    Solution 1: If the Layer 3 switching router is a Layer 3 interface and has a PAT, then you need to limit the rate of the specified IP segment on the interface of the corresponding router in Layer 3.

    The access speed within and between VLANs is not interfered with.

    If the router does the PAT, the Layer 3 switch does not do the PAT, but only makes a route or routing protocol with the router.

    Or not a Layer 3 interface.

    It's best to do this on a router, just like above: there is no interference with the access speed within and between VLANs.

    Buying a station online behavior management.

    Sangfor's network health and so on can be used to make strategies for intranet IPs and limit speeds.

    It can be based on the intranet IP or the machine code.

    It can also be based on the username.

    password, the client does not need to install any plugins.

    You can also do speed limiting for P2P software, etc.

    Do a half-open connection limit on the router +nbar flow control (Cisco feature).

  2. Anonymous users2024-02-07

    It's hard to push this one, hehe, because I don't know how big your network is, hehe. Like in ISP, we may not be able to use such high-end cores in reality, and ISP access is those high-end devices, hehe.

    The school is a rich unit, however, people generally do not consider using Cisco, so Cisco directly failer, followed by the brand, I recommend Ruijie as the main push, because Ruijie has a lot of successful cases in the campus network, in addition, in the billing area, Ruijie also does quite well, so it is recommended to promote Ruijie, for what type of switch to push, you need to see the size of the network, in addition, like the campus network is a large-scale project, it is recommended to strengthen contact with manufacturers, It is best to bring the manufacturer's sales and technology to talk about it, and if you plan to bring the manufacturer, you must first report the project. A project like this must require the participation of manufacturers, and it is difficult for you to become a climate alone.

    The advantage of bringing the manufacturer is that you can hand over many things to the manufacturer to do, including the plan, technical communication, model selection, etc., and some manufacturers and customers will feel very authoritative, and also feel that you value them, but your company should dominate the project.

  3. Anonymous users2024-02-06

    To limit the traffic for each IP, it is a lot of work, route-map can do it, you can load the PDLM package to do the traffic limit for some interested streams.

  4. Anonymous users2024-02-05

    Whether it's routing and switching. If you do flow control on it, the load on the device will be too large. If the company is not large, it can.

    If you want to do traffic control for larger companies, I recommend using allot. Since 97 years, the main research and development of the product flow control has been the only one that has been the first in the world.

    If you have any other questions, please q

Related questions
7 answers2024-04-27

See Computer Science and Technology Textbook Computer Networks, Fourth Edition, by Xie Xiren.

10 answers2024-04-27

The flow rate can be set according to the design or actual requirements, which can automatically eliminate the differential pressure fluctuation of the system and keep the flow rate unchanged. Overcome the uneven heating and cooling of the system and improve the quality of heating (cooling). >>>More

10 answers2024-04-27

Here are some of the well-known brands recognized in the valve industry, which are widely recognized and have a high reputation. While rankings may vary depending on time and market conditions, the following brands are generally considered to be among the top brands in the valve industry: >>>More

11 answers2024-04-27

OK. **Tickets can only be refunded for airport construction fees and fuel surcharges, if your flight is delayed, for whatever reason, including flow control, then submit a flight delay certificate issued by the airport to get a full refund. >>>More

21 answers2024-04-27

There is one of the most effective solutions in our computer room. It is to pull the cord as soon as it is attacked. Do it a few more times. The customer will be very autonomous to call ** to tell you that I was attacked to pull the cord handle...