The standard for the acceptance of the second decoration of the property

Updated on home 2024-03-10
7 answers
  1. Anonymous users2024-02-06

    1. Residential decoration (hereinafter referred to as decoration) shall comply with laws, regulations and relevant provisions, and follow the basic principles of safety and beauty. In the design and construction, it is necessary to implement the current national, industry and local standards and technical regulations on safety, fire prevention, environmental protection, construction, electricity, water supply and drainage.

    2. Decoration design and construction must ensure the safety and integrity of the original building, and shall not change the load-bearing structure of the building in any way, shall not damage the façade of the building, if it is opened through the installation hole, after the installation of the equipment should be in accordance with the original appearance of the decorative effect. The decoration should be carried out in the home area within the owner's door, and should not occupy public space, and the safety and use of the building should not be affected due to decoration.

    3. The decoration shall not arbitrarily change the position of the drainage standpipe, water supply pipe, floor drain and toilet, and shall not arbitrarily add sanitary facilities. When renovating the kitchen, it is strictly forbidden to move the gas meter. Gas pipes must not be used in the dark and must not be used in bedrooms.

    There must be no joints in the gas pipes in the ceiling. If it is really necessary to move the measuring instruments, an application shall be submitted to the gas competent department, and the construction can only be carried out with the consent of the owner.

    4. The pipe layout of the water supply and drainage pipeline should meet the design requirements, and the pipeline installation should be firm and not loose. The faucet and valve are installed smoothly, opened flexibly, and the water meter operates normally. Visual inspection and hand acceptance are adopted.

    Pipes and appliances, pipes and pipes must not leak at their joints. Check for leakage by water method, visual inspection method, and manual method. Water pipes should not be installed close to the power supply.

    The distance between the water pipe and the gas pipe should not be less than 50mm. Check with a steel tape measure.

    5. The construction waste inside and outside the house must be cleaned up to the designated place, and shall not be discarded and stacked at will. Flammable and flammable materials shall be protected and properly disposed of, and properly placed in designated places.

  2. Anonymous users2024-02-05

    Residential decoration (hereinafter referred to as decoration) shall comply with laws, regulations and relevant provisions, and shall follow the basic principles of safety and beauty, and must implement the current standards and technical regulations of the state, industry and local safety in the design and construction, such as safety, fire prevention, environmental protection, construction, electrical, water supply and drainage.

    Decoration design and construction must ensure the original safety and integrity of the building, and the load-bearing structure of the building shall not be arbitrarily changed, and the façade of the building shall not be damaged.

    The decoration should be carried out within the household area of the owner's sub-household, and shall not occupy the common space, and shall not affect the safety and use environment of the adjoining house due to decoration.

    The decoration shall not arbitrarily change the location of the drainage riser, water supply pipe, floor drain and toilet, and shall not arbitrarily add sanitary facilities.

    It is strictly forbidden to move the gas meter when decorating the kitchen, the gas pipeline shall not be concealed, shall not pass through the bedroom, and shall not have a joint in the gas pipeline through the flat roof. If it is really necessary to move the meter, the owner should apply to the gas department, and the construction can only be carried out after approval.

    Water supply and drainage pipes.

    The pipeline arrangement should meet the design requirements, the pipeline installation should be fixed firmly, without loosening, the faucet and valve installation should be smooth, the opening should be flexible, the water outlet should be smooth, and the water meter should operate normally. Acceptance by visual inspection and hand feel; There should be no leakage between pipes and appliances, and at the connections between pipes and pipes. The method of water passing, visual inspection and hand feeling is used to check whether there is leakage.

    The installation of water pipes shall not be close to the power supply, and the distance between water pipes and gas pipes shall not be less than 50mm, and shall be checked with a steel tape measure.

    The construction waste inside and outside the house shall be cleaned up to the designated place, and shall not be discarded and stacked at will, and the combustible or flammable materials need to be placed in the designated place after the corresponding protective treatment.

  3. Anonymous users2024-02-04

    In terms of safety, the main tests include whether there is any change in the load-bearing structure, whether there is any change in the water and electricity to floor heating, and whether there is any change in the gas pipeline. In addition, there are also the style of sealing the balcony required by the property, whether the original use function of the house has been changed, etc.

  4. Anonymous users2024-02-03

    The second acceptance is mainly for concealed projects, such as whether the kitchen and bathroom are waterproof or not, whether the water supply and drainage pipes are unblocked, and so on.

    These items may not be inspected when the renovation is completed, but after 3 months of use and running-in, whether there are hidden dangers can be checked.

  5. Anonymous users2024-02-02

    After the house is renovated, it is necessary for the property to be accepted, but how does the property accept the owner's decoration? According to the process of property acceptance by relevant users, it is basically the same as no acceptance, just a process. The property acceptance and decoration are basically passed, because the decoration has been accepted before this, let's take a look at the property acceptance after the decoration.

    First, what are the items of property acceptance after decoration.

    The property will carry out the inspection and acceptance of the load-bearing walls, walls, windows and balconies according to the design plan submitted by the owner to see if the decoration has damaged the load-bearing walls, and whether the decoration appearance does not meet the decoration needs, and whether there are inspection openings for the water and sewage changes, so as not to affect the harmony between neighbors.

    Second, how to accept the owner's decoration of the property.

    The property will be inspected according to the approved renovation construction drawings, such as water, electricity, load-bearing walls and waterproofing. Generally, the property will not connect the reclaimed water and tap water of the toilet to the three links. Grey water and tap water must be connected directly to the back of the toilet.

