Is it OK to do waterproofing after laying cement in a bathroom with tiles on the floor?

Updated on home 2024-03-08
12 answers
  1. Anonymous users2024-02-06

    OK. Waterproofing is actually best done at the end. The last thing to do is to be able to test the waterproofness completely.

  2. Anonymous users2024-02-05

    The concrete floor before our bathroom floor is waterproofed must be dense, uniform and continuous coating film, which means that the floor of our bathroom will form a waterproof coating film after the waterproofing is completed. Just do both.

  3. Anonymous users2024-02-04

    Yes, because the cement will have holes, cracks, serious sand and other problems, can not really play a waterproof role, and then must be repaired to do waterproof treatment.

  4. Anonymous users2024-02-03

    Hello dear! I'm here to answer your questions, and I'm glad you asked! Is it okay to do the waterproofing of the wall after the bathroom floor tiles are paved? The bathroom tiles have been paved and cannot be waterproofed.

    The waterproof coating is done before pasting the tiles, and the first process of bathroom decoration is to make waterproof coating. There are many kinds of materials used in home decoration, including ceramic tiles, auxiliary materials for pasting tiles, and waterproof coatings. The first process of new house decoration is the bathroom, bathroom decoration, first of all, change water and electricity, water and electricity are installed in the location designated by the owner.

    After the water and electricity are installed, the wall can be leveled. The bathroom is made of waterproof coating, which has high requirements for the flatness of the wall, and the wall is smooth and smooth, and it can be directly waterproofed. The wall is partially rough and uneven, or there are cracks to do waterproof coating The effect is not ideal, the wall needs to be leveled, the leveling mortar does not need to be wiped too thick, and the wall can be evenly leveled.

    The wall surface is smooth and smooth, which lays a good foundation for waterproof coatings. Usually, the bathroom needs to be waterproofed three times, and the first waterproof paint is dry before the second waterproofing can be done. After the waterproof coating of the bathroom is done three times, you can paste the wall tiles and pave the floor tiles.

    The bathroom is waterproof, all before the tile is pasted, and the tile cannot be pasted without waterproof coating. Everyone is very aware of the brightness of the tile, and with three layers of waterproof paint on it, the luster of the tile is gone. What you see on the tiles is waterproof paint, and you can't see the color of the tiles.

    Decorate the bathroom to do waterproofing, never heard of waterproof paint made on the tile. Before renovating, it is important to learn and understand some aspects of decoration. The bathroom is basically pasted with light-colored tiles, because the bathroom has fewer windows, and some bathrooms do not have small windows.

    The bathroom basically chooses beige, or white pattern tiles are more, the bathroom has small windows, you can choose warm color tiles, such as pale pink tiles with patterns, after all, the bathroom is the most frequent place to use every day, warm pattern tiles will feel very warm. Such a beautiful tile is made of three layers of waterproofing, and the whole bathroom is dark gray. Because the walls also need to be waterproofed, the tiles are not visible in the bathroom.

    It is important to do waterproofing in the order of the process. The bathroom is waterproofed three times before pasting the tiles, and after the tiles are pasted, it is not possible to do waterproof coatings.

  5. Anonymous users2024-02-02

    You don't have to. After passing the closed water test of the bathroom floor, you can pave the wall tiles. Previously, the dry ash layer of the wall can be used as a protective layer to avoid water, and there is no need to apply a waterproof layer material.

    When the bricking of the wall is completed, it is necessary to carry out the waterproof closed water test again. After passing the two closed water tests, it can be done.

    The closed water test, also known as the water storage test, should be filled with water, and the water should have a sufficient volume. The water storage depth of the water storage test should not be less than 20mm, the water storage height is generally 30-40mm, and the water storage time shall not be less than 24 hours.

    This test is generally done on the roof, bathroom or room with waterproof requirements. In the early stage of the water storage test, it should be inspected downstairs every 1 hour, and every 2-3 hours in the later stage. If water leakage is found, the water storage test should be stopped immediately, the waterproof layer should be re-improved, and the water storage test should be carried out after the treatment is qualified.

