-
1. Introduction to the project.
2. Project cost.
3. Engineering energy saving, fire prevention, etc.
4. New technology.
5. The completion of the project (including subcontracting) should be specific.
6. Summary.
-
1. Overview of the project, 2. Construction organization design, 3. Compliance with laws and regulations and mandatory construction standards.
4. The results of the construction quality inspection of the project.
5. The implementation of design documents for the construction of the project.
6. Performance of the project contract.
Within 7 working days before the date of acceptance, notify the engineering quality supervision agency to participate in the acceptance. Within 5 working days after acceptance, the engineering quality supervision agency shall submit the project quality supervision report to the filing authority. Within 15 days from the date of acceptance, the construction unit shall issue a project completion acceptance report and file it.
Submit a complete construction project file to the Urban Construction Archives within three months after acceptance. Before the completion and acceptance, the construction unit will identify and the urban construction archives will pre-accept the files.
The project completion acceptance report includes:
1. Project overview.
2. The implementation of capital construction procedures by the construction unit.
3. Evaluate the design, construction, supervision and other units of the project.
4. The time, procedure, organizational form and content of the project completion acceptance.
5. Project completion acceptance appraisal.
6. Completion handover certificate.
7. Project quality warranty.
8. Project quality assessment report.
9. Quality inspection report.
10. Project completion report.
11. Construction permit.
12. Review opinions on construction drawing design documents.
13. The acceptance opinion of the project completion signed by the acceptance team personnel.
14. Other relevant documents stipulated by laws and regulations.
-
The content of the project completion report includes engineering design, engineering construction, engineering supervision and engineering files, etc. The project completion report shall describe the acceptance of sub-projects, sub-divisions, sub-projects, units (sub-units) projects, project quality inspection, concealed engineering acceptance, material and equipment qualification certificates and on-site inspection and retest.
Project completion acceptance report: The completion acceptance report refers to the written report formed after the completion of the project, after the establishment of a special acceptance agency by the relevant departments, and the organization of experts to conduct quality assessment and acceptance, briefly describing the approval of the project feasibility study report or the plan task book and the approval unit and the approval number, the approved construction investment and project budget estimate (including the revised budget estimate), the specified construction scale and production capacity, and the main content of the lump sum agreement of the construction project.
-
1) Project overview, acceptance date and name of participating units;
2. The implementation of capital construction procedures by the construction unit.
4) Survey, design, construction, supervision unit name and qualification level;
5) the construction unit's project completion report, survey, design unit's quality inspection report and supervision unit's project quality assessment report on the basic situation and conclusion of quality acceptance;
6) The specific part of the project and the degree of influence on the main use function of the project after the project is rejected;
7) The main problems affecting the quality of the project and the rectification are found during the implementation of the project;
8) The evaluation and conclusion of the construction and management unit on the quality of the project.
9) The project completion report should also be accompanied by the following documents:
11. Construction permit.
12. Review opinions on construction drawing design documents.
13) Project completion report submitted by the construction unit;
14) the quality assessment report submitted by the supervision unit;
15) The quality inspection report submitted by the survey and design unit;
16) Project quality warranty signed by the construction unit;
17) Engineering quality inspection and functional test data;
-
1.Acceptance content of engineering and technical data.
1) Engineering geology, hydrology, meteorology, topography, geomorphology, buildings, structures and important equipment installation locations, survey reports, records;
2) Preliminary design, technical design or expanded preliminary design, key technical tests, overall planning and design;
3) Soil test report and foundation treatment;
4) Construction records of construction projects, quality inspection records of unit projects, pipeline strength, tightness test reports, equipment and pipeline installation construction records and quality inspection, instrument installation and construction records;
5) Equipment commissioning, acceptance operation, maintenance records;
6) Technical parameters, performance, drawings, process descriptions, process regulations, technical summary, product inspection, packaging, process drawings of the product;
7) Drawings and manuals of equipment;
8) Foreign-related contracts, negotiation agreements, letters of intent;
9) Information on the as-built drawings of each individual project and all pipe networks.
