How to do the construction organization design of construction projects?

Updated on society 2024-03-12
14 answers
  1. Anonymous users2024-02-06

    What you mean is to do the plan for review, and I am the supervisor, who specializes in reviewing this. First of all, the company's qualifications should be complete, the on-site environment should be included, the arrangement of personnel, the arrangement of schedule, the on-site management system, safety and fire prevention measures, measures after the delay of the construction period, and so on.

  2. Anonymous users2024-02-05

    The construction organization design of the construction project should be combined with the construction work face, environmental requirements, climatic conditions, engineering quantity and intermittent time to plan as a whole, you can go to see the specific examples of others.

  3. Anonymous users2024-02-04

    You can't do it as a human being.

  4. Anonymous users2024-02-03

    Steps for the organization of construction design.

    1. Collect and compile supporting documents and materials.

    1) Project design and construction drawings.

    2) The construction schedule and requirements required by the project.

    3) Construction quota, project budget estimate and related technical and economic indicators.

    4) The labor, materials and mechanical equipment that can be equipped in the construction.

    5) The natural conditions and technical and economic data of the construction site.

    2. Compile an overview of the project.

    It mainly expounds the overview, characteristics and characteristics of the project, as well as the relevant requirements.

    3. Select the construction plan and determine the construction method.

    Mainly determine the sequence of engineering construction, select the type of construction machinery and its reasonable layout, clarify the flow direction of engineering construction and the calculation of flow parameters, determine the construction method of the main project (the general design also needs to make the overall deployment plan of the construction first).

    4. Formulate a construction schedule.

    Including the calculation of the quantity of the sub-item, the drawing of progress charts. Adjustments to the schedule, balance, etc.

    5. Calculate the amount of various resources required by the construction site and its best plan (including various labor, materials, machinery and its processing prefabrication, etc.).

    6. Draw the construction plan.

  5. Anonymous users2024-02-02

    The construction of a construction project can have different construction sequences; Each construction process can adopt different construction schemes; Each component can be produced in a different way; Each type of transport can be done in different ways and tools; On-site construction machinery, various piles, temporary facilities and water and electricity lines can have different layout schemes; A series of construction preparations before the start of construction can be carried out in different ways. Different construction schemes, the effect is not the same. How to combine the nature and scale of the project, the length of the construction period, the number of workers, the degree of machinery and equipment, the first material situation, the production mode of components, transportation conditions and other technical and economic conditions, from the overall situation of economic and technological unity, from the most reasonable plan from many possible schemes, make a comprehensive deployment of various construction activities, and prepare the technical and economic documents (i.e., construction organization design) that plan and guide the construction, which is a problem that must be solved before the construction personnel start construction.

    Construction organization design refers to a set of strategic deployment documents for reasonable construction in time and space prepared for the proposed project, according to the characteristics of the project itself and the specific conditions of the site, in accordance with the requirements of the project, for the required construction labor, construction materials, construction machinery and construction temporary facilities, after scientific calculation, careful comparison and reasonable arrangement. It is usually composed of a construction organization design specification, a project plan schedule, and a set of construction site layout plans. The construction organization design is the organization plan of the project construction, the comprehensive technical and economic document to guide the construction preparation and organization of the construction, and the guiding document for the on-site construction.

    Due to the diversity of building products, each project must prepare a separate construction organization design, and the construction organization design can only be constructed after being approved and approved. The basic principles and methods of building decoration and decoration engineering construction organization are basically the same as those of general construction organization design.

  6. Anonymous users2024-02-01

    The categories for the preparation of construction organization designs are as follows. (1) The content of the general design of the construction organization: 1) The description of the project summary and the characteristics of the project. 2) The general construction schedule and the schedule of the main unit project.

    3) The overall construction deployment and the construction plan of the main unit project. 4) Annual plan for the total demand of various resources (including labor, raw materials, processing components, construction machinery, installation equipment, etc.). 5) Full-site construction preparation plan (including the preparation of "three links and one leveling", the preparation of temporary facility construction, the utilization of the original roads, houses, power and processing plant conditions, the setting of institutional organizations, etc.).

