sPs waterproofing membrane production equipment, how to construct sps waterproofing membrane

Updated on vogue 2024-06-15
3 answers
  1. Anonymous users2024-02-12

    The production speed of the waterway is relatively fast, suitable for the production of PE and other products, the sweat road is slightly slower, suitable for the production of page salt, and fine sand and other products, of course, no matter what products can be produced by the waterway sweat road, each has its own merits, the large line is generally two 10 tons of irrigation, and two five tons of irrigation, a large oil storage pool, (the specific are their own negotiation) the large line generally produces 10,000 square meters per day without a problem. **Now estimated at around 200w.

    The small line is relatively simple, divided into self-flow line, and the self-flow is produced directly into the oil tank by the ingredient filling, and the small line ranges from 50 to 100) million.

    The installation of the production line is not provided with the formula, so that the formula is not fixed, for reference only, due to different places, different materials, production formulas and processes are also different, the materials of the coil are generally the following.

    Asphalt: 10

    Engine oil, heavy oil, etc.

    Rubber powder: It is divided into ordinary rubber powder and tire rubber.

    Propylene particles: PE particles.

    Talc, stone powder, heavy calcium, light calcium, etc.

    So be it, hope it helps.

    The production line I am talking about is a standard production line, not those small private workshops, the quality of the production line is very important, and it is very important to the smooth production and the quality and appearance of the product.

  2. Anonymous users2024-02-11

    <> "There are hundreds of thousands to hundreds of thousands, depending on what you need."

  3. Anonymous users2024-02-10

    The construction steps of SPS waterproofing membrane are as follows:

    1.To clean up the base layer, it should be flat, dense, clean and dry.

    2.Brush the base treatment agent, and clean the nodes with a brush before applying the SPS cold primer on a large area.

    3.For additional layer processing, the nodes are done first, and the additional layer is processed, and the details are processed and then the coil is paved.

    4.The paving of the coil is paved according to the construction environment, and if there is no problem after checking, the hot melt edge can be sealed; Then try whether there will be water seepage, and if there is no water seepage, you can put on the protective layer.

    Due to the complexity of the construction steps, it is recommended that you leave it to a professional building waterproofing company. Here we recommend Keshun shares, which has participated in the construction of the basement of the National Aquatics Center Water Cube, which is strong and trustworthy.

    Founded in 1996, after more than 20 years of steady operation and efficient development, Keshun Waterproof Technology Co., Ltd. has grown into a comprehensive building materials company with comprehensive waterproof solutions as its main business, integrating engineering building materials, civil building materials and building repair business sectors, and its business scope covers domestic and foreign countries. And it has formed a waterproof material research and development, manufacturing, sales as the main body, including technical services and engineering services of the multi-format combination, the company is now the vice president of the China Building Waterproof Association unit, has been elected for 10 consecutive years as the "real estate top 500 preferred waterproof material brand", has signed strategic cooperation agreements with more than 100 well-known real estate companies such as Country Garden, Vanke, Sunac China, Greenland Holdings, China Shipping, Shimao, Longfor Group, China Merchants Shekou, etc., ranking among the top three in the industry's comprehensive strength.

Related questions
5 answers2024-06-15

There are many kinds of waterproofing membranes, and the sampling standards generally have requirements in the standard, and sampling should be carried out in strict accordance with the requirements of the standard.

7 answers2024-06-15

First, asphalt-based waterproofing membrane.

Such materials are made of asphalt, because it is an organic compound that has been characterized as having low volatility and environmental impact. >>>More

8 answers2024-06-15

There are three types of SPS waterproof coatings: 1 SPS polyurethane high-elastic waterproof coating, 2 SPS polymer cement-based waterproof coating, and 3 SPS water-curing environmentally friendly waterproof coating. >>>More

4 answers2024-06-15

I'll cut it out for you:

Waterproofing construction of roofs. >>>More

13 answers2024-06-15

There is no harm in the membrane, but it is best to use environmentally friendly waterproof materials in the bathroom. >>>More