-
There is no internet speed and there is no way to email you.
Just send one that is not typeset.
Change it yourself.
Construction Journal.
TJ — Thursday, July 2, 012009.
Weather (sunny and rainy, wind, maximum temperature in summer).
Sunny in the morning, cloudy in the afternoon on 32, light rain on the night on 33, and records of production conditions (engineering parts, mechanical operations, team injuries, production problems, etc.).
1. The excavator cooperates with the 51-35 axis earthwork excavation in Area B.
2. 27-axis to 34-axis blasting operation in C3 area, 4 Chinese workers and 9 workers.
3. The first floor of the A3 area stands steel bar binding, 2 Chinese workers, 7 workers.
Fourth, the three-layer frame column and column reinforcement in the A3 area are connected and tied, with 1 Chinese worker and 3 workers.
5. Binding of foundation reinforcement in C2 area, 2 Chinese workers and 6 workers.
6. Anti-riot ditch construction in Area D, 4 Chinese workers and 6 workers.
7. Masonry of the first floor and two structures in the A2 area, with 2 Chinese workers and 3 workers.
8. Masonry of two floors and two structures in A2 area, 2 Chinese workers and 3 workers.
9. Masonry of the second floor and two structures in the A3 area, 6 Chinese workers and 9 workers.
10. Production of grid 8 area tire frame, 24 Chinese workers.
11. Installation and welding of bulk grid in A1 area, 10 Chinese workers, 12 finishing network components, 4 Chinese workers.
13. Grinding grid rods, 1 Chinese worker, 2 local workers.
14. Installation of horse railings, 4 Chinese workers.
15. 2 Chinese workers, 2 local workers, rainwater buried pipe installation in Southwest District.
16. 1 Chinese worker, 1 local worker, bridge bracket production in Southwest District.
17. 1 Chinese worker, 1 local worker, Northwest District stringing.
18. There are 2 Chinese workers and 6 workers in the power generation and distribution room.
Records of technical quality and safety work.
technical quality and safety activities, inspection, assessment and acceptance, etc.).
Filled in by:
-
I don't know if you have a construction log from the engineering department, thank you.
-
The construction diary is a true and comprehensive record of the construction organization and management, construction technology and other related construction activities and changes in the site conditions during the entire construction stage of the project, and it is also the basic information for dealing with construction problems and summarizing construction management experience. Filling in the construction log is a must-do job for the person in charge of the construction site every day. The construction log has a very important position in the entire project file, so how to remember and how to keep the construction log is a key basic work in the construction of the project.
-
Diary diary, keep it every day.
-
The construction diary shall be recorded by the person in charge of the project day by day from the beginning of the construction of the project to the completion of the project, and the content of the record must be continuous and complete.
The construction diary should be recorded in the unit project, and for different unit projects of the same construction unit, it can also be recorded in the same book, but the content must be recorded separately according to the number.
The content of the construction log, which mainly contains the following parts:
1. Date and weather.
2. Engineering parts and construction teams.
3. Records of construction activities:
1) The start and end dates of the construction of the main divisions and sub-projects:
2) Records of special circumstances in the construction stage (power outage, water outage, work stoppage, nest work, etc.) and indicate the reasons
3) Quality, safety, equipment accidents (or near misses) of the causes of occurrence, treatment opinions and treatment methods of the record, after the treatment of the hidden acceptance of the conclusion record:
4) The record of the design unit solving the problem on the spot (or the design change should be completed by the design unit to change the design contact form);
5) Record of changing the construction method or taking special measures and construction methods in an emergency: If there is a change to the original design office, the design change notice and other contents and circumstances should be supplemented with the problem under the consent of the design.
6) Carry out technical disclosure, technical review and concealed engineering acceptance and other activities of the summary record;
7) The decision or suggestion made by the relevant leaders or departments on the project shall be determined only by the design unit if it involves structural changes;
8) Others (mortar test block number, concrete test block number, etc.).
4. Check the content:
1) Quality inspection: quality inspection and processing records of concrete pouring and forming, steel bar installation and welding, masonry, formwork installation and dismantling, health care, etc.; concrete curing records, mortar, concrete admixture dosage; Causes and treatment methods of quality accidents, and verification of the effect of quality accident treatment;
2) Safety inspection and potential safety hazard treatment (correction);
3) Other inspections, such as civilized construction and site appearance management.