    6) Design of the general plan of construction. 7) Technical and organizational measures and technical and economic indicators related to quality, safety and cost reduction. (2) the content of the construction organization design of the unit project: 1) the general situation of the project and the analysis of the characteristics of the project (including the location, construction area, structural type, building holding points and construction requirements of the project, etc.).

    2) Construction preparation work plan (including the preparation and use plan of entry conditions, labor, materials, machinery and rods, the specific arrangement of "three links and one leveling", the construction of prefabricated components, the ordering of special materials, etc.). 3) The selection of the construction plan (including the division of the flow section, the construction sequence and construction method of the main project, the labor organization and related technical measures, etc.). 4) Project schedule (including determining the project and calculating the quantity of the project; Determine the amount of labor from the number of shifts of construction machinery; Determine the working days of each sub-project; Consider the overlap of processes; arranging construction schedules, etc.).

    5. Plan for various resource requirements (including labor, materials, components, machinery, etc.). 6) On-site construction layout plan (including the stacking location of various materials, components and semi-finished products; the layout of water and electricity pipelines; the location of the machinery and the layout of various and various temporary facilities, etc.). 7) Technical and organizational measures for project quality, safe construction, cost reduction, etc.

    3) The content of the distribution (itemized) project operation plan 1) The characteristics of the project. 2) Main construction methods and technical measures. 3) Schedule.

    4) Plan for the use of materials, labor and machinery. 5) Quality requirements.

  7. Anonymous users2024-01-31

    Hello answer, I have seen your question and am sorting out the answer, please wait for a while Sixth stage: draw relevant drawings (foundation, main body, decoration construction plan, bar diagram, network diagram, main construction template with two drawings) (time three days.

  8. Anonymous users2024-01-30

    The construction organization design should enter the completion data, and it should be approved by the supervision, and generally there is no need to report for design approval, so the number of copies of the construction organization design is: superior company + supervision or owner + project completion data + on-site use.

  9. Anonymous users2024-01-29

    Definition 1: A guiding document for the organization of engineering construction. In the engineering design stage and the engineering construction stage, the design and construction units are responsible for the preparation.

    Definition 2: According to the requirements of the engineering construction task, study the construction conditions and formulate the construction plan to guide the technical and economic documents of the construction. Construction organization design is an important means to implement scientific management of construction activities, which has the dual role of strategic deployment and tactical arrangement.

    It embodies the requirements for the realization of the capital construction plan and design, provides the content of the construction preparation work at each stage, and coordinates the interrelationship between the construction units, construction types and resources in the construction process. Take construction engineering as an example: see the table below.

    There are differences in different projects, which should be compared with the actual project content! Design Catalogue 1, Preparation Instructions 2, Preparation Basis 3, Project Overview 1, Project Name and Scale 2, Project Scope and Content 3, Building and Structure 4, Electrical Engineering 5, Water Supply and Drainage Engineering 6, Heating Engineering 7, Material Practice 8, Construction Period Requirements 9, Quality Requirements 10, Safety and Environmental Protection Requirements 11, Natural Conditions 12, Construction Conditions 13, Relevant Units 2, Construction Overall Organization and Planning 1, Overall Leading Ideas 2, Project Management Organization 3, Construction Team Deployment and Task Division 4, Construction Preparation 5, Responsibilities of each department 6, construction general layout 7, overall construction organization plan 8, construction period target planning 9, project quality target planning 10, safety, civilized construction and environmental protection target planning 3, construction schedule arrangement 1, total construction period plan 2, project phased target plan 3, construction schedule bar chart 4, labor planning arrangement 5, main construction machinery and equipment 6, main materials (equipment) ** schedule plan 7, main divisions, sub-project construction methods and measures 1, Construction survey 2, foundation pit (groove) earthwork excavation and backfill 3, foundation engineering construction 4, formwork engineering 5, reinforcement engineering 6, concrete engineering 7, brick masonry engineering construction 8, indoor wall, ceiling decoration 9, window installation 10, ordinary floor tile floor 11, external wall insulation 12, scaffolding engineering 13, roof waterproof construction 14, bathroom waterproof construction 15, plastering 16, latex paint finish 17, wall tile 18, scattered water, step, ramp 19, electrical system 20, water supply and drainage, fire protection system 8, Technical and organizational measures to ensure the quality of the project 9. Technical and organizational measures to ensure the construction period 10. Technical and organizational measures to ensure safe production 10.

