1.The tender notice or invitation letter issued by the owner can also be viewed online.
2.According to the tender announcement, register with the bidding company and purchase prequalification documents.
3.According to the requirements of the prequalification documents, complete the production of the prequalification documents and submit them to the bidding company for pre-examination within the specified time.
4.After passing the pre-examination, to be notified by the bidding company, the bidding documents are purchased, and the technical plan and bidding documents are written after the bidding documents are purchased (Note: strictly in accordance with the requirements of the bidding documents. It can only be higher than its requirements, not lower than its requirements).
5.Complete the production of bidding documents at the specified time, and open the documents on the day of bidding, and conduct bidding.
6.Within three days after the completion of the bidding, the bidding company will notify or publish the bidding results on the Internet.
7.The owner contacts the winning bidder and signs the contract. And the bidding company will issue a notice of winning the bid.
-
What are the bidding processes? Tender**! Tender preparation! Bidding Making!
-
It should be the same as any other bidding process!
-
It's the same as construction, but the qualifications you require should be the qualification of power engineering construction level 3 or above, or directly on water conservancy and hydropower, and you don't have to be too detailed. Refer to the construction process for others. No change.
First of all, it depends on whether the person starts the bidding, and then you go to sign up for prequalification and purchase a set of prequalification documents.
In the process of submitting the prequalification letter. If you are qualified, you will directly purchase the bidding documents. According to the content of the bidding documents, make a tender and hand it back, and pay a certain deposit.
That's it. Probably the specific process, explained in detail, maybe you don't understand it. That's all there is to it.
-
It's no different from the usual civil construction.
It's the same.
-
Normally, the main thing to look at is a few points:
1. Whether your bidding unit meets the requirements (including whether all kinds of certificates are complete);
2. Whether to receive the bidding documents and submit the bidding documents in strict accordance with the time;
3. Whether the bidding documents meet the requirements (including the formulation of the three measures, the construction period, the design drawings, and whether the main materials and auxiliary materials used are products certified by the power department);
4. Is there an advantage?
5. If it is a competitive negotiation, it is necessary to have a person who is familiar with the business and has excellent eloquence to lead the team. That's basically it, in fact, the most important thing is whether there is any contact with the person in charge of the construction unit, after all, it is China's national conditions.
Decoration engineering refers to the construction of housing construction including plastering, painting, grouting, glass, pasting, finishing, cover panel and floral decoration and other processes of the decoration project of the tenderer through the issuance of a bidding announcement, inviting the construction bidder with construction decoration requirements to bid for the act. What are the basic functions of engineering decoration bidding? >>>More
1) Bidding scope and management agency with Chinese characteristics; >>>More
Electronic bidding is a bidding and bidding activity completed in the form of data messages. The general process is as follows: >>>More
A proposed project is a project that wants to be built, or is in the process of being conceived. >>>More
Electrical Engineering (English: Electrical Engineering), abbreviated as EE, is the core discipline and key discipline in the field of modern science and technology. >>>More