5. Miscellaneous.
1) Design change, technical approval notice and implementation status;
2) Construction task disclosure, technical disclosure, and safety technology disclosure;
3) Power outages, water outages, and work stoppages;
4) Construction machinery failure and treatment;
5) Construction preparation and measure implementation in the winter rainy season;
6) The promotion and use of special measures and construction methods, new technologies and new materials involved in construction.
-
After entering the field, to put it bluntly, it should start when the slotting is released. Personally, I think that trying to seek truth from facts is an important construction material after all. If you have concerns about the contract, you can prepare for it twice.
-
You can start from the day you are ready to enter the construction site, including what preparations have been made. It can also be based on the start time of the contract; In addition, the recording starts according to the actual time of arrival at the site.
-
The requirements are as follows: 1. The header part has: numbering; daylight; Nighttime; weather conditions; Wind power; Maximum minimum temperature; Remark; 2 The record part has:
Production records (including construction parts, construction contents, mechanical operations, team work, production problems, etc.); Technical quality and safety work records (including technical quality and safety activities, inspection, evaluation and acceptance, technical quality and safety issues, etc.).3. Recorder; Date. Hope to adopt, thank you.
-
From the date of entry of the construction unit (under normal circumstances: the date of commencement of construction can be counted after entering the site).
-
According to the contract commencement date to completion date.
-
Write from the start of work.
The start time is defined as follows:
Commencement of construction: The contractor commences construction work from the first date of occupation of the construction site and shall complete the work on or before the completion date.
That is, the first project site occupation date is the official implementation time of the contract between the two parties. For the commencement date, i.e., the date on which the construction actually commences, the contractor has the right to make its own plan and implement it according to the approval of the engineer; The engineer also has the right to review or set a date for the commencement of work. It indicates that the date of actual commencement of construction is all the prerequisites for both parties to confirm that the actual commencement of construction has been met.
The time of commencement is a legal concept that indicates the start date of the performance of the contractual obligations of the parties. The commencement date of commencement of construction The actual commencement date is the commencement time confirmed by both parties, which is usually a date after the contractor takes possession of the site and completes the preparation for construction. The engineer is obliged to confirm the commencement date, to inspect the contractor's preparation for construction and other conditions for commencement of construction, and to safeguard the interests of the employer.
Therefore, the start date can be confirmed against the contract or according to the actual situation on site.
-
Start writing from the moment you enter, and the more detailed the better.
The Construction Law strictly limits the qualifications of construction enterprises, and clearly stipulates that construction enterprises engaged in construction activities can only engage in construction activities within the scope permitted by their qualification levels after obtaining the corresponding level of qualification certificates. At the same time, Article 26 of the Law prohibits construction enterprises from contracting projects in the name of other construction enterprises in any form. It is forbidden for construction enterprises to allow other units or individuals to use their qualification certificates and business licenses in any form to contract projects in the name of their own enterprises. >>>More
What you mean is to do the plan for review, and I am the supervisor, who specializes in reviewing this. First of all, the company's qualifications should be complete, the on-site environment should be included, the arrangement of personnel, the arrangement of schedule, the on-site management system, safety and fire prevention measures, measures after the delay of the construction period, and so on.
Find it yourself, a lot of it online.
Dream Gangnam. The crows are exhausted, who is Xiaoli's hatred? The snow turned over the incense pavilion, and the breeze blew to the gall bottle plum. The word heart has turned to ashes. >>>More
If you discard and do not use the monthly fee, the monthly fee will still be deducted, if there is not enough balance in the card to deduct the monthly fee deduction, etc., it is easy to cause arrears, arrears will lead to the shutdown of the mobile phone, this arrears will be hung in your name, and the identity document will be blacklisted, affecting the future Unicom business (it will not affect other businesses such as banks in the early stage). If the contract user is in arrears and stops, it is a breach of contract, and liquidated damages will be charged. In addition, arrears will be charged a late fee of three thousandths per day, which adds up to a lot, and there may be a reminder letter and ** in the future, which will be very troublesome at that time, and it will not be worth it, after the arrears accumulate to a certain amount, Unicom can recover it through legal channels. >>>More