    1. Technical and organizational measures to ensure civilized construction 10.

    Second, the main materials and construction machinery and equipment invested in the project and the approach plan 10.

    3. Labor Arrangement Plan X.

    4. Appendix (1) Drawings (2) Schedule.

  10. Anonymous users2024-01-28

    In short, it is how to plan, including how to manage and schedule technology, work, materials, machines and time.

  11. Anonymous users2024-01-27

    1. Plan documents.

    Feasibility study report of the construction project.

    State-approved fixed asset investment plan.

    List of unit projects.

    The construction project is planned to be put into operation in phases and batches.

    Investment indicators and equipment and material ordering indicators.

    The approval document of the competent authority of the area where the construction site is located.

    The construction task issued by the competent department of the construction unit.

    2. Design documents.

    Approved preliminary design or technical design and design specification.

    Overall project estimates or revised total estimates.

    3. Contract documents and survey data of the construction area.

    The contract document refers to the project contract signed between the construction unit and the construction unit.

    The survey data of the construction area include topography, geology, meteorology, and regional technical and economic conditions.

  12. Anonymous users2024-01-26

    The general construction organization design includes the following layouts:

    1. Basis for compilation; Basis one.

    There are generally contracts, construction drawings, mainly related specifications, atlases, standards, regulations, etc.

    2. Overview of the project; Generally, it is extracted from the design description of the construction drawings (what kind of structure, number of floors, etc.) in combination with part of the bidding documents or the surrounding environment facilities provided by Party A, etc.

    3. Construction deployment; Generally, the organization of the construction, the division of the construction flow, the construction period, the goal of the project, the goal of civilized construction, etc.

    4. Construction preparation; Generally, it consists of two major parts: technical preparation and production preparation.

    5. Main project construction methods (methods); It is not as good as the foundation part, the main part, detailed to the formwork engineering, reinforcement engineering, concrete engineering, etc., all the projects involved in your construction drawings must be written one by one.

    6. Main management measures; For example, what technical management measures, quality assurance measures, safety assurance measures and so on.

    7. The general construction schedule and the general layout plan of the construction are attached.

  13. Anonymous users2024-01-25

    Table of Contents.

    Chapter 1 Project Overview.

    Chapter II Control Procedures.

    Chapter III: Control Objectives.

    Chapter IV Organizational Structure.

    Chapter V: Duties and Authority.

    Chapter VI Safety Management System and Measures.

    Chapter VII: Security Technical Measures.

    Chapter VIII Temporary Electricity for Construction.

    Chapter IX civilized construction methods.

    Chapter 10 Emergency Rescue Plan.

  14. Anonymous users2024-01-24

    For unit projects, 1, familiar with the review of construction drawings, investigation and research 2, selection of construction plans and construction methods 3, calculation of engineering quantity 4, preparation of construction schedule 5, preparation of materials, components, semi-finished products demand plan 6, determination of temporary production, living facilities 7, determination of temporary water supply and power supply pipeline 8, preparation of construction preparation work plan 9 construction plan design 10, main technical organization measures 11, submitted to the director for approval.

Related questions
7 answers2024-03-12

First, the general situation of the project.

This project is a vertical storage tank insulation project, the height of the storage tank is 10 meters, the diameter is 5 meters, the insulation material is polyurethane foam board, and the insulation thickness is 100mm. The construction site is an industrial park. >>>More

6 answers2024-03-12

First, first enter the venue to prepare:

1. Project commencement report, construction permit, construction organization design, materials and equipment for review. >>>More

3 answers2024-03-12

There is a forum for the University of Architecture Hall, so go find it.

5 answers2024-03-12

Organizational design of road construction.

Table of Contents: Chapter 1, Notes on Preparation and Rationale 3 >>>More

1 answers2024-03-12

The basic way of flow construction.

First, wait for the rhythm of the flow of construction. >>>More