How to correctly accept the quality of decoration materials within one minute?

Updated on home 2024-05-15
6 answers
  1. Anonymous users2024-02-10

    Don't be in a hurry to accept the decoration materials, take your time, after all, this involves the quality of the later stage.

  2. Anonymous users2024-02-09

    When the owner sees the new house that has been renovated, or the old house has been renovated, you can imagine how excited and excited he is. But at this time, it is important to keep a clear head, conscientiously do a good job in the acceptance of decoration quality, and achieve the maximum effect of house decoration.

    Then, how to do a good job in the acceptance of decoration quality is also a major event in front of the owner. Here is a brief introduction to the standards and precautions for decoration quality acceptance, I hope to share and get help. The standard of decoration quality acceptance is common to some things, and some are just because of the house, which everyone should remember.

    There are many decoration acceptance standards, and the relevant departments have corresponding guiding documents to make normative guidance on which aspects of acceptance. The basic provisions, plastering engineering, doors and windows engineering, ceiling engineering, lightweight partition wall engineering, decorative panel (brick) engineering and sanitary appliance engineering, indoor air quality, quality acceptance and judgment, decoration quality assurance and other standards have been clarified, so that the decoration quality acceptance can be seen and touched, and there are rules to follow.

    Matters needing attention to in the quality acceptance of decoration Qiaoma's: 1. Before entering the venue, see whether the demolition and renovation project complies with the provisions of the contract, whether there are potential safety hazards, whether the wall treatment is clean and consistent with the prior agreement. 2. In the acceptance of decoration quality, those "invisible" concealed projects are the focus of acceptance.

    Since concealed works are usually covered up before the end of the project, it is very troublesome to have problems in the later stage. 3. The actual water supply test should be carried out for the acceptance of the water circuit to check whether all the transformation lines are smooth, whether there is leakage and water seepage, and whether the layout is reasonable to ensure safety and no hidden dangers. 4. Doors and windows belong to hard decoration, and many owners only find that there is a quality problem after living in, and then rework may damage some of the surrounding soft decoration, which is more troublesome.

    Therefore, special attention should be paid to the acceptance of decoration quality. 5. After completion, the owner should check the installation of sanitary ware and hanging kitchen in accordance with the prior agreement, whether the paint on the wall and top surface is uniform, whether the position of the panel and lamps installed by the electrician is appropriate, and whether the line connection is correct.

    You can get it for free

  3. Anonymous users2024-02-08

    1. Small quality defects.

    If it is some small quality defects, such as a relatively small range of hollow drums, lack of fittings in doors and windows, inflexible opening, etc., the owner of these problems can directly report to the property or developer for processing, and the property or developer will arrange special construction personnel to carry out the maintenance work of the problem.

    2. Relatively large quality problems.

    Relatively large quality problems refer to those that directly lead to the owner's inability to complete the move-in, such as water leakage in the house. If the owner has not completed the formalities of receiving the house, then the owner can request to refuse to accept the house in accordance with the law, and then check in after the developer has rectified all the quality problems.

    In addition, the developer may also be required to bear the liability for breach of contract caused by the delay in delivery according to the relevant provisions of the contract; If the landlord has already completed the check-in process and discovers these problems after moving in, the landlord has the right to ask the developer to bear the losses during the maintenance period to protect his own lease rights.

    3. Serious safety structure problems.

    The third type of problem is the cracks and exposed ribs in the house, at which time the owner has the right to ask the developer to find out the cause as soon as possible, and request the issuance of a report from the national professional appraisal department to prove whether there are serious safety structural problems in the house.

    If there is no safety structure problem, the developer can be required to carry out routine maintenance and rectification, and the loss during the rectification period shall be borne by the developer; If it is confirmed that there are indeed serious safety structural problems with the house, then the owner has the right to request to move out and the developer will be liable for the breach of contract.

    If the developer refuses to move out, then the owner has the right to request the developer to issue a design rectification plan from the design department, strengthen and rectify the house, ensure the safe structure of the house, and the developer shall be responsible for the rectification losses during the period.

    1. What are the remedial measures taken by the buyer if the house acceptance is unqualified?

    1. Actual performance.

    If there is a problem with the quality of the foundation work and the main structure of the house purchased by the buyer, if it can be repaired through reinforcement and other means, and the safety of the building is ensured, the buyer may request the seller to perform its obligations in accordance with the provisions of the law and the contents of the contract.

    Actual performance is a basic principle of contract performance in China, and it is a major remedy that can be taken by the other party after a party breaches the contract. However, it is not appropriate to take such remedial measures in consideration of whether the breaching party can continue to perform and the reasonableness of its continued performance, and if the breaching party is truly unable to continue to perform or will pay a greater price if it continues to perform.

    2. Termination of the contract.

    If it is difficult to solve the problem of the quality of the foundation works and the main structure of the house by means of restoration, the buyer may request to terminate the contract. Rescission is a more stringent measure that generally prohibits the parties from arbitrarily rescinding a contract without any statutory or contractual basis.

    3. Liquidated damages and damages.

    If the house delivered by the seller is not up to standard, whether the buyer requests actual performance or rescission of the contract, it does not affect the request for the seller to pay liquidated damages and bear the liability for damages.

  4. Anonymous users2024-02-07

    1. Toilet acceptance criteria.

    1] Open the angle valve and check whether there is leakage at the connecting port.

    2] Check whether the opening and closing of the automatic valve in the box is flexible.

    3] Check the distance between the water level height and the overflow pipe after the water is filled.

    4] Press both sides of the toilet with both hands and shake it slightly vigorously to see if it is stable.

