For civil engineering or equipment installation, please enter, and what are the three types of const

Updated on society 2024-07-02
14 answers
  1. Anonymous users2024-02-12

    1. In fact, you are not very mature at this time, and you just go out to exercise your social experience and accumulate professional knowledge.

    2. Since you are a project manager and a civil engineering direction, it is recommended that you first engage in civil engineering management, but also participate in the installation and management of equipment, after all, these two major divisions are closely linked.

    3. If you learn civil engineering, then installation is difficult for you, especially the knowledge of electricity, which is difficult for you to master in a short period of time.

    4. Since it is an internship, don't worry about the salary, you can give as much as you want, or you can not give it. After all, you are a novice, and people provide you with a platform to learn, so working hard to learn experience is the most important thing, of course, some units will give a little salary, just a few hundred yuan.

    5. As for the future, it is recommended that you do whatever you study, and don't lose your major. The business of architecture is based on experience, and you will understand it when you are older.

    Hope it helps!

  2. Anonymous users2024-02-11

    This is not about the future, many people will ask this question, but now everything has to be done, right? No matter what you do, as long as you do well, you will have room for your own development, what is the future you are talking about? Have you ever thought about this question?

    Does it mean that there is more money? In fact, really capable people will not be afraid of no future, different places in civil engineering also have different treatment, but what do you think of yourself, which one do you think is more suitable for you? Which one you are more confident and interested in, only you know?

    As for the salary, I also said, different places have different treatment, different abilities also have different treatment, you are only a junior, just belong to the internship, as an intern what kind of treatment do you want, the treatment is set by others, do you think you have the ability to negotiate this condition now? Internships are for you to consolidate what you have learned, or for you to accumulate some experience, the salary of the internship is low, but if you do well, maybe people will hire you, and the salary will not necessarily be low at that time.

  3. Anonymous users2024-02-10

    There are three types of construction sequences:

    Sequential construction. Parallel construction.

    Flow construction.

  4. Anonymous users2024-02-09

    I can tell you about cold storage, and I know a little bit about the rest.

  5. Anonymous users2024-02-08

    The materials shall be bound into a book and delivered to Party A. Of course, the most important thing is the on-site acceptance.

    Foundation handover acceptance, equipment in place, bus installation, cable laying, control system equipment installation and control line laying.

    High-voltage equipment should be tested and tested according to relevant regulations, such as insulation, absorption ratio, phase sequence, transformer oil, etc., and provide test reports, and then debugging, you can first do control system action debugging, in the charge of a debugging, and finally with load debugging.

    In the process of debugging, the control electrical equipment can be simulated and debugged in advance, and some analog signals can be provided to see whether the associated actions are accurate and timely responding. Finally, the delivery information should be synchronized with the progress of the project and signed in time.

  6. Anonymous users2024-02-07

    As-built materials include: construction drawings, design changes, and concealed engineering records; The factory certificate, instruction manual and test report of the raw materials and materials used, and the intermediate acceptance report;

    The above information shall be bound into a book and delivered to Party A. Of course, the most important thing is the on-site acceptance.

  7. Anonymous users2024-02-06

    Simple things, don't get complicated. It's just a process handover between departments.

    1.The foundation of the civil engineering equipment has been watered, and the "process handover sheet" or "civil engineering delivery and installation sheet" is printed according to the format of each unit.

    2.With your list, notify the professional person in charge of the installation department, as well as the person in charge of the quality supervision of the project, to the site to check and accept the equipment foundation: appearance quality, elevation, hole size, etc.

    3.All parties who pass the acceptance shall sign and retain a copy of each, and the civil engineering shall be delivered and installed.

    The installation and delivery of civil works procedures are the same, but the name of ** is installation and delivery of civil works or process handover.

  8. Anonymous users2024-02-05

    1.Prepare the materials.

    Construction drawings, design changes, and acceptance records of concealed works; The raw materials used, the factory certificate of the materials, the instructions and the (steel and concrete) test report, the intermediate acceptance report; Generally, these documents are made with the progress of the project, and the relevant personnel (technician, project leader and supervisor) must be signed.

    2.Acceptance and handover procedures.

    It is also necessary to accept the site on site, and sign a handover agreement with the party of the equipment after passing the acceptance.

