The first stage of villa renovation construction: civil works.
It mainly includes the removal of walls, the replacement of door and window frames, the installation of bathing facilities, the erection of partitions, the renovation of plumbing facilities and urinals, the laying of hidden pipes on walls, the laying of floor tiles, and the tiling of tiles. This stage is the most important stage, which belongs to laying the foundation, and the construction personnel need to be serious. Do a good job of each link carefully to prevent unnecessary trouble.
The second stage of villa renovation construction: grassroots treatment.
It mainly includes carpentry work such as doors, door and window covers, curtain boxes, radiator covers, baseboards, furniture, etc. Wall scraping putty, leveling, and some modeling foundation work. At this stage, it is important not to forget to carry out the acceptance of some concealed works.
Taking the door as an example, MDF or blockboard is generally used as the base material, and then the red beech and other decorative panels are pasted on it, and it is necessary to accept it when doing the base layer, otherwise after the decorative board is pasted, what is inside can not be seen.
The third stage of villa decoration construction: detailed processing.
Mainly paint and coating, as well as other finishing touches such as doorknobs, switches, outlets, etc. If the wall and top surface treatment are uneven, they need to be sanded and painted again. This stage is very important, because whether the decoration workmanship is fine or not, and the effect does not mainly depend on this stage.
Therefore, do not rush to rush the construction period, and at the same time prevent the construction personnel from being lazy, such as painting only two or three times.
-
If you want to find a decoration company for commercial space decoration, what is the specific process? Next up should be decorated.
Tell you about the renovation process
1.The construction drawings should be determined in advance: it is necessary to negotiate with the owner in advance, some of which need to be approved by the property for construction, and some regulations need to go to the housing authority for approval of construction, and the approval time is roughly about 7 days.
2.Knock on the wall to repair: Arrange it before renovation.
3.Hydropower Engineering:
1) The acceptance of hydropower materials and the need to sign (customer or person in charge) 2) When choosing tiles during construction, bite each other and (customer designer) in advance to confirm so as not to cause unnecessary obscurity.
3) Wang Gong acceptance signature and take photos for acceptance (customer leader) 4Cement Engineering:
1) When the kitchen is completed, the whole cabinet must be accurately lofted (customer) 2) The bathroom is completed, and the ceiling must also be accurately lofted (customer) 3) The completion acceptance needs to be signed, and the customer or the person in charge can do it.
5.Carpenter engineering: During the construction period, it is necessary to purchase handles, clothes rods, trouser hangers and other hardware.
6.Paint project: during the purchase of lamps, sanitary ware, switch panels, wallpaper, soft decoration, etc. (this kind of customer or tooling designer needs to be selected in advance).
7. Installation and repair of water and electricity.
8.Completion acceptance is signed and photographed for acceptance (customer and person in charge).
-
The decoration expert said that there is a bit of a spectrum, and the others are simply playing at home, and it is estimated that your project is not big if it is within 2 million, then it will be according to what I said.
1. The design must be fine (down to every point), and it is not possible to ask someone to get it. 2. The budget should be more detailed, don't forget to take the fee, there is no ** to take the fee, it is impossible to do tooling. 3 Payment Methods 3-5-2. 4. When the money arrives, only the materials in front of you are bought, and the work will be stopped when the money is not paid.
Important points after entering the venue: 1. Fire-fighting facilities, sand, water, etc. are available and smoking is prohibited. 2. Prevent anyone from resting at the construction site (the state does not allow) 3. Divide into supervision foreman, small foreman, squad leader and 2 shifts of workers, 2 regular meetings a day, must be constructed according to the drawings (even if it is wrong), supervision 2 times a day (supervision has a book, according to the standard implementation) will focus on the connection of various types of work, several safety. 4. Accept and sign one by one in stages, 5. Do a good job of the drawings of the concealed project, 6. Unified acceptance, 7. Completion.
The workers' are: first civil engineering - water and electricity, ventilation, fire protection - concealed engineering--- make drawings --- wood--- oil --- tile--- water and electricity, ventilation, fire protection - cleaning.
If the project is "good", it should be the Luban Prize.
-
Customer door-to-door consultation - designer door-to-door measurement - preliminary plan - determine the plan (delivery of the first paragraph) - construction team entry (medium paragraph. Balance payment) - Completion.
The basics are similar to home improvement.
-
Hello, 1Drawing triage, 2Commencement date, 3Workers enter the site, material procurement enters the site, and then the groundbreaking ceremony, construction, and finally completion
-
When decorating the house, there are many construction methods, which can not be decorated at once, but what are the lifting and carrying processes during construction, and there are things to pay attention to when building in home decoration, I don't know much about these, thenAll processes of the home improvement construction processOne. All processes of the home improvement construction process
1.The home improvement construction process has, that is, the project disclosure, the owner is present, the designer and the worker docking the disclosure, in the disclosure, how the house should be decorated and the worker to explain clearly, but how to solve some problems during construction, the designer will explain to the owner.
