Construction Safety Inspection Standards>> The summary table has a full score of 100 points. The full score of each itemized checklist in the summary table should be:
Safety management (out of 10 points), civilized construction (out of 20 points), scaffolding.
The full score is 10 points), foundation pit support.
With formwork engineering (full score of 10 points), "three treasures", "four mouths" protection (full score of 10 points), construction electricity (full score of 10 points), material hoist.
With external elevators (full score of 10 points), tower cranes (full score of 10 points), lifting and hoisting (full score of 5 points), construction machinery (full score of 5 points). <
Safe construction. Security system.
1. Establish a safety responsibility system and implement the responsible person. Safety measures are a series of activities to plan, organize, command, coordinate or monitor the safety production of construction projects, which can ensure personal safety, equipment safety, structural safety, property safety and create a suitable construction environment during construction. In the construction, it is necessary to adhere to the policy of "safety first, prevention first".
The project leader is the person responsible for the project, and the focus of control is the unsafe behavior of personnel in construction, the unsafe state of equipment and facilities, the unsafe factors of the working environment and the unsafe defects in management. The responsible person should carry out safety inspections before construction to eliminate unsafe factors in the bud.
2.Set up a full-time safety officer.
Fully responsible for the safety of the construction project, coordinate the safety production of the project, and ensure and supervise the implementation of various measures.
3.Strengthen safety education and publicity work, so that safety awareness has been further improved.
-
The actual score for each item, divided by the full score of the item, multiplied by the full score of the item in the total number of items, and then summed. For example, in case of safety management, the actual score is 46 points, divided by the full score of 50 points, and then multiplied by the full score of 10 points = points for the total number of items. The sum of each item = the final score.
After counting the score for half a day, there is no bounty point.
-
3) When there are missing items in the sub-table, the total score of the sub-table is calculated as follows: the sub-table score of the missing item = (the sum of the scores of the actual items to be examined 100) the sum of the values of the points to be scored.
If there is a problem with this description, it should be: (3) When there are missing items in the sub-table, the total score of the sub-table is calculated as follows: the sub-table score of the missing item = (the sum of the actual scores of the actual items 100) the sum of the scores of the actual items.
The quality standards of construction projects include: meeting the quality objectives and quality requirements of the project; Comply with the agreed requirements of the signed contract and supplementary agreement; Meet the requirements of design and construction drawings and technical documents; Comply with various norms and standards and quality management rules and regulations of the department; Pass acceptance. >>>More
During the construction period, the supervisors should have a comprehensive understanding of the use of building materials, and do a good job in the corresponding quality control work, through the fine management of process quality collection points to support the full control of the pile foundation inspection process, and improve the progress of construction personnel, saving time and reducing costs for enterprises. Zhijian Cloud construction safety management software provides a multi-party collaboration system for problem handling of construction enterprises from quality, safety and equipment, and all participating units can record problems as inspectors, and the rectification units repair and feedback the problems, and then the inspectors review and cancel the problems.
GB 50656-2011 Construction enterprise safety production management standard status: current. >>>More
Many of the state's preferential policies for the re-employment of laid-off personnel expired in 2008, and the precondition is that they must hold a "re-employment preferential certificate". In February 2009, the company issued the "Notice on Doing a Good Job in Employment under the Current Economic Situation", which stipulates that "the tax support policy of encouraging laid-off unemployed people to start their own businesses will be continued, and those who hold the "Reemployment Preferential Certificate" will be exempted or exempted from business tax, urban maintenance and construction tax, education surcharge and personal income tax within the limit according to the regulations, and the approval period will be extended to the end of 2009". Therefore, in the case of your father, I wonder if there is a "Re-employment Preferential Certificate"? >>>More
1) Set up the "engineering construction" account (used by construction and installation enterprises) or the "production cost" account liquid excavation (used by shipbuilding and other manufacturing enterprises) to calculate the actual contract cost and contract gross profit. The actual contract costs and the recognized gross profit of the contract are credited to the debit side of the Division, and the recognized contract losses are credited to the credit and write-off party of the Division, and after the completion of the contract, the Doosan account and the "Construction Settlement" account are hedged and settled. >>>More