    5] Put the toilet paper in a ball, open the water hole of the board for flushing observation, and check whether there is leakage in each interface.

    6] Continuous flushing and discharge shall not be less than three times, if the discharge is smooth, and there is no leakage at each interface, it is qualified.

    Second, the toilet acceptance precautions.

    Before choosing a toilet, you should first determine the size of the toilet drain, and the distance between the drain and the wall is standard in millimeters.

    According to the size, you can choose your favorite toilet style, generally choose water-saving type (3-6L), and you should see the model and origin clearly when purchasing.

    Before installing the toilet, make sure that the accessories and instructions are complete, and carefully read the instructions to prevent stealing beams and changing columns and cutting corners.

  5. Anonymous users2024-02-06

    Decoration material acceptance] The acceptance of decoration materials is related to the problem of later decoration, and there are often some disputes about decoration materials, which are mostly because the early acceptance project is not done well, and the hidden dangers left. This can easily affect the progress and quality of construction, so decoration consumers must do a good job in the acceptance of decoration materials to ensure the normal construction of home rough decoration.

    1. Notify the other party of the contract of the time for material acceptance

    After the material is purchased, the purchaser needs to notify the other party to the contract to prepare for the acceptance of the material. And this acceptance is best scheduled to take place as soon as the material enters the site. Therefore, it is very important to agree on the acceptance time.

    In order to avoid that when the materials enter the site, the other party has no time to accept the materials, which affects the construction progress.

    2. The acceptance personnel specified in the contract must be present during the material acceptance

    Neither people in the home improvement industry nor consumers seem to have the kind of awareness that rises to a legal point of view about contracts. However, the home improvement contract itself is a legal document, and if it is not taken seriously, there may be unnecessary trouble.

    3. The acceptance procedure must be strict

    The acceptor shall carry out the necessary inspections for each material agreement specified in the contract, such as material quality, material specifications, and material quantity.

    4. The acceptor specified in the contract shall sign the acceptance form

    If the inspection results and the materials are qualified, the acceptor should sign the material acceptance form. This is a more complete process. Because, in one case, the owner accepted the materials when they entered the site, but did not perform the necessary formalities at that time.

    Afterwards, the owner repented and did not admit the results of his acceptance. However, because the other party has no evidence in hand, he is also very helpless about such a result.

    Also of interest to those who read this article

    A complete list of decoration materials.

    How to choose house decoration materials.

    You can get it for free

  6. Anonymous users2024-02-05

    What points should be paid attention to when decorating and demolishing and renovating?

    1. Check whether the beams and columns in the room have been altered.

    When the demolition and modification is completed and accepted, it is necessary to pay attention to see whether the beams and columns of the lower room have been changed, which is used to support the upper floor.

    2. Check whether the steel bars of the wall have moved.

    It should be noted that the steel bars in the wall cannot be moved when demolishing and renovating, and special attention should be paid to the buried pipes, as the destruction of the steel bars will affect the wall and bearing capacity, and will leave potential safety hazards.

    3. The low wall next to the balcony cannot be demolished.

    The low wall next to the balcony cannot be removed or changed. Generally, there is a door and a window on the wall between the room and the balcony, these doors and windows can be removed, but the wall below the window can not be removed, because this wall is a "counterweight wall", it plays the role of provoking the balcony like a weighing stone, if the wall is removed, it will make the bearing capacity of the balcony decrease, causing the balcony to fall.

    4. Check whether there is any illegal window opening.

    For buildings with "brick and concrete" structures, all prefabricated panel walls cannot be removed, and doors and windows cannot be opened. In particular, brick bridges with a thickness of more than 24 cm are generally load-bearing walls and cannot be easily dismantled and reconstructed. The load-bearing wall bears the weight of the building and maintains the balance of forces throughout the house structure.

    If the load-bearing wall is removed and the balance of this force is disrupted, the consequences may be heavy and life-threatening for no one owner.

    In home decoration, in addition to the load-bearing wall can never be demolished, the light wall may not be demolished. Some lightweight walls also bear part of the weight of the house. For example, a light wall underneath a beam cannot be removed because it also bears part of the weight of the house.

    If it is demolished, it will also damage the structure of the house.

    Not all walls can not be changed to open windows, like some light walls and hollow slabs that are completely used as partition walls can be removed, and doors and windows can also be opened, because the partition wall does not bear any pressure at all, and the value of existence is to separate the space, and it will not have any impact on the structure of the house.

    5. Check whether the door frame has been changed.

    Many people will dislike the original door safety factor or aesthetics is not high and other problems want to change the door, it is okay to change the door, but it should be noted that the door messy frame is best not to change, because the door frame is embedded in the concrete, blind changes will destroy the building structure, will reduce the safety factor of the door.

Related questions
4 answers2024-05-15

Go to the post office and ask for it, you can order it by mail.

17 answers2024-05-15

One minute for normal people: 62--75 One minute for athletes: 50-60

26 answers2024-05-15

It has compiled several commonly used medical secrets to teach you to relieve pain immediately! It is divided into two main parts: >>>More

8 answers2024-05-15

6.The colorful butterflies are full of color, such as the heavy moon butterfly, the brown vein golden spotted butterfly, etc., especially the fluorescent winged butterfly, which is sometimes golden yellow, sometimes emerald green, and sometimes from purple to blue in the sun. Scientists have been able to study the colors of butterflies for military defense. >>>More

11 answers2024-05-15

One day the butcher bought two sheep, one large and one small, but when the butcher was about to kill the old sheep, he found that the knife was missing, and finally found that the knife was hidden under the belly of the lamb, just to protect the big sheep, and later learned that the big sheep was its mother.