When should the lamps be installed when they are renovating?

Updated on home 2024-07-13
11 answers
  1. Anonymous users2024-02-12

    The first caseIt's a chandelier installed. It is believed that the installation of the chandelier has been completed with the latex paint on the roof, or the decoration of the ceiling surface layer of the ceiling in our home has also been completed. Personally, I think that in the process of installation, because the chandelier is a boom, it will not pollute the surface, so it can be installed after all the surface layers are completed.

    The second caseIt is the ceiling light that is installed. Personally, the opinion given is that the ceiling lamp needs to be installed after all the decoration of our surface layer is completed. For example, we have to finish painting latex paint on the top plate, and latex paint has to be finished.

    Because the ceiling lamp is directly installed with the top plate, if we come to brush the latex paint after installing the ceiling lamp, it is easy to cause the pollution of the lamp. Or you can install the base of the lamp and paint it after it is protected.

    The third caseIt is the installation of home downlights. The downlight installation is a hole in our ceiling, so when the downlight is installed, all the coatings for our interior decoration should be basically completed. Because the downlight is installed directly in the pre-made hole, it will not pollute the material of our surface decoration.

  2. Anonymous users2024-02-11

    It is most appropriate to install lamps and lanterns before doing indoor cleaning and before entering the furniture after the decoration construction is about to end and the wall is opened and installed, because the lamps need to be installed with an electric hammer.

    There is also a lot of dust generated by drilling and fixing, and there are some other factors that will illuminate the damage to the top wall when installing the lamp, and the painter needs to repair it from scratch.

    If there is a problem after the decoration construction personnel have completely completed the acceptance, it is relatively troublesome to find someone.

    Did the landlord buy the lamps? Way.

    Can I suggest to you the lamps in Zhongshan Ancient Town? Like the previous decoration of the home, I also bought it there, the spotlight downlight bought by NVC, the chandelier and ceiling lamp bought by Huanguan.

    It's been almost 2 years, and the quality is still good.

  3. Anonymous users2024-02-10

    It is necessary to wait for the paint to be painted and installed.

    The general renovation process of the house:

    1. Preliminary design and construction contract signing.

    2. Demolition and modification of the main body.

    3. Hydropower transformation.

    4. Carpentry. 5. Tiling.

    6. Paint the wall.

    7. Water heater installation.

    8. Kitchen and bathroom ceiling.

    9. Cabinet installation.

    10. Smoke machine stove installation.

    11. Wooden door installation.

    12. Floor installation.

    13. Pave wallpaper.

    14. Open the socket installation.

    15. Installation of lamps and lanterns.

    16. Hardware and sanitary ware are installed on the ridge.

    17. Curtain rod installation.

    18. Pioneer cleaning.

    19. Furniture enters.

    20. Household appliance installation.

    21. Home accessories.

  4. Anonymous users2024-02-09

    Things to pay attention to when installing lamps::

    1. In the process of lighting installation, the control switch is very important, the lighting fixture installation needs to install the switch separately for control, the combination lamps can be controlled in groups, and the dual control switch can be installed as needed.

    2. When the fluorescent lamp is concealed, the installation position of its accessories should be convenient for maintenance and repair.

    3. If there are multiple downlights on the chandelier, they should be installed according to the design drawings. The installation of the chandelier also needs to be installed according to the material of the chandelier, for example, the ceiling is a light steel keel gypsum board fireproof material, when the lamp can be directly installed through a hole, if it is a wooden structure ceiling, it must be fireproof and heat-insulated at the lamp hole.

    4. When ordinary ceiling lamps use soft wires to make hanging wires, they are only suitable for lamps and lanterns with a weight of less than 1kg, and lamps and lanterns greater than 1kg should use hanging chains.

    5. Matters needing attention when installing the ceiling lamp When the weight of the ceiling lamp exceeds 1kg, it is advisable to install the expansion bolts on the original ceiling.

  5. Anonymous users2024-02-08

    The time it takes to renovate the andon depends on the specific renovation progress and individual needs. Generally speaking, the best time to install an endon is in the later stages of renovation, that is, the basic decoration work such as walls, floors, ceilings, etc. has been completed, and the circuit wiring and socket installation have also been completed. This ensures that the installation of the luminaires is not distracted by other renovation work, and that the rolling line also allows for a better selection of the right luminaires.

    The specific decoration of the house can be calculated here, just enter the area + city, calculate the decoration in 3 seconds, know the real ** in advance, and easily grasp the decoration company: [Click here, free decoration**].

    When choosing the time to andon, you also need to take into account your personal needs and renovation plans. If you wish to move in as soon as possible after the renovation, you can choose to install the lantern as soon as the basic renovation work is completed. If you have higher requirements for the selection of lamps and lanterns, you can buy lamps and lanterns before preparing the shirts, and wait until the basic decoration work is completed before installation.

