Seek truth from facts according to the situation on the spot.
-
Check the scoring methodology.
1. In the construction safety inspection and evaluation, ensure that all items should be inspected.
2. The construction safety inspection and evaluation shall comply with the relevant provisions of each inspection and evaluation item in Chapter 3 of this standard, and shall be scored according to the scoring table in Appendix A and B of this standard. The inspection score sheet should be divided into safety management, civilized construction, scaffolding, foundation pit engineering, formwork support, work at height, construction electricity, material hoist and construction lift, tower crane and hoisting, construction machinery and tools sub-inspection score table and inspection score summary table.
3 The scoring of each score sheet shall comply with the following requirements:
The full score of the sub-examination score table and the inspection score summary table should be 100 points, and the actual score value of the score sheet should be the sum of the scores of each inspection item;
The method of deducting the score value shall be adopted, and the sum of the deducted points shall not exceed the value of the examination item;
When scoring according to the sub-check mark sheet, if there is an item in the guarantee item that is not scored or the subtotal score of the guarantee item is less than 40 points, this item check mark sheet should not be scored;
The actual score value of each sub-item in the check score summary table should be calculated as follows:
a1=b*c/100
where: A1 — the actual score value of each sub-item in the summary table;
b — the full score for the item in the summary table;
c — The actual score of the checklist.
When there is a deficiency in the scoring, the total score value of the itemized check score table or the check score summary table shall be calculated as follows:
a2= d/e*100
where: a2 — the total score value in the event of a missing item;
d — the sum of the actual scores of the items under review in the table;
e — the sum of the full score values of the items under review on the table.
The actual score value of scaffolding, material hoist and construction hoist, tower crane and hoisting project shall be the arithmetic average of the actual score value of the sub-item inspection score table of the corresponding specialty.
-
After answering the acceptance documents or permitted use documents issued by the unit for project quality, fire protection, planning, environmental protection, urban construction files, etc., the construction unit shall organize experts from survey, design, construction, supervision and other units and other relevant aspects to carry out project acceptance and conduct a comprehensive inspection of the physical and technical data of the project. Construction project completion acceptance system - construction project document archiving and sorting specifications - construction project files.
-
According to the provisions of the "Construction Safety Inspection Standards" JGJ59-2011, the safety evaluation of the construction stage meets the qualified standards, and the construction unit agrees with the self-assessment conclusion.
-
Fill in the standard scoring criteria according to the standard line standard.
-
The content of the comments in the summary table of construction safety inspection scores: After the inspection of the safe and civilized construction of the construction site, it meets the JGJ-2018 standard and relevant regulations, and is self-assessed as qualified. 1. In the construction safety inspection and evaluation, ensure that all items should be inspected.
2. The construction safety inspection and evaluation shall comply with the relevant provisions of each inspection and evaluation item in Chapter 3 of this standard, and shall be carried out in accordance with the score table in Appendix A and B of this standard.
-
Preface 1-1Evaluation of Fan Qing's Suiwei: This report is aimed at the dispersion of the project construction safety of the following projects. 1-2.This report is prepared in order to supervise the engineer on a daily basis.
-
According to the "Construction Safety Inspection Standards" JGJ59-99, the safety evaluation of the project reached the qualified standard this month, and the self-assessment opinions of the construction unit were agreed, and the evaluation standard was qualified.
In order to scientifically evaluate the safety production situation of construction work, improve the management level of safety production work and civilized construction, prevent the occurrence of accidents, ensure the safety and health of employees, and realize the standardization and normalization of inspection and evaluation work, the relevant departments of the state have formulated the construction safety inspection standard JGJ59-99.
This standard mainly adopts the principle of safety system engineering, combined with the law of accidents in construction construction, and is compiled in accordance with relevant national laws, regulations, standards and procedures.
This standard is applicable to the inspection and evaluation of construction safety work by construction enterprises and their competent departments. In the inspection and evaluation of construction safety work, according to the specific situation such as scores, it is mainly divided into three situations: excellent, qualified and unqualified.
-
Hello dear, happy to answer for you. The construction unit fills in, and the supervision unit reviews it. When the on-site quality inspection of the ridge process, inspection batch, and sub-project of the concealed bridge is organized, and the special supervisor participates, and the representative of Party A can be invited to participate.
When filling in, the quality supervision personnel of the construction party shall fill in the inspection form, and attach the relevant quality inspection and certification materials of the concealed project or sub-project or construction laboratory. The construction project department seals, and the project manager or technical person in charge signs and approves. The supervisor writes the review or acceptance opinion.
Seal of the project supervision agency. If the representative of Party A signs better, but the on-site quality acceptance inspection and evaluation, the representative of Party A can not sign. This table serves as information for daily management.
This form shall be in duplicate, and one copy shall be retained by the project supervision agency and the construction party.
The supervision work in the construction stage is, simply put, the main work content of "four controls", "two pipes" and "one coordination". >>>More
Supervising Engineer Exam Application Guide.
In August 1996, the Ministry of Construction and the Ministry of Personnel issued the Notice of the Ministry of Construction and the Ministry of Personnel on the National Supervision Engineer Qualification Examination (Jian Jian 1996 No. 462), and from 1997, the National Supervision Engineer Qualification Examination was officially held. The examination work is jointly responsible for the Ministry of Construction and the Ministry of Personnel, and the daily work is entrusted to the Construction Supervision Association of the Ministry of Construction, and the specific examination work is responsible for the Personnel Examination Center of the Ministry of Personnel. >>>More
Responsibilities of a professional supervising engineer.
First have the title of engineer, and then sign up for professional supervision engineer training, through the examination to obtain professional supervision engineer can be qualified to practice as a professional supervision engineer. In fact, this depends on your company, the company puts you in the position of a professional supervision engineer, you are a professional supervision engineer, but in the construction project is not a professional supervision engineer for the record. >>>More
In order to ensure the healthy development of the construction supervision business.