After the installation of the air heat pump, there is no need for a third party to test, and after the installation of the general manufacturer, professionals will debug and inspect.
-
After the installation of the air heat pump, a third-party test is required, which must meet the standards and have relevant certificates.
-
If the air heat pump is generally a small equipment, it does not need a third-party test, if the equipment you use is relatively large, it is best to ask some qualified units to do a test.
-
According to the relevant regulations, after the installation of the air heat pump, a third party needs to be hired to conduct the test and issue a relevant test report.
-
Normally, there is no need for third-party testing, because you can install an air heat pump without testing.
-
After the installation of the air heat pump, a third party is required to test, so that it can be used only after the test is completed.
-
Yes, the newly installed machine manufacturers will help with debugging.
-
In this regard, there must be a third party to test, only in this way can it be determined that it is qualified, and only in this way can a very good effect be achieved.
-
After the installation of the air heat pump, it is generally necessary for the local party to carry out relevant testing.
-
Does the air heat energy be installed and tested by a third party? This is certain, if it is a test, it is also safer to use.
-
Do I need a third party to test after the air thermal energy is installed? Third-party testing is required after the installation of air thermal energy.
-
Some are needed, some are not needed, according to what sector is installed.
-
Selection of installation location. The air source heat pump is heated by absorbing free heat energy from the air, so the main engine must be installed in a ventilated place. After installation, do not pile up sundries near the main engine, so as not to affect the heat absorption and heating efficiency of the air source heat pump.
-
Air energy heat pumps are a bit larger than regular water heaters, so they are not recommended to be installed in the bathroom. Because the bathroom is damp, it is easy to corrode the machine. If it is a household, it is recommended that you consider installing a Hawei air energy heat pump, which is better to install in the kitchen or on the balcony.
If the distance between the main engine and the water tank is very far during installation, it is recommended to install a return pump to solve the problem of slow hot water return.
-
Not the same. After the test machine, ing can be normal.
No other anomalies will do the trick.
-
Do I need a third party to test an air heat pump after installation? It's another professional problem, and our ordinary knowledge still can't reach that point.
-
It is very necessary to overhaul the heat pump heating system before starting, because the most likely problem is that the pump is stuck if it is not overhauled in the early stage, and it is necessary to check the water system, mainly to see if the valve is open, and the one that should be opened should be opened, check whether the water pressure is enough, and if it is not enough, it is necessary to replenish the water, and then remove the filter to see if there is any blockage. If you confirm that there is no problem, you can power it on. I hope mine can help you.
-
Generally, there are professional companies that will provide third-party test reports.
-
Mainly: pipes, pipe fittings certificate and quality inspection report, buried pipe position and depth, length, hydraulic test records. The main engine and the indoor end are similar to those of the water machine.
-
The general test report is divided into two kinds, one is the safety test, the other is the performance test, and you do more performance tests for this kind of product.
-
It is very necessary to overhaul the heat pump heating system before starting, because the most likely problem is that the pump is stuck if it is not overhauled in the early stage, and it is necessary to check the water system, mainly to see if the valve is open, and the one that should be opened should be opened, check whether the water pressure is enough, and if it is not enough, it is necessary to replenish the water, and then remove the filter to see if there is any blockage. If you confirm that there is no problem, you can power it on. I hope my answer will help you.
-
At present, the industry is more popular
DU's qualification of air energy heat pump laboratory is mainly DAOGMPI and low temperature assessment. Inside.
These two identifications are allowed to be completed by the Hefei General Machinery Research Institute, and they can be consulted for details.
In addition, what qualifications are required for the laboratory also need to be determined according to the needs of market bidding.
-
Low temperature environment and test heat pump heating.
-
Beijia Institute, Hefei Institute, Weikai, three units issued low temperature accreditation certificates. Now the certificates are all minus 30 degrees.
Our company specializes in the construction of air source heat pump cryogenic laboratory, including certificates.
-
No, the air energy water heater can be placed anywhere you specify, without affecting the aesthetics of the building, only a small space, no direct light, very easy to install, can be placed in the open air, can also be placed in an inconspicuous corner or basement, and can realize unmanned operation, fully automatic control of constant temperature water supply.
-
No, this is the manufacturer's responsibility for installation, the goods you bought, including the installation fee?
Air energy heat pump generally refers to the main engine part, the common matching heating end is floor heating, here according to the installation of air energy heat pump water floor heating to explain, divided into several parts, first according to the house design; Reserved temperature control wiring; laying insulation; laying a reflective aluminum foil layer; laying of underfloor heating coils; Clamp nails or steel wires to fix the floor heating pipes; Intermediate acceptance (one hydrostatic test); Concrete and cement mortar leveling floors; installation of air energy and circulating water pumps; Completion acceptance (secondary hydrostatic test); The special thermostat is finally installed and commissioned. >>>More
The heat pump unit heating is mainly reflected in: high efficiency, energy saving, environmental protection and safety. No flammable, explosive gases. >>>More
Yes, there is no conflict, as long as the budget is sufficient. >>>More
According to the specification: the power supply is connected to the total open (empty open), (all) up and down, (facing the switch) left zero right fire, and the lighting live wire is connected to a circuit breaker; The socket live wire is connected to another circuit breaker, and then connected to the leakage protection pile (the left is connected to the total open zero line, and the right is connected to the circuit breaker under the live wire), and the leakage is the socket power supply (only for handheld electrical sockets, air conditioning sockets do not have this requirement). Air conditioner, you can add another circuit breaker. >>>More
3 tons of air can be equipped with a high power circulating pump--- with Wilo's PH-101 can be satisfied. >>>More