If the putty packaging on the market is generally 20 kg, each package can be completed 8-12 square meters of plastering into a living area (twice), depending on the flatness of the wall, the actual packaging capacity of the putty shrinks, the thickness of the plastering or the increase in the number of times will be quite different! If you calculate the survival of two times according to the normal range, each pack is 10 square meters, and the survival of three times is 7 square meters! Taking the total painting area of 200 square meters as an example, it takes 20 packs for two times and 28-30 packs for three times!
According to this: the amount of putty per square meter is about 2 3 kg per square meter.
As for latex paint, the theoretical area of a single coating is about 12 square meters, and each kilogram is between 5 and 6 square meters according to two times, and about 4 square meters for three times; This is a reference value, depending on the flatness (roughness) of the wall, the actual amount will increase or decrease slightly, up and down about 20%!
-
Purpose of scraping putty for interior decoration: 1. Close the rough surface of the base layer. 2. Find a plane.
3. Delicate wall surface to achieve a soft texture effect. There is no specific thickness standard for scraping putty in decoration. Based on the requirements of the thickness of the material itself, generally speaking, it is more reasonable, too thin, easy to expose the bottom during sanding, too thick, and easy to collapse and crack during the drying process.
It will even cause the hollow drum and the putty layer to fall off, so in the leveling process, the place that is too thick needs to be filled with plaster ash before scraping the putty.
-
Since the developer deducts the warranty money from the general contractor, the general contractor will also deduct your warranty money. Generally five to ten percent.
-
It varies from person to person, and is determined through negotiation with Party A.
-
No, just polish it one last time. Putty usually needs to be scraped 2-3 times, and each scrape must wait for the last time to dry thoroughly before it can be carried out, and the putty can be sanded after the last time it is dry, and finally it can be brushed with latex paint.
-
It is recommended to ventilate for about three months before moving in, you can put some activated carbon to adsorb formaldehyde indoors, and plant some plants that can adsorb formaldehyde. Hope!
-
At least three days, you can live when it's dry, but it's a little bit of a taste, and you need to put it away.
-
Many designers promote the idea of making everything simple, and simple equals convenient. This minimalist trend just caters to the psychology of many young people, so the bathroom equipment has become direct and "simple". Yatao Sanitary Ware continues to explore the tendency of making bathroom products artistic, so that people can not only produce the happiness of cleaning the body in the bathing space, but also experience the visual impact of beauty.
-
Scraping putty is one of the methods of interior wall decoration, it refers to the way of filling or overall treatment, removing the uneven part of the surface of the base layer, keeping the wall smooth and smooth, scraping putty is the most important step in the treatment of the base layer, so it has more precautions. It is very important to scrape the putty before painting the wall, which generally takes 1-3 times, and the putty must be dried before scraping again, which is very important. After scraping putty, it is necessary to avoid direct cold wind, which will cause the wall to appear to be blown dry, but in fact the moisture is locked in the wall.
If you proceed to the next step of construction, wait until the heating starts in winter, as the indoor temperature rises, the moisture of the original undried material begins to evaporate, and the wall is likely to crack and other problems. Moreover, after scraping the putty, it is necessary to pay attention to avoid humidity in the room, and moisture-proof agents can be added appropriately to avoid mold or fall off of the putty powder.
-
1. Enter, tear down the wall, build the wall.
2. Bathroom, kitchen floor for 24-hour closed water test (the developer needs to complete this task).
3. Drill the trunking, hydropower transformation and acceptance.
4. Concealed hydropower renovation project of buried trunking, and waterproof engineering began to be done without leakage in the closed water experiment.
5. Bathroom and kitchen are attached to the wall magnetic sheet.
6. Carpentry entry, hanging ceiling, gypsum corners.
7. Cover the door and the window. Make a wooden cabinet frame.
8. Synchronous production of various wooden doors, modeling doors and flat pressing.
9. The wooden panel is brushed with dustproof paint (clear oil).
10. The window sill marble countertop is leveled and laid.
11. Wood veneer paste, line production and fine installation.
12. Wall base treatment, grinding and leveling.
13, household goods, stickers (protective edges) are pasted at the seams of the door.
