Ask questions about waste management 10

Updated on society 2024-07-09
2 answers
  1. Anonymous users2024-02-12

    First, the goal. In order to ensure the better implementation of the environment, occupational health and safety management in the office and construction area, and avoid environmental pollution due to waste.

    2. Measures. 1. The control of construction waste adheres to the principle of who constructs and who cleans up.

    2. A garbage station should be set up at the construction site, and the construction waste and domestic garbage that cannot be reused after sorting should be removed and transported in a timely manner, and the construction waste and domestic waste must be transported to the approved elimination site for discharge.

    3. The solid wastes generated in the construction and production process, such as welding rod heads, welding slag, oil cotton yarn, oil cotton cloth, etc., should be placed in the designated place of the project department by the construction and production personnel, and stored in a centralized manner and disposed of in a unified manner.

    4. The vehicle transporting garbage is not allowed to be full, and strict covering measures should be taken to prevent spilling, and the vehicle shall not take the mud and sand out of the scene.

    5. The welding heads, scrapped machinery, equipment, vehicle parts, sacks, newspapers, waste paper, steel scraps, etc. produced by the office area, living area, and construction site operations should be stored separately according to the designated place, and the **unit** should be requested in time.

    6. In addition to setting up garbage storage pools in the office area, living area and operation site at the construction site, storage boxes, barrels and pools for reusable waste items should also be set up respectively.

    7. For the items that can be handled by the relevant departments, they should be dealt with in time to avoid secondary pollution.

    8. Waste batteries, old fluorescent tubes, toner cartridges, waste powder, ink cartridges, ribbons, carbon paper, scrapped copiers, computers, paints, straw bags, labor protection supplies, consumables used to protect Qinqin, flashlights, welding slag, refills, calculators, plastic packaging bags, oil cotton yarn, wood, etc., which cannot be reused and allowed to be discharged should be removed and transported in a timely manner. If it cannot be discharged temporarily, it is necessary to designate a storage point, take necessary measures such as fire prevention, moisture prevention, leakage prevention, sun protection, rain protection, etc., and store it in a classified manner, and it is not allowed to burn it at will, discharge it into the water body, bury it in the ground and discharge it with other garbage.

    9. Office garbage such as waste batteries, waste lamps, waste ink cartridges, etc., the purchase department to use the centralized purchase of the first business to sign the "old for new" agreement terms, after the waste of the centralized return to the first business is appropriate, can not be returned to the first business, should be a separate waste site, centralized storage.

    10. The domestic garbage in the office shall be discharged at the location designated by the environmental protection department.

    3. Responsibilities. Equipment and materials department: responsible for signing the first agreement with the supplier and the first part of the waste products; Responsible for keeping the supply vehicles clean in and out of the field, unloading, etc., so as not to pollute the environment.

    Safety management department: supervise and inspect the safe and civilized construction of the construction site and living area, and protect environmental hygiene.

    Fourth, the required materials and budget funds.

    5. Start time and completion time.

    Agreements are signed with the relevant parties before the commencement of the project until the end of the entire construction process.

    6. Verification time.

    Supervision and control are carried out throughout the whole process of construction.

  2. Anonymous users2024-02-11

    Today, the industrial chain of the domestic waste industry has been basically opened, including front-end classification, site and processing plants. The whistle of the game in the waste industry has been blown, and at the front end, the "smart box" mode is more common, that is, the use of unmanned intelligent terminals, taking the form of classified cabinets, garbage bins, garbage kiosks, etc. Generally speaking, the birth of waste products lies in the fact that the use value and commercial value of a product are close to zero, which is the natural end of a product's life.

    However, in reality, there is also a phenomenon of deliberately shortening the life of products, especially in the production of e-waste, many hardware manufacturers may have to bear most of the responsibility.

    Compared with the foreign waste materials industry, the domestic renewable resources industry is still in the market-oriented growth period, showing a steady and positive development trend. According to relevant data, as of the first half of 2018, there are more than 5,000 enterprises engaged in the utilization of renewable resources, more than 3,000 processing plants, and more than 1.4 million employees, about 160,000 all over the country. As of the end of 2017, the total value of China's top ten varieties of renewable resources has reached 100 million yuan, a year-on-year increase.

    Today's waste industry is still in the period of scattered soldiers, with obvious scattered, small, chaotic and polluted characteristics. Extensive operation has greatly weakened the ability of traditional enterprises and employees to resist risks.

    The practical problems of the waste station cannot be avoided, so many places have listed it as "scattered and polluted" to clean it up. However, a "one-size-fits-all" approach to all shutdowns is obviously contrary to market demand, and is not in line with the concept of green development of resource reuse. The author believes that it is necessary to adhere to the principle of combining dredging and blocking, pursuing advantages and avoiding disadvantages, and step up the standardization of the business activities of the waste product annihilation station to ensure the healthy and green development of the waste industry.

    The aging of an industry will gradually weaken the industry, and the same is true for the waste industry. However, the defects of waste products** are not limited to aging. The waste industry is to make a profit by using reusable resources, and the efficiency and volume are the direct factors affecting its income, but at present, the efficiency and volume of the industry are low and small.

    The aging of the industry is only one of the reasons, but its pain point is in the best way. There are two traditional ** modes, one is the ** way of the old man riding the tricycle mentioned above, and the other is the waste ** station that collects the old man's waste later. Although the former has a low cost, it relies on the weather to eat, and the time consumption is huge.

    The latter is limited by area and the cost of the site is high.

    Aging and low efficiency will undoubtedly make the waste market gradually sluggish, but the current waste industry is booming due to the opening of the era of environmental protection.

Related questions
6 answers2024-07-09

Solid Waste Disposal Level B Personnel Requirements:

Registration: Level 1 Registration Structure 1 Registered Power Supply and Distribution 2 Registered Power 2 Non-Registered: Environmental Protection Intermediate 4 Environmental Protection Senior Engineer 1 Machinery Advanced 1 Automatic Control Advanced 1 Budget Estimate Intermediate 2 Handling Process Step 1 Industrial and Commercial Registration. >>>More

20 answers2024-07-09

It doesn't belong. Medical waste refers to the waste with direct or indirect infectiousness, toxicity and other hazards generated by medical and health institutions in the course of medical treatment, prevention, health care and other related activities. Catalogue of Clinical Waste Classification >>>More

10 answers2024-07-09

Solid waste treatment usually refers to the process of converting solid waste into suitable for transportation, storage, utilization or disposal through physical, chemical, biological, physicochemical and biochemical methods. The goal of solid waste treatment is to make it harmless, reduce, and recycle. The main methods currently used include compaction, crushing, sorting, solidification, incineration, biological treatment, etc. >>>More

25 answers2024-07-09

In order to reduce the damage of garbage to the environment, we can pay attention to garbage classification in daily life, or do not litter.

7 answers2024-07-09

Bearing in mind that Environmental Technology (Shanghai) **** is a resource recycling enterprise, in the field of harmless destruction and demolition has a good reputation and technical support, we uphold the concept of environmental protection for its business, to maintain the green home for the purpose, over the years our service by the trust and support of our customers, new and old customers continue to grow is the driving force for our development, in 2017 our service costs reduced by 10% to give back to our customers trust and support, On the eve of the new year, I bring all the staff to wish everyone a long and healthy life and a happy family.