-
It's not Gaudí, it's Gaudí (Antonio Gaudí).
Antonio Gaudí.
Antonio Gaudi (1852-1926) was a Spanish architect and a representative of the plastic architectural school. He studied at the Provincial School of Architecture in Barcelona, and after graduating, his works were almost ornate Victorian, and later adopted the historical style, which belonged to the mainstream of the Gothic Revival. Gaudí's first major commissions were the completion of the Sagrada Familia (1883-1926) in Barcelona, a building of great character and appeal (Gaudí completed only one transept and one of the four towers at the time of his death), the Mira Apartment, the Batlló Apartment, the Guiel Chapel and the Güell Park.
-
Deng Yaping: Deng Yaping was born in 1973 in Zhengzhou, Henan Province in an ordinary worker family, her parents are table tennis fans, little Deng Yaping began to learn to play table tennis when she was 5 years old, and at the age of 10, she won the team and singles championships in the National Youth Table Tennis Competition. Deng Yaping has won 18 world championships, including the 25th Olympic Games in 1992 and the 26th Olympic Games in 1996 (with Qiao Hong).
At the Barcelona Olympics, Deng Yaping won the women's singles championship, and International Olympic Committee President Samaranch happily fulfilled his promise and personally presented Deng Yaping with an award. Yaping famously said, "I just want to put pressure on my opponent: that is, Deng Yaping is invincible."
Zhang Yining: Zhang Yining, who was born in Beijing in 1981, has given her the nickname "Cold Face Killer" since she became famous at the age of 15, but those who are familiar with her know that Zhang Yining is an optimistic and laughing girl. In 2004, Zhang Yining stood on the podium of the women's singles table tennis champion at the Athens Olympics and smiled with joy.
I'm not happy enough, why do I have to cry? "Interesting! Yining quote Cherish every game, value every opponent, and play your own level.
-
Name: Guo Jingjing.
Gender: Female. Date of birth: 15 October 1981.
Profession: Chinese diver.
Height: m. Weight: kg.
Event: Diving.
Education: University.
Personal hobbies:**.
Personal blog.
-
In the face of difficulties, we must despise them strategically and attach importance to them tactically. Borrowed *** quotes.
First of all, the job search exam is just an exam, so don't be nervous. You have to understand that all exams are used to be scary, and if you are nervous, you can't perform at the level, which is really troublesome.
Second, it is necessary to analyze the essence of the examination. Quick question design is also architectural design, not an art competition, although the drawing effect is important, but the ability to design is the foundation of the exam. The general quick questions are nothing more than that:
Public buildings - clubs, cultural activity centers; Residential – villas, multi-storey residences. It is much better to find relevant information, figure out the function of the plane, memorize two or three planes, and write it silently than blindly drawing. During the exam, half of the time is spent making plans and half of the time is drawing.
Third, hand-drawn is kung fu, which is not easy to improve in a short period of time. For the exam, you can find your own or your classmates' previous works as a reference (don't look for master works), find a piece of each that focuses on the cultural atmosphere and commercial atmosphere in appearance, practice repeatedly, and pay attention to the scenery - people, cars, and trees. When taking the exam, it is a safe way to draw inferences from one case and respond to all changes without change.
Fourth, employment-related exams are just a formality, and almost all of them have an inside story. You did an internship there, and your performance was there, and the results of the exams were just a reference. Generally, large design institutes will arrange exams, and it is not new to see too much, so make all kinds of ideological preparations.
Finally, good luck!
That's how everybody comes through, and when you look back on the experience after a few years of work, you'll just laugh – but that's it.
-
There is no need to practice architectural performance.
Find a quick book and copy the flat section.
The leader asks you to stay, and in the end, they should have the final say.
-
(1) Tell the leader that you are going to take the exam! If they cancel the article (the hospital needs to pass the exam to be hired), then you must listen to your leaders! Leave the school alone! Because the ultimate purpose of your hunger is to go to work, not to take exams!!
2) If they do not cancel the case (the hospital needs to pass the examination to be hired). Leave the hospital alone and go back to school! Because in the current situation, if you want to go to work, the premise is that you must pass the exam!