  9. Anonymous users2024-02-04

    Under normal circumstances, there is a civil engineering unit to carry out construction in accordance with the drawings, and the installation unit to carry out acceptance and sign the handover order.

  10. Anonymous users2024-02-03

    If the equipment is supplied by A, then the total construction contract price is 1000w, and the construction unit only pays the corresponding part of the fees and taxes, that is, 1000 * (1 + fee tax rate) * (1 + comprehensive tax), the fee includes the project sewage fee, five insurances and one housing fund, etc.), and the tax project is in the urban area) (including business tax, urban construction and maintenance, education surcharge, local education surcharge).

  11. Anonymous users2024-02-02

    The installation scope of industrial equipment installation is very large, that is, all industrial equipment is installed, such as petrochemical, chemical fertilizer, pesticide, cement and mineral ....... Civil building installation is only the installation of building-related equipment, such as water supply and drainage, fire protection, air conditioning HVAC, strong and weak electricity (building intelligence) ......Of course, generally enterprises with the installation of industrial equipment can install building installation, on the contrary, it is not certain. In the end, it is determined by the business scope specified in the business license of the enterprise, not by the name of the enterprise. ‍

  12. Anonymous users2024-02-01

    There are requirements on the drawings to be done according to the drawings, generally speaking, which professional drawings should be done in which specialty. But I personally think that it should be done by civil engineering (whether the installation unit does it depends on whether the contract is agreed). Just like the slotting of the wall line pipe, the civil construction is plastered to strengthen the steel wire mesh.

    This can be negotiated with the construction unit to apply for an economic visa.

  13. Anonymous users2024-01-31

    Concrete cracking is a civil engineering thing, because the pipeline must go from the inside, and the mesh can also be used, but the civil engineering unit can only put the mesh itself in order to worry about less oil. When you meet a good owner, you can count the money.

  14. Anonymous users2024-01-30

    Personally, I think that it belongs to civil construction, and the installation of hydropower is only responsible for the laying of hydropower pipelines, and the measures to prevent cracking should be handled by civil engineering, and the construction team should be done well before pouring concrete.

Related questions
13 answers2024-07-02

The solution to the computer silence: there are two solutions to repair the system and install the sound card driver with software (first look at the small speaker or see if the mute is set in the control panel, check whether there is sound output through the headphones, if there is, it is caused by the failure of the speaker or speaker, and the sound card driver is damaged, if it is for you to install the sound card driver such as the driver wizard, if it is caused by hardware problems, you can't solve it, it is recommended to overhaul it, please ask me if you have a problem) >>>More

5 answers2024-07-02

There are many reasons for this. It is recommended that you reinstall the system. This is the easiest. Because there are many possible scenarios that tell you. It's easy to reinstall the system. Shortcut. Safe. Stable. Ha ha. >>>More

16 answers2024-07-02

It's completely possible, this professional large number of business is not running around for door-to-door maintenance, more needs or design, drawings and finalization, product performance evaluation, demonstration, procurement, production and assembly, quality inspection, anti-counterfeiting packaging, sales, consulting and answers, there are many jobs suitable for girls to do. Since you fall in love with this major, you will study in this major, which is more conducive to future innovation, better play your own, and produce scientific research results, China's industrial science and technology is far behind the West, and a large number of skilled industrial science and technology talents are still needed for a longer period of time in the next few decades, and a country's industrial development can effectively drive the rapid development of military industry and agriculture, and girls are suitable for learning electrical automation equipment installation and maintenance.

23 answers2024-07-02

The second-stage biological contact oxidation treatment process adopts push-flow biological contact oxidation, and its treatment effect is better than that of fully mixed or two-stage series fully mixed biological contact oxidation tank. Weifang Tianyuan Environmental Protection Technology Co., Ltd. is a high-tech enterprise integrating the production and research and development of environmental protection equipment, and is now the cooperation base of Shandong Academy of Water Conservancy Sciences, and was designated as a key recommended enterprise by Shandong Provincial Environmental Protection Bureau in 2011. The company is located in a well-known"The home of dinosaurs"Shandong Zhucheng is an important transportation hub on the Shandong Peninsula. >>>More