2.The content of the acceptance of the comprehensive data of the project.
Project proposal and approval, feasibility study report and approval, project assessment report, environmental impact assessment report, design assignment. Land requisition declaration and approval documents, contracting contracts, bidding documents, construction licenses, project completion acceptance reports, acceptance appraisals.
3.The content of the acceptance of the financial data of the project.
1) Construction funds (allocation, loan) and application over the years;
2) Annual financial accounts approved in previous years;
3) Annual investment plan and financial revenue and expenditure plan for the past years;
4) construction cost information;
5) financial information for payment purposes;
6) Design budget estimates and budget information;
7) Construction final account information.
-
The completion report shall be filled in by the construction unit, and the specific arrangement of which staff shall be responsible for the issuance of the completion acceptance report is an internal affair of the unit and shall be arranged by the unit itself.
The content and function of the completion report:
the preliminary work and implementation of the project; design, construction, general contracting, construction supervision, equipment suppliers, quality supervision institutions and other units; the commencement and completion dates of each individual project; The amount of work to be completed and the production capacity formed (detailing the reasons for the advance or delay of the construction period, the reasons for the deviation of the production capacity from the original plan, and the countermeasures taken to ensure the implementation of the original plan during construction).
The initial inspection time and the main conclusions of the initial inspection and the ** condition of the trial operation (the initial inspection report and the main test indicators of the trial operation should be attached, and the trial operation time is generally 3-6 months). Budget estimates (revised budget estimates), budget implementation and preliminary final accounts, and investment analysis of communication construction projects.
The record of major events in the construction of the project, the completion data of each individual project, the acceptance data of the concealed project, the design documents and drawings, the supervision documents, the main equipment and technical data, and the documents in the construction of the project are sorted out and archived.
The test values and conclusions of the main technical indicators; Analysis of the quality of the project, description of the situation after the treatment of the quality accident that occurred in the construction; construction cost analysis and main economic indicators, as well as the investment benefits obtained by adopting new technologies, new equipment, new materials and new processes; The analysis of investment benefits, the proportion of fixed assets in investment, the direct income of enterprises, the analysis of the return on investment period, and the analysis of breakeven.
-
Under normal circumstances, the project completion report generally refers to the completion acceptance report submitted to the construction unit after the completion of the project and the application of the construction unit for verification. The content of the project completion report generally includes: engineering design, engineering construction, engineering supervision and engineering files.
The project completion report should describe the sub-item, sub-division, sub-project, unit project acceptance, project quality inspection, concealed project acceptance, material and equipment qualification certificate and entry inspection and retest.
[Legal basis].Regulations on the Quality Management of Construction Projects Article 16 After receiving the completion report of the construction project, the construction unit shall organize the design, construction, engineering supervision and other relevant units to carry out the completion acceptance.
The following conditions shall be met for the completion and acceptance of construction projects:
1) Complete the construction project design and the contents agreed in the contract;
2) Have complete technical files and construction management materials;
3) There is an approach test report of the main building materials, building accessories and equipment used in the project;
4) There are survey, design, construction, engineering supervision and other units signed by the quality of the documents;
5) There is a project warranty signed by the construction unit.
If the construction project experience is qualified, it can be delivered.
-
The project completion report refers to the construction department to submit the documents proving that the project has the conditions for completion inspection to the construction department or supervision department according to the requirements of the unified standard for construction quality inspection of construction projects after the completion of the project. The project completion report shall explain the sub-item, sub-item, sub-project, unit (sub-unit) engineering inspection, engineering quality inspection, concealed engineering inspection, material and equipment qualification certificate and admission inspection and re-examination. Its content mainly includes:
The general situation of the project and the actual completion, the quality of the project self-assessed by the enterprise, the construction technical data and the construction management data, the commissioning of the main construction equipment, the testing of the relevant testing items, the rectification of the rectification of the problems ordered by the construction administrative department and the engineering quality supervision agency entrusted by the relevant departments.