3) If you do (2) and pass it, then they may deliberately not want you because you don't listen to them and stay there! Then what you need is: rejoice! There is no place to stay here, there is a place to stay here!!
-
No one will dislike you if you learn to draw by hand without delaying other work, but if you delay your work, it's hard to say.
-
Stand-alone test run and commissioning record of the equipment.
Description 1, equipment name: stand-alone test run and debugging equipment name.
2. Model and specification: the model and specification of the equipment for stand-alone test operation and commissioning.
3. The stand-alone trial operation and commissioning of the equipment shall comply with the following provisions (main control project):
A: There should be no abnormal vibration and sound when the pump is running, the sealing of the shell shall not leak, and the fastening connection part shall not be loose, which shall meet the design requirements.
b: After the mechanical grate is installed, the cold operation test should be done, and the continuous operation time should not be less than 8h.
c: During the test run of the fan, the temperature rise of the bearing shall comply with the following provisions:
The maximum temperature of the plain bearing shall not exceed 60 °C.
The maximum temperature of the rolling bearing shall not exceed 80 °C.
When the speed of the bearing radial single amplitude fan is less than 1000r min, it should not be exceeded; The fan speed is 1000 1450r min, which should not be exceeded.
4. The trial operation of other equipment should meet the specifications and design requirements; The noise is in accordance with the provisions of the product performance specification.
Look at the actual installation of the equipment in the project, and need to carry out stand-alone test operation and debugging, then fill in the information. For example, if a water pump is actually installed in the project, fill in the water pump.
-
IM412025 Conditions for commissioning, performance testing and acceptance of equipment.
The test run of the equipment includes the no-load test run of a single machine and the linkage test run of a complete set of equipment. The purpose of the trial operation is to comprehensively inspect the construction quality and find defects in order to make the final adjustment and repair. First the attached equipment, then the main machine, first the stand-alone, then the linkage, low-speed, then high-speed sequence.
1) No-load test operation of mechanical equipment.
The conditions that should be met before the no-load test run of the equipment:
For the trial operation of large, complex and precision equipment and production lines, a trial operation plan should be prepared.
Establish a trial operation organization.
Participants in the test should be familiar with the structure, performance and working principle of the equipment, and master the operating procedures and test run parties.
Table. The construction of the equipment and its ancillary devices was completed.
The pipeline construction is completed and the test and purge are qualified.
Lubrication, hydraulics, cooling, water, electricity, gas, steam, electrical, instrumentation, etc. are all qualified and have the conditions for trial operation.
The resources needed for commissioning are already available.
The surrounding environment of the device has been cleaned.
The commissioning of the equipment includes the following contents and steps:
Debugging of electrical and instrument operation control systems.
Commissioning of lubrication, hydraulic, pneumatic, steam, cooling and heating systems.
Joint commissioning of mechanical equipment and various systems.
No-load test run (should be carried out after the above three commissionings are qualified).
Joint commissioning of mechanical equipment and various systems.
The equipment and its lubrication, hydraulic, gas, steam, cooling, heating and electrical and control systems shall be individually commissioned and meet the requirements.
Joint debugging should be carried out as required, and should not be replaced by simulation methods.
Joint commissioning should start from the components to the components, stand-alone, the whole machine, and the complete set of equipment, according to the provisions of the equipment technical documents.
The operating procedure is carried out.
The no-load test operation of a single mechanical equipment shall be carried out after the joint commissioning is qualified and shall comply with the following provisions:
According to the scope and procedure of the no-load test specified in the technical documents of the equipment, the start of the test mechanism (among which the high-power unit shall not be started frequently), variable speed, reversing, stop, braking and safety interlocking, etc., are correct, sensitive and reliable, and the continuous operation time and continuous operation time should comply with the provisions of the equipment technical and water documents or the specifications.
During the no-load test operation, the following inspections should be carried out and should be recorded.
Equipment operation, bearing vibration, axial movement and temperature.
The running quality of the transmission.
