line.

    6.Paving. (paved with ceramic mosaic tiles).

    7.Hook seams, wipe seams. (Grout with white cement is so beautiful) 8Final curing. Baseboard mounting.

  2. Anonymous users2024-02-05

    There are several processes in the decoration construction process:

    First, the ground engineering construction process.

    Second, the construction process of woodworking engineering.

    Third, the wall decoration construction process.

    Fourth, the paint and coating construction process.

    Fifth, the ceiling engineering decoration process.

    Sixth, the circuit lamp construction process.

    Seventh, the installation process of sanitary ware.

    8. Pipeline renovation engineering process.

    9. Kitchen equipment construction process.

    10. The process flow of aluminum alloy doors and windows.

  3. Anonymous users2024-02-04

    We all know that decoration is a very headache, decoration is also a big thing, for the modern social crowd, a lifetime can be decorated is enough, after all, the quality of this project is directly related to the quality of life of each owner in the next few decades. The tile paving you are talking about is the most important thing in the renovation. The basic process flow of paving ceramic tiles is as follows:

    1. Paving colored glazed bricks: treatment of the base layer, elastic line, tile soaking and wetting, paving cement mortar, installing standard blocks, paving floor tiles, hooking joints, cleaning and curing. 2. Paving ceramic mosaic tiles (mosaic) class:

    Dealing with the base layer, elastic line, standard bar, paving cement mortar, paving, patting, sprinkling, unwrapping, jointing, grouting, cleaning, maintenance. Key points of the construction of paving tiles: 1. The concrete floor should be chiseled with a depth of 5 10 mm, and the spacing of the chisel marks is about 30 mm.

    After that, clean the floating ash, mortar, oil stains, and produce scattered water brush to the ground. 2. Before paving, the line should be played, and the reference line at right angles to the door entrance should be popped up on the ground, and the line should start from the door to ensure that the entrance is the whole brick, and the non-whole brick is placed in the dark corner or under the furniture, and the elastic line should be popped up to control the vertical and horizontal positioning. 3. Before paving the ceramic floor tiles, the ceramic floor tiles should be soaked and dried.

    4. When paving, the cement mortar should be fully smeared on the back of the ceramic floor tiles, and the rubber should be compacted after paving. At the same time, check and correct with a level to wipe the cement mortar on the surface. 5. After 2 3 hours of paving, wipe the joints with white cement, with cement and sand = 1:

    1 (volume ratio) of cement mortar, the seam should be filled densely, flat and smooth. Then wipe the surface with cotton silk. In the process of decoration, you must not be sloppy, if you can't supervise the whole process, you should try to see the decoration results and decoration progress every day, let the construction team know that you are paying attention at all times, and do not let them have the opportunity to cut corners.

    Especially for paving tiles, you must find a very professional master to pave them.

  4. Anonymous users2024-02-03

    1. Ground.

    Cleaning: Before the floor tile is paved, the ground should be cleaned, especially the condensed concrete and building slag, if not cleaned, the floor tile will be paved after the warping, hollowing and other phenomena.

    2. Put the horizontal line and divide the block: before paving, the floor tiles should be prearranged according to the ground size and the size of the floor tiles, and the principle of pre-arrangement is: in the same room, the horizontal and longitudinal half bricks can not exceed one line, and the half brick should be left on the side of the furniture to be placed in the future or in an inconspicuous place, and the horizontal line should be set according to the layout plan, and the blocks should be divided.

    3. Sprinkle water on the ground: it should be fully moistened to prevent hollowing;

    4. Mortar stirring: two kinds of mortar should be used, one is 1:4 semi-dry mortar, which is used as a cushion, and the other is 1:3 mortar, which is used for bonding.

    5, mortar base: generally using dry paving method, ** in the early marble paving, although the cost is higher, but the paved floor tiles are smooth and beautiful, durable, the mortar should be dry and wet moderately, the standard is "hand into a group, the ground flowers", before paving the mortar is best painted with a cement slurry with a water-cement ratio of 1:.

    6. Test paving, leveling and tamping at the grassroots level: whether the floor tiles are hollow, this step is very important, and must be tamped, and at the same time, workers should check whether there is an error between the corner of the floor tile and the adjacent floor tile.

    7. Brick bottom grouting: A layer of 1:3 mortar should be smeared on the back of the floor tiles, as an adhesive layer, the thickness should not be less than 1cm, and the coating must be uniform.

    8. Paving: Evenly hit with a rubber hammer, adjust the levelness and the size of the gap with the horizontal line and other floor tiles, if there is a condition, check whether the tiles are level with a level, and beat with a rubber hammer until it is completely level.

    9. Pull joint: use a scraper to draw a gap from the middle of the brick joint to ensure that there is a certain and uniform gap between the bricks to prevent damage to the bricks caused by thermal expansion and cold contraction, and use the scraper to draw back and forth longitudinally on the two bricks to check whether the two bricks are flush.

