-
I think that if you want to avoid rework after decoration, you must first do a good job of waterproofing the bathroom and kitchen, and the furniture and cabinets should also be designed according to your own habits.
-
It is necessary to pay attention to the waterproofness of the bathroom, and must have very strict requirements for the specifications of water and electricity laying, and the air conditioner bath bomb needs to pull a special line, which can reduce the risk of tripping, and a pre-filter can be installed at the water pipe in advance to test the water pressure at home.
-
It is necessary to do a good job in the treatment of wires, wall joints, floors, and seams, and lay out the lines in advance.
-
The water circuit must be installed, and the floor heating must be installed in advance. Drain pipes made of copper. Install the walls first, and then decorate the bedroom.
-
We can buy toilet gas in advance, as well as some materials and soundproof cotton, which need to be installed in advance, which can reduce some of the procedures.
-
There are temporary toilets, check valves, pre-filters, floor drains, sewer soundproof cotton, and so on.
-
In order to avoid this kind of dispute, the first step of decoration must be to buy a temporary toilet online in advance for the convenience of the workers. Otherwise, if you meet a master with a very average quality, it's really hard to say whether it will be solved directly in your new house.
-
<> "Prepare these 10 things before renovating!
No delay in the construction period!!
Paid 40,000 tuition fees to sum up the experience.
1.After handing over the house, apply for a decoration permit in advance.
We waited a week to do it;
2.Read more about the design on the learning website.
Determine the approximate decoration style and budget in advance;
3.Those who handle the decoration bag can go to the celebration in advance.
The approval of the decoration bag takes about a week: Yusheng.
4.Clarify the size of the electrical ruler and the installation reserve.
Washing machine refrigerator water heater plumbing machine air conditioner.
5. Combined with the actual situation, think about the decoration method in advance.
Self-loading? All-inclusive? School Pack?
6. Plan the approximate placement of electrical appliances in advance
In this way, the entry of hydropower can be directly disgusted with political construction;
7.The back that I can think of in advance is possible.
The electrical appliances that will be used must be planned for power supply, and it is not so easy to rework and add new ones later;
8.Run the market in advance to determine the bricks, some bricks are not spot and need a production cycle;
9.Communicate the whole house customization in advance, and compare multiple houses.
Choose to have a factory, this kind of relative increase.
The whole house customization cycle is also relatively long, so it is determined in advance, and the order can be placed after the powder is finished;
10.Visit more houses of the same type or in the same community.
I have learned a lot from Nengfeng, and if it is good, I will apply it directly, and if it is not good, I will pass it directly
-
<> "During the decoration process, these time nodes will be reworked if they are not present.
1. Install the cabinet to be present, and tell the master that the cabinet must be equipped with a top plate and a back plate.
Installed Not installed.
2. You must be present when backfilling and waterproofing experiments in the health and sales rooms, and do not backfill with building waste.
Ceramsite backfill Construction waste backfill.
3. Large furniture must be present when entering the site, and keep an eye on the handling master to prevent bumping and scratching the floor.
Do a good job of protecting and not protecting yourself.
4. After scraping the putty, you should be present and check the flatness of the wall in time to see if there is cracking.
Wall leveling acceptance Timely acceptance.
There is no acceptance. 5. Latex paint toning should be present, even if the color card is accurate, there is still a difference between the effect and a large area on the wall.
When grading after being on the wall.
6. Any material must be present at the site, and carefully check whether the model and quantity are wrong.
7. During the whole decoration process, as long as you have time, you will run to the construction site, after all, the house will live in Voltai.
-
When we do the decoration, we usually calculate the budget and then contract our house to the decorator. What precautions can be done before the question to prevent reloading and rework? Today we're going to talk about it. <>
1. Practical decoration materials.
When decorating a house, what we fear most is the cutting corners of the workers. For example, in terms of electricity distribution, the general household wires will choose big brands, guaranteed, and long service life. At this time, I am afraid that the workers will be shoddy, and some small brands on the market do not have wires from regular manufacturers.
There is also our socket, be sure to check whether the number of sockets is sufficient. If we wait until we move in and use it, we find that the number of sockets is not enough. Then our daily life will be very inconvenient.
It is recommended that you can leave a few more sockets, and it doesn't matter if you don't use them, just in case you need them. <>
2. Latex paint.
Some may choose to put wallpaper on the wall, while others will choose to paint their own latex paint. Wallpaper is rarely problematic. Latex paint is different, there are many brands of latex paint, and the content of toxic substances is also high or low.
