Does the real estate company need to subscribe to the price?

Updated on society 2024-05-11
12 answers
  1. Anonymous users2024-02-10

    8801941 Fujian Province Fuzhou Xinchao Decoration **** Nanping Branch is entrusted by the affiliated legal person company to undertake interior decoration, garden sculpture, waterproof engineering, environmental art design. Address: No. 130 Bayi Road, Yuda Plaza, right on the third floor Zip code:

    353000 **Number: 0599-8858561 Qinglong Decoration **** Indoor and outdoor decoration in Jian'ou City, Fujian Province; Wholesale and retail address of fire-fighting equipment, building materials and chemical products: No. 25 West Street Zip code:

    353100 **Number: Indoor and outdoor decoration and decoration of Zhan Wang Aluminum Business Department, Jian'ou City, Fujian Province, 3898801; Aluminum alloy materials, building hardware, decorative materials sales address: 519 store, No. 172 Shuixi Road Zip code:

    2nd Floor, No. 21, Bayi Road Zip code: 353000 **Number: 0599-8286208 Nanping City, Fujian Province Li Zi Decoration Advertising **** Interior Decoration; Designing, producing, and publishing domestic outdoor anthologies; Sales of building decoration materials, hardware and electricity, daily necessities, glass, electronic appliances.

    0599 8737752 Fujian Province Pucheng County Longtai Decoration Co., Ltd. Building Interior and Exterior Decoration Decoration Light Box Advertising Production Address: No. 241, Guangming Apartment, Nanpu Town Zip Code: 353400 **Number:

    2322248 Fujian Xinshicheng Decoration Engineering **** Wuyishan Branch accepts the entrustment of subordinate legal persons and engages in business activitiesAddress: Yingbin Road, North and South 2nd Road (west of the Local Taxation Bureau) Zip code: 354300 **Number:

    5197388 Fuzhou Good Day Decoration Project **** Nanping Branch contacts the business within the business scope of the enterprise legal person. Address: Room 2608, Jinhui Plaza, No. 2 Dongshan Road, Zip code:

    353000 **Number: 0599 8838688 Fuzhou Xingyu Decoration Project **** Nanping Branch contacts the business within the scope of the business of the enterprise legal person. Address:

    No. 55-3, Wenchang Road, Guangguang County, Nanping City, Fujian Province Zip code: 354100 **Number: 7922975 Jian'ou City Changhe Decoration Service Co., Ltd. Interior decoration, decoration materials Address:

    No. 53, Luma Lane, Jian'ou City, Nanping City, Fujian Province Zip code: 353100 **Number: 3833988 Jian'ou.

  2. Anonymous users2024-02-09

    You can sue the developer for breach of contract, or the amount of the project itself is a ** project!

  3. Anonymous users2024-02-08

    At present, the registered capital is all subscribed system, and there is no need for capital verification, and the registered capital is paid.

    It's just that some companies, for the bidding of the project, may think that the company has tested the funds and is more powerful.

  4. Anonymous users2024-02-07

    Directly connected to the municipal water supply pipe network, from the fire pump room to connect two pipes out, **convenient to connect**, the joint needs to be set up water meter, gate valve. The fire hydrant start pump button is one for each fire box, and each floor is connected in series, and the wires are connected in the basement or on the first floor to form a circuit and connect to the pump control cabinet. If a fire stabilizer pump is installed, there is no need to start the pump button, and the electrical contact pressure gauge is set in the pump room.

  5. Anonymous users2024-02-06

    The fire hydrant belongs to the community system, and the water fee is paid by the community property.

  6. Anonymous users2024-02-05

    It is directly connected to the municipal water supply pipe network, and two pipes are connected from the fire pump room.

  7. Anonymous users2024-02-04

    The first is to lock in the main materials and installation costs, reduce future uncertainties, and reduce disputes.

  8. Anonymous users2024-02-03

    First let your cost clerk calculate the cost of the set of quotas, and then compare with the manufacturer** level** and finally determine which settlement method to use, understand?

  9. Anonymous users2024-02-02

    The so-called 11 points are your management fee, and the talent machine is down 5 points. It seems a little hanging. The profit of general fire protection is about 36%, and the risk of earning or earning is a bit big, depending on your cost control and management.

  10. Anonymous users2024-02-01

    In this way, it depends on how large your project is, which has a lot to do with the management level and the price of the construction personnel, the price is too high, and the construction period is too long, the cost is not easy to control, and such a project is very risky.

  11. Anonymous users2024-01-31

    The fire protection works at our site will be reduced by 25% according to the fixed price

  12. Anonymous users2024-01-30

    Don't be afraid, profits are made.

Related questions
10 answers2024-05-11

China Real Estate Group Xingtai Real Estate Development Company, Xingtai Zhongding Real Estate Development Company, Xingtai Yongkang Real Estate Development Co., Ltd., Qiaoxi Branch of Zhongfang Xingtai Real Estate Development Co., Ltd., Xingtai Municipal Construction Group, Xingtai Huating Building Decoration Project, Hengfeng Real Estate Development, Xingtai Jiacheng Real Estate Brokerage, Xingtai Construction Engineering Company, Fujian Noble Construction Engineering Development Co., Ltd., Xingtai Branch.

6 answers2024-05-11

Asset accounts: The asset accounts of real estate enterprises usually include cash in hand, bank deposits, other monetary funds, trading financial assets, notes receivable, accounts receivable, prepaid accounts, dividends receivable, and interest receivable. Other receivables, bad debt provisions, material procurement, packaging. Low-value consumables, in-stock goods. >>>More

4 answers2024-05-11

The real estate bidding process is:1Apply for tender.

The developer shall go through the approval procedures for the commencement of construction projects with the local construction authority. After approval, the developer can register with the local bidding management department, apply for bidding, and receive the bidding form with the "Construction Project Commencement Approval Form" and the bidding application form agreed by the construction department. Developers can only go through tenders after they have been approved for tendering. >>>More

25 answers2024-05-11

The agreement is legal and valid.

If you don't want to fulfill, it is recommended that you start with the following: >>>More

2 answers2024-05-11

1. Review the original vouchers.

1) External original vouchers. Vouchers obtained by the business operator from external entities when the business occurs or is completed, such as invoices from merchants, bank receipt notices, etc. >>>More