Solve the problem of construction technology in three ways

Updated on home 2024-03-31
6 answers
  1. Anonymous users2024-02-07

    What are the most commonly used construction techniques in architectural decoration projects? In the construction process to master which implementation.

    In architectural decoration engineering, commonly used construction techniques include:1Masonry process:

    Masonry walls, masonry structures, brick floors, etc. 2.Plastering process:

    Plaster walls and ceilings to make them smooth. 3.Coating process:

    Painting walls, ceilings, woodwork, etc., to protect and beautify surfaces. 4.Tiling process:

    Pave the tiles on the floor and wall to create a beautiful decorative effect. 5.Carpentry Craft:

    Including wood floor installation, door and window installation, cabinet making, etc. 6.Glass curtain wall process:

    Installation of a glass curtain wall on the façade of the building to provide daylight and landscaping. 7.Ceiling process:

    Install various types of suspended ceilings to improve the effect of the interior space of the building. 8.Waterproof process:

    Carry out waterproof treatment of roofs, walls, basements and other parts, and match old protected building structures. 9.Fire Fighting Process:

    Set up fire-fighting equipment to ensure the safety of the building. In the construction process, the construction points that need to be mastered include:- Construction plan:

    Develop a detailed construction plan, including process flow, material use, etc. - Construction management: Effectively manage the construction progress, quality and safety, and communicate and coordinate with relevant departments in a timely manner.

    Construction site safety: Ensure the safety of workers and the working environment, and take necessary protective measures. - Material Selection & Inspection

    Select high-quality materials that meet the requirements, and inspect and accept the materials. - Construction quality control: Ensure that the construction quality meets the design and specification requirements, and conduct quality inspection and acceptance.

    The above are the most commonly used construction techniques and construction points in building decoration hall decoration projects.

  2. Anonymous users2024-02-06

    In order: 4 questions: a; 6 Questions:

    c;Question 8: d; Question 10: c; Question 2:

    d;Question 4: B; Question 6: c; 8 Questions:

    b;Question 10: c; Question 2: B; 14 questions:

    Hu Zia; 2. The best water content is the densest water content that is easy to press, and the simple test method is: it can be pinched into a ball by hand and not loose, and it is placed at a height of 1 meter.

  3. Anonymous users2024-02-05

    Under the optimal moisture content, the soil can be compacted the most.

  4. Anonymous users2024-02-04

    1.The thickness of the mortar joint of the brick masonry is (b).

    2.The height of the brick wall should not exceed (d) every day.

    3.Among the following formwork is not suitable for the construction of reinforced concrete walls, (b).

    4.Among the following reinforcement connection methods, only vertical or diagonal reinforcement connections can be made is (a).

    5.In order to prevent temperature cracks, the following measures are wrong (c).

    6.Which of the following anchors can be used for both tension and fixed ends (c)7When calculating the blanking length of a single coarse steel bar, which of the following factors does not have to be considered: (c) 8The following description of the rotary lifting column is incorrect (d).

    9.The following description of the characteristics of the internode hoisting method of single-storey industrial plant structure is incorrect (a).

    10.According to the sub-time, the column can be arranged as a "three-point common arc", and the following are not to belong to these three points (d).

    11.In the construction of mud wall protection hole-forming cast-in-place pile, the following are not part of the casing function (d).

  5. Anonymous users2024-02-03

    1. Summary of construction quality problems of construction projects at this stage.

    At this stage, the common quality problems in China's construction projects are mainly as follows:

    The construction technology is not thorough. The premise of construction needs to fully grasp the overall construction design specifications and technical requirements to ensure the smooth implementation of the project. However, some construction units ignore this point, and blindly start construction results in quality problems due to poor understanding of project requirements.

    The accuracy of engineering measurement is insufficient, which leads to the deviation of construction dimensions and seriously affects the quality of the project.

    The overall management level and process technology level of construction are low. The construction technology used in the construction project is backward, the process level does not meet the quality requirements, the on-site management level is low, and an effective quality assurance system and quality management system have not been formed.

    The management level and construction technology level of construction site personnel are low. The project manager selected by the construction enterprise for the project has weak quality awareness and poor management ability, which leads to the chaos of quality management on the construction site; The professional skills of construction technicians are poor and they are not fully qualified for construction technical guidance.

  6. Anonymous users2024-02-02

    Earthwork backfilling.

    1. Whether the water content of the backfill is appropriate, it is generally required to be about 8%, and the hand is held into a clump and falls to the ground to flower. If it is too small, it should not be compacted, and if it is too large, it will form rubber soil.

    2. The tamping measures of filling are manual or mechanical, whether they are effective, and the thickness of layered ramming is also different according to the different tamping methods.

    3. For the reason of soil quality, silt and clay can be used, but silt, frozen soil and expansive soil are not suitable for backfill.

Related questions
4 answers2024-03-31

5. Upper stone masonry Here you are 2 kinds of processes, dry and slurry, dry masonry to lay a good stone mat, or the stone wall is unstable, slurry to fill the mortar, hook joint 1You can go to the **bookstore to check out 2Arrive.

8 answers2024-03-31

Typical example questions.

Brainless answers. Here's how to answer it. >>>More

12 answers2024-03-31

After the floor slab is poured, about 10 hours when the concrete reaches a certain strength, it begins to pay off, reports to the supervision and inspection line, the erection of the full hall frame and the set of column stirrups are synchronized, the stirrup sleeve is enough to start the vertical reinforcement connection (generally electroslag welding), the full hall frame pole is completed %60 or so and begins to copy the flattening, the full hall frame all the poles are fixed and the beam bottom rod is erected, and the column reinforcement is tied synchronously, the column reinforcement is reported to the supervision and inspection of the column reinforcement after the binding is completed, and the column formwork is installed after the qualification, and the beam bottom rod is erected and begins to control the beam with a line pendant. Then install the beam bottom mold and a side mold and the plate formwork, seal the beam mold after the beam is tied, start to bind the plate reinforcement, report to the supervision after the binding of the beam plate reinforcement and the column and beam plate formwork, and then prepare to pour the beam plate column concrete. It is also possible to pour the column first.

7 answers2024-03-31

Do the math how much it will cost you to renovate your home >>>More

1 answers2024-03-31

Quality control of the construction process.

Process quality content: first, the quality of process activity conditions; The second is the quality of the effect of the process activity. From the point of view of quality control, the two are interrelated, on the one hand, it is necessary to control the quality of the process activity conditions, that is, whether the quality of the input products of each process meets the requirements, and on the other hand, it is necessary to control the quality of the process activity effect, that is, whether the engineering products completed by the construction of each process meet the relevant quality standards. >>>More