The working condition and sealing quality of each auxiliary system such as hydraulic, lubrication, pneumatic (steam) and so on.
All kinds of electrical devices are in good condition, and all kinds of instruments are indicated correctly and work normally.
Noise testing should be carried out if necessary and should be in accordance with the regulations.
After the no-load test run, the aftermath should be done and the records of the test run should be sorted out.
The article is self-assured.
-
Brother, send me your email address via message, and I'll send you the form to fill in.
-
Brother, you go to the architecture bookstore and buy a book with the title of the book; Construction materials**Fill in the example, which has what you want.
-
I went to the bookstore and bought a book with examples of water and electricity information, and I had it all.
-
Simple information I will. It's just too hard.
-
Once upon a time, there was a young man who crossed the bridge and met an old man who was skilled in martial arts, and the old man promised the young man to teach him martial arts. Let the young men come to him at dawn tomorrow at the bridge. On the first day, the young man waited for the rooster to crow, but the old man said that you had not kept our agreement, and that it was already dawn.
So he told him to go home and come back the next day. The next day the young man's rooster had not yet crowed, but when he reached the bridge, it was already dawn, and the old man was very angry and asked him to come back on the third day. On the third day, the young man did not sleep at all, but stayed by the bridge, and finally saw the old man at dawn.
The old man was very happy and taught him martial arts.
-
The story of Lu Xun's observance of time:
Lu Xun studied in a private school when he was a child, and once, when his father was seriously ill, he went to the pawnshop and pharmacy early in the morning, and when he returned, the teacher had already started class. When the teacher saw that he was late, he said angrily, "Teenage students, still sleeping lazy, late for class."
Don't come next time you're late. ”
Lu Xun listened, nodded, did not make any excuse for himself, lowered his head and silently returned to his seat.
The next day, he came to school early, carved the word "morning" with a knife in the upper right corner of his desk, and secretly made a promise in his heart: he must get up early in the future and not be late again.
In the days that followed, his father's illness became more serious, and Lu Xun went to the pawnshop more frequently to sell things, and then went to the pharmacy to buy medicine, and a lot of work at home fell on Lu Xun's shoulders. He wakes up early every day before dawn to take care of the family, then goes to the pawnshop and the drugstore, and then hurries to the private school to attend classes. Although the burden on the family was heavy, he was never late.
-
Guan Yu is in Cao Ying's heart in Han, and he will protect Liu Bei's family after five passes and six passes!
Shuntuan Qianlu did not enter the house three times in order to control the water!
Yang Jiajiang, Yue Fei, Guo Ziyi and other patriotic generals shed their blood for the country!
Bao Zheng: The parents of the people are officials.
Lin Xiangru returned to Zhao completely.
Lian Po was guilty of pleading.
Lu You's poem "Shi'er".
Lin Zexu is non-smoking.
-
You help an old beggar who is over the age of six.
-
Mendeleev, who adhered to his theory of the periodic elements, ignored the ridicule and dissuasion of his mentors and other authoritative figures.
-
Li Shizhen did not copy the drug doctrine written by others, but personally explored and practiced, studied traditional Chinese medicine, and finally wrote the "Compendium of Materia Medica".
He may think that you are simple and easy to deceive, such a person does not like you at all at the moment, he may think that you really like him, so he will let him take what he wants, just want to satisfy himself. >>>More
If you want to go with me, you have to go, you go, keep going.
1.Zhuo Yajun --Lolita.
2.Lee Hyori --anyclub >>>More
Hehe, what you see is a topic, talk about the weather in recent days, and talk about whether the layout of the park is reasonable, or unreasonable. Or say that there are more or less people in the park, analyze the reason. Or say there's a child, or a couple doing something intimate or cute. >>>More
How to choose an auspicious wedding day in China.
1. Choose to run the year and run the month. Chinese attach great importance to the selection of marriage dates, and pay great attention to the theory of "Runyue" and "Runnian", that is, every two or three years, there will be a Runnian, that is, there are two "Lichun" and one "Runyue" in that year. Choose an auspicious day for marriage, preferably in a year with a running moon. >>>More