    As for the ** range of andon, it mainly depends on factors such as the brand, material, function and design of the lamp. Generally speaking, the lamps on the market range from tens of yuan to thousands of yuan. The more common ceiling lamps, downlights and other basic lamps are relatively low, generally around a few hundred yuan.

    Some high-end lamps such as chandeliers and wall lamps with a strong sense of design and more functions will be higher.

    Finally, it is recommended to take into account your own decoration style and personal preferences when choosing lamps, and also pay attention to the quality and safety of lamps. You can compare different brands and models of lamps and lanterns and choose products with higher cost performance. In addition, it is best to ask a professional electrician to operate the lamps when installing them to ensure safety and reliability.

    Finally, it is recommended to recommend our "Tuba Rabbit", Tuba Rabbit has 110,000 decoration companies and first-class businessmen in his hands, and the direct sales of building materials are affordable. Tuba Rabbit is selected for decoration, and Tuba Rabbit can accompany the signing of the contract for free, "decorate first and then make payment", reducing the worries of the owners. For more decoration information, welcome to visit:

    Click to enter, professional customer service free consultation good company].

  6. Anonymous users2024-02-07

    It is necessary to wait for the paint to be painted and installed.

    The general renovation process of the house:

    1. Preliminary design and construction contract signing.

    2. Demolition and modification of the main body.

    3. Hydropower transformation.

    4. Carpentry. 5. Tiling.

    6. Paint the wall.

    7. Water heater installation.

    8. Kitchen and bathroom ceiling.

    9. Cabinet installation.

    10. Smoke machine stove installation.

    11. Wooden door installation.

    12. Floor installation.

    13. Pave wallpaper.

    14. Switch and socket installation.

    15. Installation of lamps and lanterns.

    16. Hardware and sanitary ware installation.

    17. Curtain rod installation.

    18. Pioneer cleaning.

    19. Furniture enters.

    20. Household appliance installation.

    21. Home accessories.

  7. Anonymous users2024-02-06

    Generally speaking, the lamps are installed after the latex paint is brushed. If the lamps and lanterns are installed before the latex paint, one is that some large chandeliers will affect the construction of the latex paint, and the other is that the lamps and lanterns need to be protected to avoid fouling the lamps during the construction process, so the lamps and lanterns are generally installed after the latex paint is completed.

    If you choose a lamp, you can take a look at the "First Lantern Museum", **search for it.

  8. Anonymous users2024-02-05

    1. Wait until the floor on the ground is finished.

    2. Then apply the wall paint (latex paint).

    3. At this time, you can install various equipment, including lamps and lanterns.

    Decoration sequence: first do water and electricity, ground and wall, paint, then install lamps and lanterns, and enter the furniture.

  9. Anonymous users2024-02-04

    You can, downlights are installed on the gypsum board ceiling, and the lower spacing should be readjusted, and the gaps should be repaired, and the large chandelier installation should be placed in the back, and it is best to do some protective measures and then brush the top coat after installing the lamp.

  10. Anonymous users2024-02-03

    After the wall paint is painted, you can install lamps and lanterns, too early to affect the construction of the workers, and it is the most suitable to finish brushing the wall.

  11. Anonymous users2024-02-02

    You can install the lamp after the paint is finished, you can take care of the lamp in advance, he should remind you to choose the lamp well, not to install the lamp immediately.

Related questions
6 answers2024-07-13

Eating bananas on an empty stomach can induce myocardial infarction The best time to choose not to be hungry or eat half an hour after a meal Experts say that bananas are rich in sugar and fiber, which are good for digestion and laxative. However, eating bananas on an empty stomach is not good for health, because on an empty stomach, there is almost no food available for digestion in the gastrointestinal tract, and if you eat bananas at this time, it will speed up the movement of the stomach and intestines, promote blood circulation, increase the load on the heart, and easily lead to myocardial infarction. Experts remind that do not eat bananas on an empty stomach, and generally choose to eat bananas after meals or when they are not hungry Bananas are cold fruits, which have the effect of bowel and defecation, if you have diarrhea, you must not eat it, otherwise it will make matters worse! >>>More

21 answers2024-07-13

It should be more than 8 months old, at this time the body is very easy to get tired, and resting at home can protect your body well.

11 answers2024-07-13

It's still fun to grow your own pomegranate trees. If you grow some of them as ornamental plants, you can transplant them once in one of the four seasons of the year. If it is used for large-area fruit cultivation, it is best to schedule the transplantation during the dormant period before germination and after the leaves have fallen. >>>More

20 answers2024-07-13

There are many small details to pay attention to in the decoration of a new house, such as the number and location of switches and sockets. Most of the owners who belong to the decoration novice know nothing about this, resulting in the end of the home is full of sockets, wires are all over the ground, which is really ugly and inconvenient. So, how many sockets are suitable for home? >>>More

15 answers2024-07-13

According to the regulations, it should be settled at the time of work handover, but generally the unit will settle it when the salary is paid in the next month. >>>More