The interior decoration sequence process is introduced in detail

Updated on home 2024-07-13
4 answers
  1. Anonymous users2024-02-12

    The specific process is as follows:

    1. Clarify your housing needs. It includes three parts: functional requirements, storage needs and aesthetic needs. Then sort out your own housing needs.

    2. Prepare a decoration budget. Generally, the cost of home decoration is about 20%-25% of basic decoration, 25%-30% of main materials, 25% of furniture, and 20% of household appliances. Before the renovation, the total amount of the family's disposable decoration budget is clarified, and the proportion of decoration costs at each stage is proportioned according to the total amount.

    3. Determine the decoration method. Choose the right way to decorate according to your time and energy, as well as your budget. Nowadays, the most common ones are full and half packs.

    All-inclusive: design + construction + materials + soft furnishings are provided by the decoration company. Suitable for owners with less free time, or less experience in renovation.

    Half package: design + auxiliary materials + construction by the decoration company is responsible, the main materials are purchased by the owner. The disadvantage of this method is that it takes more time to select the main material.

    This model is suitable for owners who have sufficient renovation knowledge and have leisure time.

    4. Determine the design plan and sign the contract formally. Find a reliable designer, communicate your ideas with the designer, and after the designer designs a satisfactory plan, he will officially sign a contract and prepare to start construction.

  2. Anonymous users2024-02-11

    Detailed introduction of the decoration sequence process:

    1. Disclosure of start-up: The owner, designer, and supervisor need to be present together to clarify the process, acceptance criteria, and additions and decreases at the construction site. About half a day.

    If it needs to be dismantled, check the items that need to be kept on site, such as air conditioners, furniture, electrical appliances, etc., and the owner needs to inform the foreman how to deal with them.

    2. Dismantling: about 3-5 days.

    3. Hydropower disclosure: if there is a water purifier, garbage disposer, etc., it has been crossed together; If there is floor heating and fresh air, it is necessary to negotiate the order with the construction party. Note:

    It takes 2 days for fresh air construction and 3 days for underfloor heating construction. Cabinet measurements, heating remodeling, and window measurements can be done before the disclosure or disclosure. About half a day.

    4. Hydropower transformation: pay attention to hydropower slotting, air conditioning punching, and arrange construction if there is an in-wall toilet. During the construction of water and electricity, you can choose bricks, change windows, and measure the entrance door. About 5 days.

    5. Hydropower acceptance: prepare to buy switch panels, as well as angle valves, eight-figure valves, and floor drains. About half a day.

    6. Filling the groove and cement leveling of the kitchen and bathroom wall: after the water and electricity acceptance is qualified, the groove can be filled. Remember to go downstairs to the next door to see if there is a leak. About 1 day.

    7. Balcony tiling, kitchen and bathroom brushing waterproofing, and closed water test: During this period, you can choose the floor, set the threshold stone, prepare the smoke stove check valve and the corner strip grout agent for tiling. About 3-5 days.

    8. Kitchen and bathroom tiling: During this period, notify the cabinet manufacturer to prepare the resumption, and notify the door factory to come to measure. Install the entrance door before attaching the floor tiles. About 3-4 days.

    9. Leveling with floor tiles or cement floor: pay attention to the maintenance of the ground. During this period, water heaters, check valves, and gas retrofits can be carried out. Notify the kitchen and bathroom ceiling to come to measure. About 1-3 days.

    10. Gypsum leveling wall and top surface: pay attention to gluing gypsum lines. During this period, you can choose sanitary ware, electrical appliances, and furniture. About 2-3 days.

    11. Oilman scrapes putty (2-3 times): buy paint before brushing the first putty. About 3-5 days.

    12. Putty grinding: about 1 day.

    13. Brushing paint on one bottom and two sides: brushing primer has a good effect, preventing alkali return to the bottom layer, anti-corrosion, and increasing the adhesion of the coating. During this period, the ceiling installation of kitchens and bathrooms and balconies can be carried out; Prepare and install the switch panel fixtures. About 2-3 days.

    At this point, the foundation construction is completed, and the next step is the installation of the main materials. Special attention: 10 days in advance, the floor merchant will come to measure and accept the ground to see if it has the paving conditions.

    14. Cabinet installation: about 1-2 days.

    15. Door installation: about 1 day.

    16. Floor installation: about 1 day.

    17. Bathroom installation: about half a day.

    18. Wall repair and cleaning: return the excess tiles, and repair the wooden doors and other main materials at the same time. Find a cleaning company to do cleaning and cleaning. About 1 day.

