How much can you make for 4,000 square runways for 150 yuan for contractors and materials

Updated on society 2024-03-25
7 answers
  1. Anonymous users2024-02-07

    In the local market, the cost of contracting labor and materials to build a square runway is roughly between 150-200 yuan. According to this range, if you have 4,000 square runways to build, then the profit you can make is roughly between (4,000 * 150) -4,000 * 200) = 60,000 - 80,000 yuan.

    If you want to know the specific decoration**, you can use the "decoration artifact" ** device to calculate, just enter the area + city, immediately calculate the local decoration**, list the detailed list of 102 decorations, so that you don't have to worry about overspending on the decoration, click here to start calculating: [3 seconds to get the local decoration**].

    The cost of contracting labor and materials includes labor costs and material costs. Labor cost refers to the labor cost required to build a square runway, which is usually calculated based on the workload and difficulty of the work. The material cost refers to the cost of materials required to build a square runway, including cement, sand, rebar, etc.

    Labor costs are usually calculated based on the hours and workload of the worker. In this example, let's assume that the construction of each square runway takes 2 days, 2 workers are needed per day, and each worker is paid 100 yuan. Then the total labor cost required is 4,000 * 2 * 2 * 100 = 160,000 yuan.

    The calculation of the material cost is usually determined based on the area of the square runway and the unit price of the material. In this example, let's assume that the area of each square runway is 10 square meters, and the unit price of the material is 50 yuan square meters. Then the total material cost required is 4,000 * 10 * 50 = 200,000 yuan.

    To sum up, the total cost of contracting labor and materials to build 4,000 square runways is 160,000 + 200,000 = 360,000 yuan. If you take the **** of 150-200 yuan to square the runway, then the profit you can earn is roughly between 60,000 - 80,000 yuan. Of course, this is only a rough estimate, and actual profits may be affected by market demand, competitive conditions, and other factors.

    Tuba Rabbit is one of the largest decoration platforms in China, with a total of more than 41 million owners, 110,000 decoration companies, covering more than 300 cities across the country, user reputation is very good, not only to meet your decoration needs, but also to provide professional decoration companies according to your budget, want to find a good company, learn more about decoration knowledge on Tuba Rabbit, click here, free 1 to 1 for your home decoration services: [Tuba Rabbit ** official website].

    Kunming - [Kunming Decoration Strategy Guide].

    Suzhou - [Suzhou Decoration Strategy Guide].

    Hefei - [Hefei Decoration Strategy Guide].

    Fuzhou - [Fuzhou Decoration Strategy Guide].

    Beijing - [Beijing Decoration Strategy Guide].

    Dalian - [Dalian Decoration Strategy Book].

    Hangzhou - [Hangzhou Decoration Strategy Guide].

    Shanghai - [Shanghai Decoration Strategy Guide].

    Tianjin——[Tianjin Decoration Strategy Guide].

  2. Anonymous users2024-02-06

    First of all, it depends on what kind of plastic runway material you use, plastic runway is divided into several different materials, the commonly used is breathable, and the hybrid type is more cost-effective, and the cost of full plastic and prefabricated type is higher, but the effect is the best. At present, most schools use breathable and hybrid plastic runways.

    1) Breathable runway: Our company's latest material ** is 65 yuan square, the contractor is about 110 yuan square (excluding basic costs), 4000 square meters of the total cost is about 440,000 yuan, according to the price of 150 yuan square, the profit is a total of 160,000 yuan.

    2) Mixed runway: Our company's latest materials are 100 yuan square, 140 yuan square meters (excluding basic costs), 4000 square meters of total cost is about 560,000 yuan, according to the price of 150 yuan square meters, the profit is a total of 40,000 yuan.

    Guangzhou Subote Sports - specializing in the production of basketball courts, tennis courts, campus runways and other sports venue materials (such as acrylic, silicon PU, plastic runway, EPDM, etc.).

  3. Anonymous users2024-02-05

    Summary. <>

    The plastic runway is about 70-140 yuan per square meter, and the ex-factory price of the new national standard breathable plastic runway material is about 70-85 yuan square meters; The ex-factory price of the new national standard hybrid plastic runway material is about 110-120 yuan square meters; The ex-factory price of the new national standard all-plastic runway material is about 130-140 yuan square meters. For example, the construction of a standard 400-meter plastic runway is about 80-100 yuan, with an area of 3,000 square meters as an example, and the total cost ranges from 500,000 to 1 million.

