First of all, it is necessary to waterproof the bathroom and kitchen, and at the same time, the floor should be laid neatly, and then the wires, water pipes or floor heating should be pulled, and then the cement and tiles should be paved, and then the wall tiles or putty should be painted, and then the installation should be carried out.
-
It is necessary to inspect the house in advance, to design the drawings, to start the construction and give the bottom, to do a good job in the acceptance work, but also to pay attention to the decoration process, but also to pay attention to the cost of decoration, these are the process and steps of interior decoration.
-
It needs to be designed, then dismantled, waterways and circuits laid, bricklayers entered, carpenters entered, and soft furnishings purchased.
-
1. Design: The first thing to determine is a project for house decoration, customize one or several suitable schemes, and choose the grade that you can bear, high-end, mid-range or low-grade. The design fee includes planning, which generally accounts for 5%-20% of the entire renovation cost.
The planning and design process needs to be rationally arranged, appropriately allocated funds, and not to reuse labor and materials for subsequent construction.
2. Materials: After formulating the house decoration plan, it is necessary to start the selection of materials according to the design. Now the decoration materials have been productized flow operations, decoration has become a model, in fact, it is a combination.
In order to find a suitable one, it is necessary to run several more building materials markets to find the best combination of materials and materials. Materials are the largest part of the cost of home improvement, and material adulteration also occurs from time to time, so try to be cautious in the selection process, do not buy some unbranded products, so as not to run into parallel goods.
3. Price bargaining: After finding your own suitable and favorite materials, you need to explore the price, and the merchant will often offer quite high ** and claim to be cheap. At this time, you can take out the approximate market price and bargain price that you have found out in the previous step, and find out its floor price.
4. Identification and contracting: After determining the approximate cost of design planning and materials, you can contact some decorators. It's a good idea to consult with some professionals first, introduce you to a more reliable renovator, and sign a contract with them.
The content of the contract should include the materials used, the designated brand and the ** agreed by both parties, the more specific the better, so as to avoid future disputes.
5. Total budget: On the basis of design and inquiry, budget the cost of the entire decoration process with the decorator, including design, materials, construction costs, etc.
6. Time preparation: After all, decoration is a big expense, you need to spare enough time before decoration to put the design, materials, price and budget in place, the more fully prepared in the early stage, the faster the decoration can be.
-
Article 1 Basic Requirements.
1. Basic procedures.
1. Interior decoration should comply with the following basic procedures:
1) The living room, bedroom, and office should be topped first, then the wall, and then the ground;
2) The kitchen, bathroom, and boiling water room should be waterproofed first, and then the wall, the top, and the ground should be back.
3) Interior decoration construction should be carried out in the order of first concealed engineering, intermediate engineering and finishing engineering.
4) The next process should be completed after the construction of the previous process and the acceptance and meet the design requirements, and then carry out the construction.
Second, the basic requirements of the material.
1. Material procurement requirements.
1) The purchased materials must have quality inspection certificate, environmental protection inspection certificate, product packaging or labeling with Chinese product name, specification, model, manufacturer, address, product expiration date, must meet the relevant national environmental protection standards, health standards and fire protection standards.
2) When purchasing materials, testing equipment such as water measuring instruments must be used to test product quality;
3) When purchasing materials into storage, acceptance work should be done.
2. Material storage requirements.
1) The inventory materials must be stacked neatly and kept by special personnel;
2) Wooden materials must be stored in a dry and ventilated area, and do a good job of fire prevention, waterproofing and insect prevention;
3) Inventory materials must be first-in, first-out to reduce backlog.
3. Requirements for the issuance of materials.
1) The material salesman organizes the distribution of materials according to the shipping order;
2) Inventory materials must be first-in, first-out, and the inventory backlog caused by material quality should be dealt with in a timely manner;
-
Planning Phase: Determine the purpose, budget, design style, and timeline of the renovation.
Design Phase: Work with a designer or architect to develop a detailed design plan and drawings.
Material selection stage: choose the materials required for the renovation, such as tiles, flooring, paint, etc.
Contract signing stage: sign a detailed renovation contract with the contractor, determine the construction period, budget, payment method, etc.
Demolition phase: The contractor begins demolition and renovation work to rearrange the original space.
Installation phase: Installation of new appliances, plumbing, and other facilities.
Decoration Stage: Carry out the final decorations, including painting, flooring, tiles, furniture, etc.
Completion stage: complete the entire renovation project, carry out quality acceptance and clean-up work.
Follow-up maintenance: Continue to maintain and maintain the renovated space to ensure long-term use.
Please note that the exact steps of the process may vary depending on the region, the size of the project, the purpose of the renovation, and other factors. Therefore, it is best to work with a professional renovation company or architect to ensure that the renovation project runs smoothly.
-
The process steps of home renovation mainly include:
Preparation of decoration materials: When preparing decoration materials, it is necessary to take into account factors such as the quality, service life, and durability of the materials; In addition, it is necessary to choose a reliable building materials store to ensure the quality of decoration materials.
Demolition of old renovations: When demolishing old renovations, it is necessary to pay attention to safety and should be demolished by certified workers; In addition, it is necessary to check whether there are problems with the water and electricity pipelines to ensure the safety of construction.
Construction: The requirements for construction technology, construction time and construction quality are very high, and should be constructed by a special construction team.
-
1. What is the general idea of the new house and the decoration grade?
2. How much money to decorate? How long is the replacement cycle after this renovation?
3. Are there any taboos in decoration?
4. The design of permanent family members, elderly and children is different.
5. Hobbies of each family member.
6. If there are old furniture and appliances that need to be moved to a new house, you have to measure their size in advance.
1. Deal with the base layer of the wall.
The base treatment of the wall is very important in the painting step, sloppy, you must know that the base treatment of the wall is not done, it will affect the subsequent process, so we must level the base before painting, in addition, because most of the rough houses are not flat, so it is necessary to carry out the leveling and cleaning process, when painting the wall, the old paint should be removed, if it is an old house of more than five years, the putty must be removed. >>>More
The specific process is as follows:
1. Clarify your housing needs. It includes three parts: functional requirements, storage needs and aesthetic needs. Then sort out your own housing needs. >>>More
First of all, according to the interior design drawing, the wall is demolished and the wall is built; The next step is hydropower engineering and ceiling slotting, and at the same time the pipe wiring; After that, carpentry works began, such as ceilings, cabinet installation, etc.; After that, install lamps, switches and sockets; Finally, install the bathroom, kitchen supplies, floors and walls.
Flame retardant materials are used for wall grooves, threading, and wiping pipes. The lower tube of the ceiling is firmly fixed with clips to ensure that it is horizontal and vertical, and the wire box is installed where there are lamps and lanterns, and the cover is buckled outside. Interior decoration must first consider fire prevention, the pipelines used must be flame retardant, and ensure that each line has a protective casing.
Many people do not know much about the decoration process after buying a house, decoration is actually a very cumbersome thing, from the very beginning of the home improvement consultation to the final perfect completion, moving into the new house, there are many steps in between. New owners generally go directly to the renovation company to plan the renovation budget, and then bring the family to everyoneRenovation processStep-by-step introduction to help ownersHome improvement processIn one step, you can have a full understanding of the entire decoration process. >>>More