    10. Surface cleaning: After the paving is completed, the dust and mortar on the surface of the floor tiles should be cleaned immediately to prevent the mortar from bonding on the surface of the floor tiles.

    11. Joints: Tile joints are generally treated after the tiles are dry, if the tiles are not completely solidified, the main problems are: one is to cause the unevenness of the tiles, the other is to cause the loosening of the tiles, so that the tiles are easy to fall off when used in the later stage; Generally speaking, the time of hooking and jointing is better in 24 hours of tile paving; What problems need to be paid attention to when hooking?

    When the tile is hooked, it is first necessary to clean the dust and impurities in the tile joint, and then squeeze and fill the jointed agent into the brick joint.

    12. Finished product protection, after the floor tile paving is completed, we must do a good job in the protection of the finished product, mainly to prevent the pollution and damage caused by the follow-up work to the floor tiles, and the protective layer can use the cardboard or color striped cloth of the floor tile packaging box.

  5. Anonymous users2024-02-02

    Summary. Hello, the ceramic tile process includes: raw ore - raw material crushing optimization - ball milling - mud storage - spraying drying - automatic batching - forming - drying - glazing - firing - polishing - sampling - inspection and packaging - warehousing - logistics.

    Hello, the ceramic tile process includes: raw ore - raw material crushing optimization - ball milling - mud storage - spraying drying - automatic batching - forming - drying - glazing - firing - polishing - sampling - inspection and packaging - warehousing - logistics.

    What do you want to ask about the ceramic tile production process or the ceramic tile process?

    The construction process of tiling includes: base treatment, elastic line, pre-paving, paving, hook and cleaning.

    Hello, ceramic tile production process: 1. Raw materials: the main component is clay (which can be divided into black mud to improve the plasticity of products; white mud to improve the whiteness of products) and sand (the main ingredient is SiO2, which is used to improve the strength of products, etc.); 2. Ball mill:

    That is, the grinding process makes the raw material reach a certain fineness and uniform composition, and at the same time, in order to promote ball milling, about 34% to 37% water should be added in the grinding process. grinding balls mixed with sand; 3. Spray granulation: In the spray drying tower, the full convection of 600 hot air sent down from the hot blast furnace and the upward spray suspension is used for drying and granulation to form hollow particles of raw materials.

    Production of raw materials to ensure a good combination of raw materials in the compression molding stage; 4. In the powder silo (rancid raw materials): the raw materials are naturally placed in the warehouse for more than 48 hours to ensure the uniformity of the moisture of the raw materials and the consistency of physical and chemical properties; 5. Press molding: the tonnage of the press and the mold determines the main defects such as resistance, size, cracking and so on, if there is a problem, it will lead to the overall quality of the ceramic tile to be reduced, and the later use is limited; 6. Firing:

    The firing temperature and firing time in the oven have a great impact on the performance of the subsequent products, and the firing temperature of glazed bricks is generally between 1050 and 1190; 7. Inspection: At present, manual quality inspection is still used in production. The main projects are:

    Dimensions, warpage, color aberration, cracks, delamination, leakage, surface defects.

Related questions
6 answers2024-03-09

Process. 1. The LNG is transported to the gasification station by the tanker, and the LNG unloading supercharger is used to increase the pressure in the tanker, and the LNG in the tanker is sent to the LNG cryogenic storage tank for storage. >>>More

13 answers2024-03-09

Ingredients: 1000 grams of Ya pear or autumn pear, 30 grams of 100 parts, 20 grams of Qianhu, Banxia and Poria cocos, 50 grams of almonds and Sichuan fritillary, 10 grams of coltsfoot and citron powder, 30 grams of orange powder, 500 grams of white sugar, a small amount of honey, and an appropriate amount of water. >>>More

7 answers2024-03-09

In home decoration, paint engineering occupies a very important part, the appearance of paint construction engineering has basically indicated that the decoration and more than half, the general paint construction process is for the interior surface to be more interesting, so what is the specific paint construction process. >>>More

11 answers2024-03-09

1. Sample production: make 1:10 samples with foam, (not colored) ** communicate with Party A, if Party A is satisfied, enter the amplification stage, enlarge to 1:1, foam draft. Communicate with Party A again, and after Party A is satisfied, the gypsum mold will be remade. >>>More

9 answers2024-03-09

In life, no matter what style of tiles, they are generally used to pave the floor or wall, so one of the functions must be anti-slip function, although the quality of floor tiles is relatively better than other wall tiles, but in terms of performance, the water absorption rate is relatively low, and the anti-slip performance is not so good; The ceramic tile is made of porcelain clay, which needs to be glazed because of the high water absorption, and the structure is also tight, and the anti-fouling and anti-slip properties are also strong. >>>More