2.The home improvement construction process has, as well as after the disclosure, the workers began to build, first of all, to smash the wall, to remove the wall where it needs to be rectified, it should be noted here that some walls can not be demolished, such as: load-bearing walls, concrete walls can not be demolished.
3. The home improvement construction process hasThe construction of water technology should be done in the construction of water pipes: strictly follow the principle of left hot and right cold; In strict accordance with the national construction standards, there is no explosion, bubbling, dripping and leakage above the pressure test pump above the pressure test pump connected to the hot and cold water pipe.
4.The home improvement construction process has, electricity construction is carried out, after the construction of electricity, the electricity test should be carried out, the bulb is used to test whether the power is on, the bulb is not bright, check whether the terminal is insulated, and the strong and weak electricity must be tested.
5.Home improvement construction process, after the completion of water and electricity construction, the bricklayer is to pave the floor wall tiles, to pave the good look depends on the construction master's technology, generally when laying the floor, the reed hole is first laid to see if it is just suitable, those extra places are cut.
6.The home improvement construction process is there, and after the bricklayer is completed, the carpenter will enter the site. Carpentry is mainly to do the top modeling and wall modeling of the substrate, only the substrate is done well before the next step of construction, in the carpentry construction to pay attention to the noisy rust treatment.
Two. Attention needs to be paid to home improvement construction.
1.When home improvement construction, it should be noted that most of the construction personnel need to be supervised by you at any time, because their work is calculated on a daily basis, even if there is a specified time in the contract, but they will not work very seriously, so you should go to see more, especially to communicate with the construction personnel frequently.
2.When home decoration construction, we should pay attention to the construction of some homes, especially the construction protection measures are very critical things, such as the entrance door should be wrapped with pearl cotton, and it should be wrapped more tightly, and the paved window sills and the ground should also be properly protected.
3.When home decoration construction, we should pay attention to specific negotiations according to the construction situation at any time, because when we are in home decoration, the increase and decrease of the construction process are normal, so we have to ask the ** according to the actual situation, and then write it out in black and white.
At the time of home improvement construction, we don't know what are the processes of all processes, and what should be paid attention to, the above article is about all the processes of the home improvement construction process and home improvement construction needs to be paid attention to.
-
Kiss! Hello, happy to answer your <>
The various processes of pro-decoration construction are as follows: 1. Pre-designPre-design is a very important step before decoration, it is best to find a professional designer, tell the designer your ideas, and then communicate and improve, and design your own satisfactory plan. 2. The main body is demolishedThe main body renovation is a major project in home decoration, and it should be noted that the load-bearing walls and important structures cannot be changed arbitrarily, as long as some reasonable demolition and construction are carried out to prepare for future decoration.
3. Hydropower transformation is followed by hydropower transformation, hydropower transformation is very critical in home decoration, to prepare a variety of cables, switches and sockets, and sinks and other materials, and must choose high-quality materials. 4. Carpentry, masonry and painting engineering housing decoration are the dirtiest first, and carpentry, masonry, painter are very dirty, masonry is the masonry project that people often talk about, we should prepare tile materials in advance, paint engineering is wall putty and waterproof coating and topcoat are ready. 5. Ceiling installation: The ceiling installation should be very serious, otherwise it will affect the effect of the entire home decoration, and in addition, we should pay attention to the installation of lighting and exhaust fans to prevent later changes.
6. The installation of lamps and lanterns should be fully equipped when purchasing lamps and lanterns, and the downlights and wall lamps should be selected according to the interior design to avoid inappropriate installation. 7. The quality of the hardware purchased by everyone must be good, because the hardware purchased poorly affects our daily life in the future. 8. After the completion of the pioneer cleaning home decoration, it is necessary to carry out the work of pioneer cleaning, if you don't have time, you can ask a professional cleaning aunt to clean up the dead corners of the home.
9. After moving in furniture or household appliances, it is necessary to buy household appliances, and you must choose according to the decoration style of home decoration when purchasing, so that the effect of matching will be better. 10. I hope my soft decoration can help you <>
Do you have any other questions?
First of all, according to the interior design drawing, the wall is demolished and the wall is built; The next step is hydropower engineering and ceiling slotting, and at the same time the pipe wiring; After that, carpentry works began, such as ceilings, cabinet installation, etc.; After that, install lamps, switches and sockets; Finally, install the bathroom, kitchen supplies, floors and walls.
1. The design of industrial standard plant must implement the relevant national guidelines and policies, so as to be technologically advanced, economically reasonable, safe and applicable, ensure quality, and meet the requirements of energy conservation and environmental protection. >>>More
Mix ratio of perlite cement mortar].
4. Mix ratio of cement perlite: 168kg of cement per cubic meter; Perlite; Water; >>>More
Before the film. Before applying the film, make sure that the working environment is dry and dusty, and cover the necessary areas of the vehicle. >>>More
The general order of brick wall masonry is to copy the flat, pay off, place the bricks, stand the number of leather rods, plate corners, hang the line, masonry, hook joints, and clean.