That's what we need to pay attention to during the construction process. When the shoddy latex paint is repainted, there will be color difference, potholes on the wall, and even falling off later. Moreover, the toxic substances contained in shoddy latex paint also take a long time to dissipate.
Some even take more than ten years, and the toxic substances in them can make people have headaches, nausea, and convulsions in severe cases. So be sure to pay attention to whether the latex paint applied is the brand we choose. <>
3. Sound insulation effect.
The sound insulation of many houses is renovated by themselves. When we decorate soundproofing, we can use the hollow of the room, and then put our soundproof board or soundproof cotton inside. At this time, we need to pay attention to the things we use for sound insulation.
Their densities are different, and the effects they produce are also different. Strict control can put an end to the trouble of reloading and reworking.
-
First of all, you must choose and determine your favorite decoration style, express your ideas accurately and clearly with the decoration master, and make a budget for decoration needs in advance. Also check the quality of the material.
-
Decoration should find a professional to design the overall pattern, and then try to choose better quality materials, do a good job of waterproofing measures for the whole house, and prevent rework.
-
First of all, you should communicate in time on the selection of materials, see what kind of materials you want, and what kind of furniture color and style you use, which should be negotiated with the decoration company, so as to eliminate rework.
-
First of all, some details of the decoration should be said well, and then the materials must be selected well when decorating, and the labor cost must be calculated in all aspects, so that rework can be eliminated.
-
When decorating, I am most afraid that the effect will be bad after the decoration is not good to rework, one is a waste of time, the other is a waste of money, looking at the place to knock out and do again, my heart is dripping blood, it is all white silver! Therefore, for the decoration of a new house, you should look at some knowledge of decoration. In addition, there are several places in the decoration of the new house that must be paid attention to, otherwise it will be troublesome to change it in the future.
1. Install hot and cold water pipes near the faucet in the kitchen.
Regardless of whether it is in the north or the south, washing vegetables and dishes in winter without hot water is a big problem. Installing hot and cold water pipes near the faucet in the kitchen can easily solve this problem, and it is convenient for children at home, so you don't have to run to the bathroom every time to wash your hands or anything.
Second, in order to save money, choose low-quality materials.
It should be said that the decoration materials must be selected well, big brands. We have to live in the house for decades, *** materials***, poor quality materials may not live long before problems, and then it will be more troublesome. And low-quality materials may be harmful to the human body, so don't buy some bad-quality decoration materials because of greed.
3. Install a water purifier in the kitchen.
Install a water purifier in the kitchen. Nowadays, water pollution is getting more and more serious, although water companies will disinfect tap water, but for the health of your family, it is best to install a water purifier, especially for friends with children at home.
Fourth, vacate the place to put the refrigerator.
Some friends do not take into account the location of the refrigerator when decorating, or the vacant space is not large enough, resulting in no place for the refrigerator. Therefore, before decoration, you must understand the size of your refrigerator or the refrigerator you are going to buy, so that the decoration master can vacate enough space.
Fifth, the socket installation problem.
Many friends will encounter the situation that the socket is not enough or the socket is not suitable, which is the reason why the decoration is not considered clearly. When decorating, it is necessary to set up the socket according to the placement of the furniture and the placement of electrical appliances in the future, otherwise the place where the socket is installed will be covered by the sofa in the end, and it will be installed in vain.
There are three more details to keep in mind when making a prepayment. >>>More
Technology enriches life. The premise is that the phone is charged. Picking up the car is bound to be a time-consuming and energy-consuming matter, and the mobile phone may also consume power quickly due to frequent use, although most of the vehicles are equipped with charging ports, but there is no charging line to get blind after getting on the car. >>>More
Going to work in a new company means a new beginning, a new environment. How to adapt to the environment on the first day is very helpful for the future work. Often, some people seem to be at a loss and have a sense of fear. >>>More
Famous stories about success with attention to detail:The modern economy has entered a period of rapid development, and economic development mainly relies on the two wheels of management and technology. In foreign countries, economists believe that Western industrial modernization is "three points by technology, seven points by management". >>>More
You need to be prepared to learn physics well, and be prepared to want to give up physics, because the logical thinking of physics is very strong, and you can't learn it well if you want to learn it well, so you must be mentally prepared to learn it if you work hard.