    Building waterproofing is the measures taken from the building materials and structure to prevent the penetration of water into certain parts of the building. Waterproofing is mostly used in roofs, underground buildings, underground parts of buildings, inner chambers and water storage structures that need to be waterproofed. According to the different measures and means taken, it is divided into two categories: material waterproofing and structural waterproofing.

    Material waterproofing is to rely on building materials to block the passage of water to achieve the purpose of waterproofing or increase the ability to resist leakage, such as membrane waterproofing, coating film waterproofing, concrete and cement mortar rigid waterproofing, clay, ash waterproofing, etc.

    Structural waterproofing is to adopt a suitable structural form to block the passage of water to achieve the purpose of waterproofing, such as waterstop and cavity structure. The main application areas include roofing, underground, exterior walls and interiors of housing construction; municipal works such as urban roads, bridges and underground spaces; bridges and tunnels for highways and high-speed railways; underground railways and other traffic projects; Water conservancy projects such as diversion canals, reservoirs, dams, hydropower stations and water treatment, etc. With the progress of society and the development of building technology, the application of building waterproof materials will extend to more fields.

  6. Anonymous users2024-02-01

    There are many kinds of raw materials used in home decoration, mainly including floor tiles and waterproof materials for bathroom waterproofing. Then the problem comes, the toilet pavement is not waterproof, can it be pasted with wall tiles? According to the steps of interior decoration, the toilet must be made of waterproof materials, and then it is considered that the wall tiles are not waterproofed, and <>

    Can't stick to the floor tilesToday's real estate developers will do a moisture-proof solution for toilets and restaurant kitchens before taking houses to residents, because the list of quantities for waterproofing is large, and the construction quality will inevitably be negligent, resulting in peeling and falling off the ground waterproofing. If the moisture protection is not good or the quality is weak, the water in the toilet will leak to the bottom of the building. The basement toilet is not waterproof, and the concrete cracks will crack the concrete layer over time, causing the hot water to penetrate the ground, making the toilet wet and cold, and the floor tiles will grow mold.

    Although it is not easy to damage the next-door neighbor, the toilet will smell bad. The bathroom is decorated according to the order of steps, the water and electricity are reinstalled, and the damaged position of the wall must be smoothed out, for example, the wall is made of a concave groove with a hand drill, and the water and electricity decoration is done, and the outside is not smoothed with mixed mortar, how to paste the floor tiles? Even if you make do with the floor tiles, once there is a problem with the hydropower project installed in the wall, how can you repair it?

    Therefore, the wall is not solved by ground leveling, and there is no way to stick the wall tilesIt is important to follow the sequence of steps. Before the toilet sticks the floor tiles, it is necessary to carry out the trial paving, the floor tile specifications and the total area of the toilet, remove the deformation joint in the middle of the floor tile, it is unlikely to close the seam tightly, which is to carry out the floor tile trial paving before pasting the floor tile, the wall and the road surface are not made of waterproof materials, and it is not very neat, there is no way to test the paving, because the wall and the road surface are uneven, the role of the test paving is not accurate, so the toilet is not waterproof, it is not possible to stick the floor tiles.

  7. Anonymous users2024-01-31

    No, because the bathroom has to be in contact with and use water for a long time, if it is not waterproof, then it is easy to leak over time, and the tile itself has a water absorption rate, so there is no waterproof effect, so it is necessary to use professional waterproof materials to do waterproofing. The requirements of the waterproof standard for the bathroom are that the ground needs to be done all, and the wall should be at least full high, and if it is a lightweight wall, then it must be done full height.

  8. Anonymous users2024-01-30

    No, because the bathroom is not waterproofed, it is easy to cause leakage problems in the house and downstairs after using water, resulting in certain economic and mental losses.

  9. Anonymous users2024-01-29

    Yes, because the bathroom is particularly humid, we will take a bath in the bathroom in the future, if the bathroom is not waterproof, it will be easy to leak in the later stage, which will lead to inconvenience downstairs, and will also lead to water leakage downstairs.

