In terms of employment difficulty, it is still good for construction engineering technology to be employed, and it is easy to find a job on the construction site. Architectural design generally goes to the design institute but it is more difficult to find, and the general design institute will not ask for college students, as long as there is experience and certificates.
If you have a relationship with your family, report the architectural design, after all, this is a bit larger. If it doesn't matter, let's go to construction engineering technology, and it's more practical to go to work first.
-
To put it in layman's terms, after graduating from architectural design, they basically work in the design institute, and the engineering technology generally works at the construction site. Engineering technology is on the front line of the field, and people who can bear hardships and stand hard work must be able to do it!
-
Architectural technology design is understood in the name, focusing on the things in the early design stage of the construction industry, while the latter is focusing on the on-site management of construction technology, which is better, lies in personal interests and hobbies.
-
Your question is not clear. Is it architectural engineering design and architectural engineering technology? In this way, the architectural engineering design is naturally better, because the technology is on the first line.
-
Obtain a bachelor's degree or above in other engineering majors, and have been engaged in the engineering design of potato beam electrical majors for 1 year, you can register for the basic examination sail slag test. After passing the basic examination, and having a bachelor's degree or above in other engineering majors, and having been engaged in electrical engineering design for a total of 8 years, you can apply to participate in the professional examination.
-
After obtaining a bachelor's degree or degree that has passed the education evaluation of this major, he has been engaged in electrical engineering design for a total of 4 years; or have been engaged in electrical engineering design for at least 5 years after obtaining a bachelor's degree or degree that has not passed the professional education evaluation; or after obtaining a bachelor's degree or degree in a similar major, he has been engaged in electrical engineering design for a total of 6 years.
-
The main thing is the size of the water-cement ratio.
The water-cement ratio is large, and the collapse degree is large.
The water-cement ratio is small, and the degree of collapse is small.
Of course, it is also related to the particle size of the stone, the parameters of the sartan seed, and the amount of admixtures.
-
Your understanding makes a lot of sense!
If you must follow strict performance management, then you must have a set of performance management evaluation standards to score!
But strictly speaking, it is both cost and schedule!
From the preliminary investigation to the project approval to the implementation, to the final summary, there are actually many nodes in the process, and each node is done well, and the high performance of the project will come out!
-
If the foundation is not accepted, the construction of the main body can be carried out before it is concealed, but conditions should be created to strive for early acceptance. Generally, after the strength report of the foundation concrete test block is obtained, it should be carried out.
-
It is not possible according to the regulations, but it is not impossible to fully negotiate and agree with Party A, supervision and quality supervision departments on this matter.
-
Hello, for you to answer the foundation is not accepted, before the main body of the construction can be carried out, but we should create conditions for early acceptance. Generally, after the strength report of the foundation concrete test block is obtained, it should be carried out.
Hope it helps.
There is also another: in general, in principle, the main construction can only be carried out after the acceptance of the foundation division is completed. However, in the actual construction process, after all the materials of the foundation division project are complete, the construction acceptance will be organized. The main body above can be constructed first.
Questions. Now that the backfill has been completed, the foundation of the quality inspection station has not been accepted, and the rebound is also qualified, how to deal with this situation.
You can look for a testing unit.
Questions. Now the quality inspection station asks us to find a third party to provide valid results.
The testing unit is finished with testing.
Gray bullets are all qualified.
In this case, the construction process is not followed, and the construction period may be blindly rushed; If there is no detection, only the backfill compaction test can be done according to the requirements of the quality supervision station; Let the construction unit handle it, after all, they are the first responsible party; It is enough to do a good job of filing with the quality supervision station. Hope it helps, thank you ---
Questions. The quality inspection station mainly said that they did not see the foundation.
Then you can only find a third party to issue valid results.
According to the requirements of the quality inspection station.
Questions. Thank you.
Hope it helps.
-
The Department of Electronic Information Engineering of our school is divided into two majors, namely Electronic Information Engineering and Communication Engineering. In fact, there is not much difference, only the major electives in the senior year are different. What do you mean by engineer?。。
P.S. Our school is HUST Huazhong University of Science and Technology.
Urban area scope (urban area: general prefecture-level cities are the counties under their jurisdiction; Every city has a city district.
Know (is a search-based interactive knowledge quiz sharing platform, released on June 21, 2005, and moved to the official version on November 8, 2005. Different from the search services that people are used to, "knowing" is not to directly query the content that already exists on the Internet, but to ask questions according to the specific needs of the users themselves, and mobilize other users through the point reward mechanism to create the answer to the question. At the same time, the answers to these questions will be further used as search results to provide other users with similar questions to achieve the effect of sharing knowledge. >>>More
Because of the incomprehensible construction process of the pyramids, all the pyramids are built from tons of boulders piled together, if you use modern technology is not difficult, but if you put it in ancient times when all conditions were not developed in all aspects, such a building will inevitably feel strange.
To put it simply, one of the most difficult types of skilled immigrants is relative to the provincial nomination, with an IELTS requirement of 8777. >>>More