How to build a tower crane monitoring system? How to adjust the visual monitoring of the tower crane

Updated on technology 2024-05-13
13 answers
  1. Anonymous users2024-02-10

    1. The tower crane is transported into the construction site one by one. The first thing to do is a simple splicing.

    2. Then connect the spliced ones together.

    3. At this time, the focus is to install the counterweight behind first, generally three counterweights are installed first, and the two counterweights behind the installation are completed by the front tower arm, and the counterweight is hoisted up with a crane.

    4. Then the height is not enough to increase the height, hang a section to pass down, and the appropriate height of the raised straight road is one section at a time.

    The tower crane remote monitoring and management system is mainly to monitor and control all tower cranes on a construction site. Monitoring mainly refers to detecting whether each tower crane is sending its own position data; Control mainly refers to the addition, modification, transmission and reception of static data of the tower crane, the modification and sending of system parameters, and the calibration of the radius lifting height rotation. Described system is tower crane remote monitoring system, only plays the role of safety protection to tower crane, is mainly applied to tower crane remote real-time monitoring, remote transmission tower crane working condition data, avoids safety accidents caused by the operator's negligence or judgment error, can greatly guarantee the safe use of tower crane.

  2. Anonymous users2024-02-09

    Do you want to monitor the status of the tower crane operation, if so, you can consult Hangzhou Pinming Security Control Information Technology, specializing in tower crane safety monitoring system, which can display the real-time operation data of the tower crane in real time, including lifting weight, luffing, rotation, height and pre-alarm information, and can be monitored through the network platform. **:4001 858 580

  3. Anonymous users2024-02-08

    You can take a look at the Yitang tower crane monitoring system, using MD-610G GPS DTU to connect the front black box to realize the upload of black box and GPS positioning information, and you can log in to the server directly through the web to see the lifting weight, wind speed, torque and other information recorded by the black box in real time.

  4. Anonymous users2024-02-07

    Installed on the tower crane platform, the tower crane is raised, and the monitoring is raised together, of course, we must first figure out how many floors of the house are repaired, so as to prepare the monitoring line. If it is installed crookedly in the operation room, I am afraid that there will be no driver.

  5. Anonymous users2024-02-06

    It is recommended that when you buy a monitoring facility, the seller should tell you.

  6. Anonymous users2024-02-05

    Whether you are monitoring the tower crane or installing it on the tower crane, you didn't make it clear.

  7. Anonymous users2024-02-04

    Construction sites, especially tower cranes, are not easy to install because they are too high from the ground, and tower cranes will gradually increase in height with the height of floors, so it is easier to use network cameras to meet the needs of the site. Scattered.

    The construction site is dusty, the vibration is violent, the use of general cameras can not meet this harsh environment, usually we recommend that customers use Kaiwei KV-N8806Q-H network high-speed dome camera, built-in imported Sony core, transmission configuration wireless bridge directly transmitted to the central control room, so that the monitoring is more convenient and fast.

    Because with the rapid development of science and technology, the first signal is digitally compressed and transmitted on the Internet through broadband, which can realize the monitoring function of remote and large range. The application of this function to the safety management of the construction site is bound to greatly improve the management efficiency and enhance the level of supervision.

    The operation of the monitoring system will enable the construction company to leap onto the new management platform, strengthen the supervision force, and grasp the on-site construction dynamics in a timely and effective manner.

  8. Anonymous users2024-02-03

    Hello pro is very happy for you: the adjustment steps of the visual monitoring of the tower crane hook are as follows:1

    Check whether the monitoring hardware is normal and check whether the network connection is unblocked. 2.Open the monitoring software, enter the device and password to log in to the system.

    3.Click on the tower crane hook monitoring equipment in the equipment list to enter the equipment screen. 4.

    Adjust the size and position of the monitoring screen according to actual needs, and enlarge or reduce it by using the mouse wheel. 5.Click the settings button in the monitoring screen to enter the settings interface.

    6.In the settings interface, you can adjust the brightness, contrast, saturation and other parameters of the monitored image, as well as adjust the image quality-related settings such as the bitrate. 7.

    In the alarm setting option of the setting interface, you can set the relevant parameters such as the alarm type and alarm sound of the monitoring screen. 8.After the adjustment is completed, the troublemaker clicks the save button to save the settings and preview whether the monitoring screen meets the needs.

    9.If desired, the settings can be saved as presets and recalled directly for subsequent use. I hope it can help you to stop the bend and judge the family.