  10. Anonymous users2024-01-28

    I think that if the bathroom floor is not waterproof, it is not allowed to pave floor tiles; Because if you don't do a good job of waterproofing, it is easy to destroy these floor tiles, and it will also penetrate downstairs, causing a serious impact on the downstairs, I think you should do a good job of defense at this time.

  11. Anonymous users2024-01-27

    When we decorate the house, we must carefully decorate the bathroom, but we can't be sloppy, because it is the place where we use the most water, and it is also the most prone to problemsAfter the bathroom wall is pasted with tiles, is it doing the ground to prevent water??Actually, that's not the case, look down!

    Some people are not too clear about this, in fact, after the waterproofing of the bathroom is done, the bricks are paved, and the waterproofing is tested before the bricks are laid, not the bathroom wall tiles are done after the floor waterproofing.

    1. Inspection after the tile paving in the bathroom: After the tile is paved, we have to check, if there is a hollow drum found at that time, then it is necessary to repair and repave the problematic place.

    2. Walking should be done after the ground is dry: after the ground tiles are paved, we must wait for the ground to dry before we can walk around on the brick surface or carry out other kitchen and bathroom decoration projects.

    4. Wall hollow drum inspection: when we punch holes for the wall, we must check whether there is a hollow drum, and at the same time, we should not do an important thing, check the remaining hydropower transformation pipeline diagram, and do not hit the top of the pipeline.

    The whole content of the bathroom wall and floor tiles is explained here for all of you, and there are still a lot of things that need our attention, we should pay more attention, for example, when we finish paving the tiles, we should see if there is a hollow place, if there is, immediately repair, no better, not that the bricks are paved and pasted there is nothing to do, but it is not so simple to imitate the dust, do what you should do, can not have a preface.

    You can get it for free

  12. Anonymous users2024-01-26

    No, the waterproofing is to be done at the base level, the surface layer has been completed, and the special honey with the waterproof performance can only be used to fill all the gaps in the right of the wall and floor tiles seriously, and fill all the floor drains.

    After the waterproof layer is done, a certain amount of time should be left to make the waterproof layer better integrated with the building, and then the protective layer on the waterproof layer and then paved with floor tiles.

    Commonly used materials for waterproofing.

    JS composite waterproof coating is suitable for all kinds of water towers, pools, water tanks, puddles, sluices of anti-seepage, leakage-proof, waterproof, anti-corrosion, is the first amphibious products that can be waterproof and anti-corrosion, tap water, drinking water pools can be used (with non-toxic test report), coated JS composite waterproof coating long-term immersion in water life of more than 30 years.

    All kinds of sewage pool waterproofing can be coated with JS composite waterproof coating, one cloth three coats or two cloths five coats, which is convenient for construction, beautiful and wear-resistant.

    It is suitable for waterproof and anti-corrosion of various cooling towers and cooling water towers, and can also play a role in anti-freezing, and the use temperature can reach -150 °C. In the outdoor project, it is also equipped with a strong anti-ultraviolet PHA topcoat. <>

Related questions
22 answers2024-03-08

Tile joints can effectively solve the problems of blackening, falling off, and peculiar smell between the gaps of ceramic tiles. >>>More

15 answers2024-03-08

How to match bathroom tiles What color is good? What color is better for bathroom tiles? In fact, in the process of bathroom decoration, there are certain requirements for the color of its wall tiles, and it is recommended to choose light-colored series of bathroom tiles, which will feel cleaner in this color. >>>More

6 answers2024-03-08

The first step, before the waterproof treatment of the bathroom, the first thing is to level the floor level of the bathroom, the ground is uneven, when the waterproof paint is painted, it may be uneven, or the ground is easy to crack because of unevenness, which will crack with the ground even if the waterproof paint is applied. >>>More

22 answers2024-03-08

The waterproof coating is applied coldly twice, and the second scraping direction is perpendicular to the first. The perimeter of the wall extends from the ground up to a height of not less than 30 cm.