How to sort out the data of housing construction projects, how to sort out the construction data?

Updated on society 2024-04-16
9 answers
  1. Anonymous users2024-02-07

    Yes? To be honest, you're dangerous enough here, at least the ones for structural acceptance are indispensable. In the later stage of decoration, the certificate and inspection list of all materials are kept, the airtightness test is kept, and the others are nothing.

  2. Anonymous users2024-02-06

    Do you do Party A's information or construction unit information?

  3. Anonymous users2024-02-05

    The construction data should follow the progress of the project, each process needs to have relevant information, each step has specific requirements, the specific is very cumbersome, a few words are not clear. If you do related work, you will understand everything with a project.

  4. Anonymous users2024-02-04

    Each unit has data specifications to follow, and there are requirements for file management to hand over the data, communicate and learn more with senior data personnel, and conduct special training and evidence collection for data personnel.

  5. Anonymous users2024-02-03

    There are many reference books for the collation of construction materials, such as examples of construction project completion data. In 2008, Shanghai promulgated the Technical Specifications for the Preparation of Construction Project (Engineering) Completion Archives (DG TJ08-2046-2008), which is the basis document for the collection of engineering archives in various districts. The construction unit shall, in accordance with the requirements of the construction unit and the provisions of national and local norms, regulations and standards, sort out the content of the completed project tasks, and compile, collect, classify and sort out the project data.

  6. Anonymous users2024-02-02

    The whole book mainly elaborates on the basic knowledge of engineering data management, engineering data archiving management, infrastructure document management, construction project management and technical data, construction materials information, construction records, construction quality acceptance records and construction engineering inspection batch quality acceptance records and construction engineering inspection batch quality acceptance records are elaborated in detail, and the book also fills in the engineering data ** demonstratively to facilitate the use of technical personnel.

    The "One Guide to Construction Engineering Data Personnel" can be used and referred to by construction engineering data knitting personnel, as well as construction engineering history supervision personnel, technical personnel and quality supervision personnel.

  7. Anonymous users2024-02-01

    frame structured.

    Submit for inspection from the foundation - start the site in advance of the materials to be inspected, such as steel bar (the end of the soil steel bar inspection tonnage to be enough), cement, cement mortar mixing ratio (to see how many grades the wall on the drawings), etc., the site has to be tested, sand and gravel backfill compactness detection (to see whether the drawings have sand and gravel backfill), some Party A will do termite control, concrete detection, steel flash welding, pressure welding, which is available in each layer. It should be noted that the cement should be re-inspected once every three months (from the start of your project to the end of the secondary structure).

  8. Anonymous users2024-01-31

    At present, there are all kinds of data software on the market, which is very complete.

  9. Anonymous users2024-01-30

    Hello, take a look at the books and archiving specifications in terms of materials.

Related questions
6 answers2024-04-16

First, first enter the venue to prepare:

1. Project commencement report, construction permit, construction organization design, materials and equipment for review. >>>More

12 answers2024-04-16

Step 1: Prepare a business license.

Before handling the construction qualification, you need to register the company and obtain the business license before you can log in to the Construction Committee** and register as an enterprise user. >>>More

7 answers2024-04-16

In the case of a part-time construction site, it is generally charged according to the completed area, and the specific amount of money per square depends on the area.

5 answers2024-04-16

The quality standards of construction projects include: meeting the quality objectives and quality requirements of the project; Comply with the agreed requirements of the signed contract and supplementary agreement; Meet the requirements of design and construction drawings and technical documents; Comply with various norms and standards and quality management rules and regulations of the department; Pass acceptance. >>>More

8 answers2024-04-16

Sign up for free on the "Tiangong Network".