  9. Anonymous users2024-02-02

    1. Connect the webcam to the power supply and make it in a state of waiting for the mold stool to be connected. 2. **The webcam corresponds to the PC version and mobile phone version of the application, and install them separately. 3. Connect the webcam to the computer, there are two ways to connect, one is to directly verify the wifi user name code and password, to achieve the connection, and the other is to use the webcam to scan the application on the stupid brigade to achieve the connection.

  10. Anonymous users2024-02-01

    Summary. The debugging of the visual monitoring of the tower crane hook needs to be carried out according to the specific monitoring equipment and software. In general, the following steps need to be followed:

    1.Confirm whether the monitoring device and software are installed correctly: First, you need to confirm whether the monitoring device and software are installed correctly, whether the device is connected properly, and whether the software can operate normally.

    2.Enter the monitoring interface: open the monitoring software, enter the monitoring interface, and view the real-time picture and monitoring data of the hook.

    4.Test monitoring function: Perform some simple tests, such as moving the hook, adjusting the hook height, rotating the hook, etc., to observe whether the monitoring screen can reflect the status of the hook in real time.

    It should be noted that the debugging of the visual monitoring of the tower crane hook needs to be carried out by professionals to ensure the normal operation of the monitoring equipment and software, and at the same time ensure the safe use of the hook.

    The debugging of the visual monitoring of the tower crane hook needs to be carried out according to the specific monitoring equipment and software. In general, the following steps need to be followed:1

    Confirm whether the monitoring device and software are installed correctly: First of all, you need to confirm whether the monitoring device and software are installed correctly, whether the device is connected properly, and whether the software can operate normally. 2.

    Enter the monitoring interface: Open the monitoring software, Dongshi enters the monitoring interface, and view the real-time picture and monitoring data of the hook. 3.

    Test monitoring function: Perform some simple tests, such as moving the hook, adjusting the hook height, rotating the hook, etc., to observe whether the monitoring screen can reflect the status of the hook in real time. It should be noted that the debugging of the visual monitoring of the tower crane hook needs to be carried out by professionals to ensure the normal operation of the monitoring equipment and software, and at the same time ensure the safe use of the hook.

    The main thing is the multiplier.

    The debugging of the visual monitoring of the tower crane hook needs to be carried out according to the specific monitoring equipment and software. If you need to adjust the multiple of the monitoring painting surface, you can follow the steps below:1

    Enter the monitoring interface: open the monitoring software, enter the monitoring interface, and view the real-time picture and monitoring data of the hook. 2.

    Find the multiplier adjustment option: In the monitoring interface, find the multiplier adjustment option, which is generally displayed as "zoom" or "zoom in". 3.

    Adjust the multiplier: Adjust the multiplier size as needed, which can be done through the mouse wheel or the multiplier adjustment button in the software. 4.

    Test the monitoring function: carry out some tests of simple dressing and dismantling, such as moving the hook, adjusting the height of the hook, rotating the hook, etc., to observe whether the monitoring screen can reflect the status of the hook in real time. It should be noted that the debugging of the visual monitoring of the tower crane hook needs to be carried out by professionals to ensure the normal operation of the monitoring equipment and software, and at the same time to ensure the safety of the hook.

  11. Anonymous users2024-01-31

    You are in Shaoxing, there are basically tea brands over there, you can find a peer to understand, the use is not bad

  12. Anonymous users2024-01-30

    Oh, it's harder to use wireless.

  13. Anonymous users2024-01-29

    Wireless omnidirectional antenna plus my wang: Taihang farm home.

Related questions
9 answers2024-05-13

The lifting of the tower crane is realized by a set of jacking devices. This set of jacking device mainly includes jacking sleeve, jacking beam and hanging shoe, hydraulic system, introduction trolley and introduction beam and other components. The sleeve frame is an important part of the tower crane jacking. >>>More

7 answers2024-05-13

1. The top of the tower cap should be equipped with a lightning rod. >>>More

13 answers2024-05-13

3) Thread the wire rope.

The winch wire rope is fixed at the head of the crane through the cab to the pulley group of the tower cap, and the total rope length and the distance between the two pulley groups should be calculated and determined. >>>More

7 answers2024-05-13

How is a tower crane installed on a construction site? Deceptively simple but intricate!

21 answers2024-05-13

It's simple, do you pay for it, I'll do it for you.