    How much is a square meter of plastic runway?

    The plastic runway is about 70-140 yuan per square meter, and the ex-factory price of the new national standard breathable plastic runway material is about 70-85 yuan square meters; The ex-factory price of the new national standard hybrid plastic runway material is about 110-120 yuan square meters; The ex-factory price of the new national standard all-plastic runway material is about 130-140 yuan square meters. For example, the construction of a standard 400-meter plastic runway is about 80-100 yuan, with an area of 3,000 square meters as an example, and the total cost ranges from 500,000 to 1 million.

    At present, the mainstream plastic runway can be subdivided into (** from low to high) through the new national standard GB36246-2018. The following **is not absolute**. The ex-factory of materials varies in different periods, and the labor costs vary in different periods.

    The size of the site affects the construction cost, the transportation distance affects the transportation cost, and the basic conditions of the site affect the quantity of the back cover material, thus affecting the cost.

  4. Anonymous users2024-02-04

    <> the ex-factory price of the new national standard breathable plastic runway material is about 125 yuan square meters; The ex-factory price of the new national standard hybrid plastic runway material is about 180 yuan square meters; The ex-factory price of the new national standard all-plastic track material is about 200 yuan square meters.

  5. Anonymous users2024-02-03

    The ex-factory price of the new national standard breathable plastic runway material is about 70 85 yuan square meters.

    The plastic track, also known as the all-weather track and field track, is composed of polyurethane prepolymer, mixed polyether, waste tire rubber, EPDM rubber particles or PU particles, pigments, additives, and fillers.

    Color: Special polyurethane particles, soft surface color, granular surface, to prevent the reflection of dazzling sunlight, beautiful and durable, and can be used in multi-color matching.

    Economical: Convenient maintenance and saving for governance.

    Safety: Prevents sports injuries from falls.

    Adhesion: special construction treatment, strong adhesion, can press the moisture rise, no bubbles, peeling and other phenomena.

    Flatness: The construction uses self-leveling materials, and the surface is flat, which can meet the requirements of a particularly flat playing field.

  6. Anonymous users2024-02-02

    The main aspects of the plastic runway contractor are affected: whether there is a foundation, whether there is a foundation, what is the situation, whether there is any ground material laid, and if so, it is necessary to clean up the site. If there is no foundation, the foundation is laid with asphalt or concrete, and the gap between the two is large.

    Aside from the foundation, it also depends on the choice of runway type, such as: breathable type, hybrid type, full plastic type, prefabricated type, etc., the breathable type is cheaper, but the comfort and durability are poorer, the hybrid type is more expensive than the breathable type, but the cost performance is high, the most expensive is the prefabricated type, which is almost twice that of the hybrid type, and the construction of the advantage is fast and easy. In addition, there are standard choices, Shanghai standard, Shenzhen standard, national standard.

    There are also differences in different standards**, but not by much. There is also thickness, the standard thickness is 13 mm, if it is not a public project, it does not have to do the standard thickness, it can be designed according to the demand, in short, there is no way to finalize it with a hammer, depending on the design requirements and site conditions.

  7. Anonymous users2024-02-01

    Dear, hello, the plastic runway ** in 500 yuan to 1500 yuan a mountain of blind square contractors. Generally speaking, the foundation is 300 yuan to 1000 yuan square meters, if it is a contractor, you also need to consider the cost of labor, material transportation, auxiliary materials, etc., under normal circumstances, the contractor is higher than simply buying materials. To sum up, the plastic runway is 300 yuan to 1000 yuan square meters, and the contractor is higher than the simple purchase of materials.

Related questions
5 answers2024-03-25

The 150 square copper cable has a maximum capacity of 207 kilowatts. >>>More

14 answers2024-03-25

1. Mainly look at the franchise brand, the brand is different, and the franchise fee is not the same. 2. The cost of renovation and rent is dead. 3

6 answers2024-03-25

1.All-view curved screen: The display with ultra-narrow bezels, immersive visual effects, and hyperboloid side screens brings you a purer visual experience and a smoother and more delicate touch. >>>More

17 answers2024-03-25

1400x295 = total block square *** 750x295 = total square block plus the remaining area is about 1 square area, but the glass shop will not make an area for you to calculate**. >>>More

13 answers2024-03-25

400 meters on the track, exactly half a lap. At the point of symmetry of the finish line about the center of the field: >>>More