Unified Standard for Acceptance of Construction Quality of Construction Projects
Article 3 The quality of construction projects shall be accepted according to the following requirements:
1) It should comply with the provisions of this standard and relevant professional acceptance specifications.
2) It should meet the requirements of engineering survey and design documents.
3) The personnel of all parties participating in the acceptance shall have the required qualifications.
4) Acceptance shall be carried out on the basis of the construction unit's own inspection and evaluation.
5) Before concealing the concealed project, the construction unit shall notify the relevant units for acceptance, and form the acceptance of the bright parts. Article 3 of the Unified Standard for Acceptance of Construction Quality of Construction Projects.
-
This completion report is actually a project after the end of the silver book, completely completed, then this also needs to be a comprehensive macro summary and report, this is actually the kind of completion report.
-
The project completion report is a required completion acceptance report submitted to the construction unit after the completion of the project and the application for verification by the construction unit.
-
Hello dear<>
We're happy to answer your questions! The project completion report is written.
First, the completion of the overview first need to write a clear overview of the completion, the specifications are the first project in the first development zone, its west is the first road, the south is the first road to write the road around all sides, and then the project management is responsible for the design of the first supervision, these are written at the beginning of the completion of the overview, so that everyone can understand it as soon as you read it. Then you need to write down the details of the location of the whole project, such as some roads and parking lots, heating, sewage treatment, these are all part of this project, so they must be written in detail, for example, the road should be written clearly, the area, the maximum width, the road structure and total thickness and what materials the road is made of, do you understand, in short, every detail is to be marked. It is advisable to state how long the project has lasted, why it has not been carried out properly, where the design has been changed and for what reason, and this is almost clear when the completion is indicated.
Second, the completion of the difficulties of the completion of the overview of the completion of the general situation to explain the completion of the difficulties, such as at the start of construction due to some water and electricity problems, on-site roads and material stacking problems and a series of problems have become the completion of the difficulties, write clearly where the difficulties are in the end what way to solve, the effect of the decision after the decision. Third, the construction method and control points also need to be written in the completion report, to give you an example. The project started on the first day of the year, according to the characteristics and importance of the project set up experienced technical personnel, project managers, road construction team, drainage construction team to manage as the core, to ensure the quality, construction period, safety and other successful completion.
The main construction methods of the project are deployed by the project experience, the arrangement is reasonable, and the key points to control the rise of the cluster are: pipeline seepage and local excavation, the need to pay attention to the construction quality and safety, and the pipeline construction to carry out thermal insulation and other treatment measures. It is basically enough to write in this order, of course, each person's construction method and control points in the project are different, and everyone needs to describe it according to their own project. Fourth, the general evaluation of the quality of the project is the last step of the project completion report is relatively easy, as long as the description of the project is in strict accordance with the provisions of the acceptance, the appearance meets the requirements of the quality also has data to prove, to the leaders and colleagues to express heartfelt thanks and respect to the completion.
The phenomenon of honeycomb is that the concrete structure is partially scattered and has no strength. The phenomenon of hemp surface is that there is a lack of slurry and many small pits and pittings on the local surface of the concrete, forming a rough surface, but there is no exposed steel bar. >>>More
Hello, I am also a person engaged in the construction industry, I think there should be no such person as the pay-off person you said, these jobs are technicians, supervisors can be said to be the losers, the quality of the project is the professionals invited by Party A to supervise and know the construction quality and the project of Party B. >>>More
Application form ID card of the insured (beneficiary) Entrusting someone else to do it also requires a power of attorney, identity certificate of the entrusted person, salary statement or attendance sheet for the three months before the accident and the labor contract of the insured unit. >>>More
1.Don't look down on migrant workers, because they may have more experience than you do, and they can teach you things that you don't have in books. >>>More
Hello, the area of the construction engineering carpentry formwork is calculated separately, and it is also only calculated that the formwork is stained with ash to calculate the effective area. >>>More