14. The wall oil ici is at least three times.
15. Furniture paint into the field, nail holes, paint.
16. Treat corners, lay floor tiles, solid wood or laminate wood flooring, waterproof marble strips, baseboards.
17. Installation and debugging of lamps, sanitary ware, handles, and door locks.
18. Clean up and sanitize, repair the floor tiles, and withdraw from the site.
19. Preliminary acceptance within the decoration company.
20。The three-party appointment time is formally accepted and delivered to the owner.
-
In the decoration, whether to stick the floor tiles or scrape putty first, in fact, this does not necessarily depend on the actual situation. Under normal circumstances, simple decoration is to first use mortar ** to make floor tiles, and then it is angular putty. In addition, the key stains the floor, and a layer of cardboard shell can be laid on the ground, so that the tiles on the ground can be well protected.
-
The first brick is pasted, and the putty scraping is the last process in home improvement.
The carpentry is done, the water and electricity are done, and the bricks are laid.
-
The decoration of a new house is generally done after dealing with the water and electricity problems, and the tiles must be laid first, which is the basis of the entire decoration project. The reason is that the height of the ground is determined first, and then the interior door can be installed at this height; In addition, to build tiles, you need to pile up a lot of cement, sand and tiles indoors, and you also need to mix mortar, which is easy to pollute the wall. So the tiles are generally laid first.
After the floor tiles are laid, the next process is to install doors and windows and make the ceiling of the living room, as well as the decoration of the kitchen and bathroom, make cabinets, install range hoods, sanitary ware, etc. Then it is to deal with the wall problem, first use putty to scrape and polish flat, and finally the process of painting latex paint or wallpaper, and basically the decoration work is over at this step.
-
Process flow:
First, the protection of the finished product, mainly plastic window cracks and radiators, in case the garbage caused by the shovel wall skin falls in, it is not easy to clean up.
Second, shovel wall skin, you can do a slight moisturizing experiment, check whether the adhesion of the original coating is qualified, carefully observe whether there are small cracks, the vast majority of the wall after inspection on one word: shovel!
3. The wall is closed with 801 glue again, the purpose is to enhance the bonding force between the putty and the wall. If you encounter an old house, you can brush the interface agent to increase the insurance factor.
Fourth, the yin and yang angle treatment, with gypsum powder and white latex to prepare gypsum putty, all straightened. In general, it is recommended to set plaster lines.
Fifth, the wall leveling, first check whether the wall has a "hollow drum" (can be struck, listen to the sound to judge), and then use a slightly longer aluminum alloy ruler to check the top and the recess of the wall, make marks, and flatten with gypsum putty.
6. Formal scraping putty, after the gypsum putty is dry, scrape and apply the putty three times (each time must be thoroughly dried). There are two ways to test whether the putty is dry: first, observe whether the color is consistent; The second is to see if there is a phenomenon of "sticking sandpaper" when sanding.
7. Strong light oblique grinding, 360 sandpaper can be used.
8. Paint one, after the wall floating ash is cleaned, you can paint the wall paint for the first time (the first time can be adjusted diluted, first.
2 or 3 times slightly thicker).
9. Supplementation, strong light oblique light, supplementation, and secondary polishing. The wall that looks good, once the wall paint is brushed, the small defects are immediately revealed, so it must be brushed once, and then repaired and polished again to have a good effect.
Professional oilman scrapes putty and brushes latex paint.
10. Paint two, check it out, and paint the first.
Two or three coats of wall paint.
Summary. General Provisions 1 0 1 In order to implement the national technical and economic policies, promote sustainable development, and standardize the basic functions and performance requirements of housing, this specification is formulated in accordance with relevant laws and regulations. 1 0 2 This specification applies to the construction, use and maintenance of urban dwellings. >>>More
Yes? To be honest, you're dangerous enough here, at least the ones for structural acceptance are indispensable. In the later stage of decoration, the certificate and inspection list of all materials are kept, the airtightness test is kept, and the others are nothing.
It can undertake the general contracting project of housing construction including curtain wall, and he can subcontract to a qualified curtain wall company. >>>More
That's a good question.
How should the area of the house be calculated?