    The inspection port of the toilet package should be 2030. Try it at the socket with a gadget to see if there is a problem with the live wire.

    Third, the property decoration acceptance is not enough.

    In the case that the property fails to pass the acceptance and decoration, it may be because the decoration company destroys the house structure when decorating the house, and the operation is in violation of regulations, otherwise it will not pass the acceptance, then the owner will have to find the decoration company, communicate with the decoration personnel on the spot for the unqualified places, and then repair the memory.

    Fourth, the decoration of the property inspection process.

    1. Look at the outside first.

    After the house is renovated, the property will have a simple acceptance work circle, which will generally first accept the exterior of the house decoration, such as the façade of the house, exterior wall tiles and coatings, unit doors, corridors, whether there is damage and illegal operations.

    2. Check the interior again.

    The property inspects the interior of the house, whether the doors, windows, walls, floors, water supply and drainage, strong and weak electricity, heating, gas, ventilation, exhaust and smoke are installed reasonably, and whether there are no relevant specifications for installation.

    3. The post-test orange macro is adjacent.

    To avoid affecting the harmony of the neighborhood, the property will do problems such as closed water storage test and water meter idling to avoid water leakage and affect the harmony of the neighborhood.

  6. Anonymous users2024-02-01

    After the renovation is completed, it is necessary to pass the property for acceptance, and determine whether to return the decoration deposit according to the standardization of the house decoration. Property acceptance also needs to determine whether the renovation will damage the building structure and ensure the safety of the entire building. Many owners have encountered troubles, what should I do if the property is not accepted after the renovation is completed?

    First, the decoration is completed, and the property is not accepted.

    1. In the case of non-acceptance of the property after the decoration is completed, you can find the decoration company to communicate with the property to see what the reason for the non-acceptance is.

    2. If the decoration is completed, the property acceptance is unqualified, you should check the problems of the house in time, if the decoration company is not properly handled, the owner can seek the help of the consumer association, and if there is a major problem in the structure of the house, you can claim compensation for the decoration company through legal channels to safeguard the legitimate rights and interests of consumers.

    Second, the property decoration acceptance standards.

    1. Check whether the main structure of the house has changed, whether the new wall affects the structure, and whether the demolished wall is a load-bearing wall. Withered and old.

    2. Whether the kitchen is waterproofed twice, whether the drainage pipe is changed, must meet the standard and whether the smoke exhaust pipe is changed.

    3. Whether the installation location of the external air-conditioning host of the house is suitable, whether the air-conditioning condensate is discharged centrally, and whether the sewage is discharged into the rainwater pipe.

    4. Check whether the bathroom of the house has been waterproofed twice, whether the toilet sewer pipe is blocked, whether the drainage pipe inspection port is sealed, and whether the floor drain is blocked and replaced.

    5. Check whether the water and electricity renovation is reasonable, including whether the strong electricity is enough to change, and whether the intercom, TV, and broadband in the building are changed.

    6. Whether the windows of the house are damaged, including whether the guardrails and glass are damaged and removed, and the awning and other items that affect the appearance of the stairs shall not be installed on the external wall.

  7. Anonymous users2024-01-31

    Hello Fire construction process: 1. Early demolition online filing: fill in the form declaration on the fire network, and send the information to the fire department for inspection within 5 working days if the lottery is selected; 1. Online application for review and lottery; Preparation of all relevant design materials, decoration design drawings, fire water supply, automatic fire extinguishing system, automatic fire alarm system, fire power supply system, smoke prevention and exhaust system, emergency lighting and evacuation indication system and other related fire protection system design drawings, by the formal qualification unit to set up a confession plan and provide stamped documents; At the same time, the industrial and commercial business license and qualification certificate are provided; Obtain a letter of permission from the fire department for renovation; 2. The online application for review was not selected

    Direct construction, must be accepted (must improve the online declaration of the lottery information, for acceptance - a check); 2. Decoration permit; Obtain a letter of permission from the fire department for renovation; 3. Submit for inspection; 1. Material samples, construction materials used in the process of fire decoration, take samples and send them for inspection; In general, the most sampling inspection during fire inspection is all kinds of fireproof coatings, fire doors, emergency lights, evacuation signs and fire extinguishers, and decoration and decoration carpets; 2. Preparation of materials, copies of relevant certificates of conformity of sample materials, submission of inspection reports of statutory inspection agencies for fire protection products, and production licenses for fire protection products or record certificates for sales and use in our province;

Related questions
9 answers2024-03-10

x2 is the square term and x1x3 is the mixed term. In order to eliminate the mixed term x1x3, you can make x1 = y1 + y3 and x3 = y1-y3 to formulate the square term with the square difference. Then let x2=y2 to get the standard shape. >>>More

14 answers2024-03-10

Answer: 9 5 means 9 times 5, which can be written as 9 5, which is no problem, but the landlord's understanding behind has been deviated. >>>More

8 answers2024-03-10

The basic oak representation of the quadratic function is y=ax +bx+c(a≠0). The quadratic function must be quadratic at its highest order, and the image of the quadratic function is a parabola whose axis of symmetry is parallel to or coincides with the y-axis. >>>More

2 answers2024-03-10

Take Shenzhen as an example:

Shenzhen Property Management Service Charge Management Regulations. >>>More

20 answers2024-03-10

1) There is only one intersection point between y=x 2-2x+2m and y=mx, which means that the equation x 2-2x+2m=mx has a double root, then the discriminant formula =(-m-2) 2-4*2m=0 gives m=2. >>>More