    19. Furniture entry: about 2-3 days.

  3. Anonymous users2024-02-10

    The process of self-decoration includes the purchase of materials, the demolition and modification of the main body, and the laying of water and electricity lines. Installing wooden furniture, laying tiles, doing paint work, and installing various household items.

    1. The first cave should first purchase corresponding materials according to the area of houses, floor tiles and walls, etc., to avoid waste.

    2. Demolition and modification of the main body, including demolition of walls, building walls, etc., but the load-bearing walls cannot be moved.

    3. Make a groove on the wall and ground, lay the water pipe code with wires, and pay attention to the waterproof layer.

    4. Complete various indoor wooden processes, such as custom cabinets, sliding doors, bookcases, etc.

    5. Laying wall and floor tiles, including the waterproofing of the base surface.

    6. Painting engineering, including putty, sanding, brushing the base coat, etc.

    7. Install light sockets, lamps, sanitary ware, household appliances and curtains.

  4. Anonymous users2024-02-09

    The sequence process of home decoration is pre-design, demolition and transformation of the main body, transformation of waterways and circuits, painting wall paint, wallpaper, installation of socket panels, installation of cabinets, doors, floors, and post-decoration.

    1. Preliminary design: Before decoration, the designer should first design, clarify the tiling area, wallpaper area, and floor area of the house, and also measure the size of the furniture.

    2. Dismantle and transform the main body: When the main body is renovated, the wall should be demolished, the wall should be built, the wall skin should be shoveled, the heating should be dismantled and the plastic steel window should be replaced. In addition, after the renovation is completed, it is necessary to clean up the garbage on the ground in time to keep the room clean and prepare for future construction.

    3. Transform the waterway and circuit: Before the transformation, it is necessary to determine the exact location of cabinets, lamps, basins, bathtubs, washing machines and switches, air conditioners, and power supplies, and then formulate a hydropower transformation plan.

    4. Paint the wall and paste the wallpaper: After the wall paint is painted, the painter will apply a layer of nitro paint to the place where the wallpaper is pasted, and after the nitro paint is completely dry, you can paste your favorite wallpaper.

    5. Install the socket panel: The work can be completed in half a day, but special attention should be paid to the installation of the socket with the switch function as much as possible, and the electrical appliances can be controlled by the switch, without repeatedly plugging and unplugging the power supply, which is more convenient.

    6. Install cabinets: When installing cabinets, you should buy range hoods, sinks and stoves in advance, and install them as imitations, so as to have the effect of saving time and effort.

    7. Install the finished door: Before installing the floor, the finished door should be installed first, because the installation of the finished door is very complex and requires a lot of tools, if it is not installed in advance, it is easy to damage the floor.

    8. Install the floor: When installing the floor, workers should not be allowed to cut the floor tiles indoors, so as not to cause damage to the laid floor tiles.

    9. Later decoration: After the slab bricks are paved, the frame of the house is basically done, as long as it is matched with curtains and decorations on the orange line.

    Precautions for house renovation:

    The location of the bathroom floor drain should be thought about in advance and the size should be measured. The floor drain is best located on the side of the brick, if the file is in the middle of the brick, no matter how the brick is tilted, the floor drain will not leak.

    When installing plastic steel doors, we must calculate the size of the door frame of the plastic steel door protruding from the wall, so that the door frame and the wall of the porcelain tile are flat, so that it is beautiful and hygienic.

Related questions
8 answers2024-07-13

When it comes to interior renovation, there are certain steps and sequences that need to be followed to ensure a smooth process throughout. First of all, the first step in renovation is usually design and planning. This includes determining the style of the renovation, color scheme, material selection, etc., and developing a detailed renovation plan. >>>More

8 answers2024-07-13

First of all, according to the interior design drawing, the wall is demolished and the wall is built; The next step is hydropower engineering and ceiling slotting, and at the same time the pipe wiring; After that, carpentry works began, such as ceilings, cabinet installation, etc.; After that, install lamps, switches and sockets; Finally, install the bathroom, kitchen supplies, floors and walls.

6 answers2024-07-13

Before the supervision company signs the contract with the decoration company, the first review of the decoration company's procedures are complete, whether it is legal and valid, if the customer insists on inviting the decoration team without procedures, the supervision company will not be jointly and severally liable. If the customer entrusts a formal decoration company, the supervision company will supervise the construction company to repair and rectify the quality problems after the end of the project, and the warranty period is free of charge. >>>More