Emergency plan, special construction plan 370
Decoration Engineering Special Construction Organization Design 314
Special construction plan for punching and grabbing cone hole-forming cast-in-place piles 394
Scaffolding Special Safety Program 375
Special construction plan for sliding form of granulation tower (with CAD drawings) 198 Scaffolding special construction organization design 361
Special construction plan for the fence (with CAD drawings) 881
Special scheme for engineering blasting 294
Tower crane installation and demolition special construction plan 345
Special scheme for earthwork excavation 613
Exterior wall plastering special construction plan 312
Special construction plan for embankment rubble slope protection 532
Special construction plan for scaffolding (with CAD scaffolding) 2240 special construction plan for steel reinforcement engineering 1571
Special construction plan for doors and windows 320
Special construction plan for formwork engineering 1609
Passenger and freight elevator construction plan (special construction plan) 400
Special construction plan for waterproofing project 1076
Special safety construction plan for scaffolding erection 229
Moso bamboo scaffolding project special program 189
Dam grouting special construction plan 238
Special plan for fire protection and fire prevention 1684
Special plan for the construction safety of bored piles for civil engineering of Guangzhou University Town Tunnel.
-
2. The construction of the construction project shall meet the requirements of the engineering survey and design documents.
3. The personnel of all parties involved in the construction quality acceptance of the jujube plus project shall have the prescribed qualifications.
4. The acceptance of the project quality shall be carried out on the basis of the construction unit's own inspection and evaluation.
5. Before concealing the concealed project, the construction unit shall notify the relevant units for acceptance, and the acceptance documents shall be formed.
6. Test blocks, test pieces and related materials involving structural safety shall be witnessed and sampled according to the regulations.
7. The quality of the inspection batch should be accepted according to the main control project and the general project.
8. Sampling testing should be carried out for important branch projects involving structural safety and use functions.
9. The unit that undertakes witness sampling testing and related structural safety testing shall have corresponding qualifications.
10. The perceived quality of the project should be inspected by the acceptance personnel on site and should be jointly confirmed.
Legal basis: "Regulations on the Management of Qualifications of Highway and Water Transport Engineering Supervision Enterprises".
Sixth highway and water transport engineering supervision enterprise qualifications are divided into two majors: highway engineering and water transport engineering. The professional supervision qualification of highway engineering is divided into three grades: Class A, Class B and Class C, and special independent bridges, special independent tunnels, and highway mechanical and electrical engineering; The professional supervision qualification of water transport engineering is divided into three grades: grade A, grade B and grade C, and the special project of water transport mechanical and electrical engineering.
Seventh highway and water transport engineering supervision enterprises shall be in accordance with the level of qualification and business scope of the excavation and lifting to carry out supervision business
A) to obtain highway engineering professional supervision qualifications, can be engaged in nationwide.
Supervision of first, second and third types of highway engineering, bridge engineering and tunnel engineering projects;
2) Obtain the qualification of grade B supervision of highway engineering, which can be engaged in nationwide.
Second, the supervision business of highway engineering, bridge engineering and tunnel engineering projects.
-
The specific plan should include engineering fluid mechanics, water supply and drainage theory, technology and facilities, urban wastewater treatment and reuse, sludge resource technology, etc.
Legal basis: The Road Traffic Safety Law of the People's Republic of China
Article 3 Road traffic safety work shall follow the principle of managing according to law and facilitating the masses, so as to ensure that the traffic on the road is orderly, safe, and unimpeded.
Article 105 Where road construction work or roads are damaged, warning signs are not set up in a timely manner, protective measures are not taken, or traffic lights, traffic signs, or traffic markings should be set up but traffic signals are not set up or traffic lights, traffic signs, or traffic markings are changed in a timely manner but are not changed in a timely manner, resulting in losses to passing personnel, vehicles, and other property, the unit with relevant duties shall bear the responsibility for compensation in accordance with law.