How to do a construction engineering cost internship report

Updated on educate 2024-03-20
1 answers
  1. Anonymous users2024-02-07

    Hello dear <>, I am happy to answer for you, the answer is as follows: the engineering cost training report requirements are the purpose of the training, the municipal engineering quota and budget training is a practical course, is a professional comprehensive exercise after completing the course learning. In the course teaching of municipal engineering budget, students have completed the calculation of the quantity of each sub-project and the application of the base price of the fixed amount, and have mastered the calculation procedure of the project cost and the preparation of the bill of quantities.

    However, due to the limited class time, a relatively complete set of construction drawing budget has not yet been prepared. With the characteristics of many contents, long time and single-piece budgeting, it is far from being able to achieve a better and comprehensive grasp of the methods and basic skills of municipal engineering budgeting only through the budget practice of sub-projects. Therefore, through the practical training and operation training of municipal engineering budgeting, it is conducive to students to apply the knowledge they have learned, and further better grasp the methods, procedures and skills of municipal engineering budgeting.

    Second, the content of the training The main content of the training is to prepare a complete set of municipal unit engineering construction drawing budget and list project valuation according to the design of the building, structural construction drawings, budget quota, cost quota, list pricing specifications and related information. The specific content is as follows:1

    Familiar with construction drawings and related information; 2.Listing and calculating engineering quantities; 3.application and conversion of budget quotas; 4.

    Calculation of direct engineering costs5Analysis of materials and anus and adjustment of price spreads of main materials (steel, cement, sand, crock, etc.); 6.Calculate the cost of measures, overheads, profits, taxes, and calculate the cost of the project; 7.

    Prepare a complete construction drawing budget (including preparation instructions, unilateral cost construction area, engineering quantity calculation table, engineering budget table, material, labor, mechanical analysis table, material consumption summary main material price difference adjustment table, project cost summary table, etc.), and bind into a book. 8.Bill of quantities as a solicitation document (with standard text format) 9

    As a list of bidding documents, the quantity of ** (with standard text format) three, training requirements 1Under the guidance of the teacher, independently and completely complete the preparation of the budget and list of municipal engineering construction drawings of the unit and its valuation. 2.

    Adopt the various types of unified and unified regulations (the attached table is a reference**) to complete the contents of the budget preparation. 3.The software compiles the content of this training, and uses the software calculation method to complete the whole process of the preparation of the budget content of the unit's municipal engineering construction drawings.

    4.Time requirements: Within one week of the specified training time, the preparation of various training contents shall be completed in stages.

Related questions
5 answers2024-03-20

The construction cost is composed of the following parts:

1. Direct engineering costs, that is, various expenses that constitute the engineering entity, including labor costs, material costs, construction machinery use costs, etc. >>>More

10 answers2024-03-20

In fact, now the project cost is generally recruited to have three to five years of work experience, because novices are inexperienced and easy to make mistakes, and the recruitment company is also afraid of spending two or three years to train out of the newcomer to jump ship, resulting in a waste of resources of the enterprise, for the newcomers who have just graduated, they do not necessarily have to do the cost, you can first go to the construction unit or supervision unit to do a period of time to be familiar with the construction site and construction technology, increase the construction experience will be very helpful to do the cost in the future, If you have to do the cost, then go to the local talent market to see, or through the relationship between family and friends and classmates, it is not easy to find it in winter, it is easy to find a job next spring, you can take a certificate first after graduation, maybe it will be useful to find a job, I hope it can help you.

8 answers2024-03-20

Construction project cost management.

Valuation of construction projects. >>>More

6 answers2024-03-20

Filing and registration form of construction project completion statement. >>>More

11 answers2024-03-20

1. Introduction to the project.

2. Project cost. >>>More