-
There are many reasons for the large area of hollowing of tiles, if the back of the hollow drum tiles is very clean, and the cement mortar does not fall off with the tiles, it is likely that the details of the construction process are not in place. If the base layer is not dealt with well, the upstairs decoration, the use of gravity tools, such as electric hammers, masons and large bricks, will also lead to empty valleys, so that the walls of the empty valleys will fall. When tiles are paved, workers do not have the process at home, do not make the tile and cement tamped or do not pave the tile densely, will make the adhesion of the tile decrease.
When the seasons change, the large temperature difference will make these problems more prominent.
<> the tile is paved and processed on the wall, and the tile adhesive must be painted to increase the adhesion of the tile. The adhesive is designed because of the vitrified brick, which is a special product of the vitrified brick, and it is a magic weapon to ensure that the vitrified tile is not hollowed out and falls off when it is attached to the wall. Paint the interface agent on the top surface, or the wall is solid, and then use the leveling gypsum to ask the oiler to level it, and the top gypsum can add some glue to increase the compactness of the gypsum.
The thickness of the leveling plaster is not recommended to exceed centimeters. For small areas of tiles, small parts of monolithic tiles, and hollow corners, they can be repaired by grouting or glue injection. If the central area of the tile is hollow, it should be removed and re-installed.
Drill holes in the corners of the tiles (between the two tiles in the reserved gap), drive in the expansion particles, screw in the "capped" screws, and try to make the nuts jam the tiles, so that the screws can firmly stick the tiles on the wall, even if the drum is hollow, there is no need to worry about falling off. To find a way to fill this gap, a small area of corner drums can be filled by pouring cement slurry. However, the adhesion formed by such a filling itself is not enough, and it will definitely continue to appear when it is used in the future.
The wall in the tile construction, are manual work inevitably cause some defects, the tile sometimes appears local slight hollowing, but does not affect our daily use and aesthetics, the location is also in the cabinet cabinet and other furniture behind.
-
The renovation company should be held responsible, let the renovation company be responsible, and negotiate with the renovation company. If the decoration company shirks, we must go to the court to sue and use the law to defend our rights.
-
If this situation occurs, you still have to contact the decoration company in time to see if there is still the possibility of repair, or follow-up compensation, you have to find a way to solve it.
-
In the face of this situation, it is necessary to find a decoration company to solve it, and let the decoration company find a way to solve this problem for itself and reduce a little loss.
-
The new house has dozens of hollow drums, can I still have them?
When there are dozens of hollow drums in a new house, you can't ask for them, and when a large area of hollow drums in a new house, it is a quality problem. It is advisable to go to the developer and ask the developer to show the acceptance certificate of the house. If the developer does not have an acceptance certificate, he has the right to request an extension and require the developer to renovate the new house.
At the same time, if there is a serious quality problem with the house, affecting the residence, the buyer has the right to ask the developer to move out. Therefore, when accepting a new house, it is necessary to comprehensively consider the new house, starting from the walls and floors of the house, starting from the infrastructure, etc., and comprehensively investigate and accept. When there is a problem, make suggestions to the developer in a timely manner and ask the developer to come up with a solution.
Is there any effect after fixing the hollow drum in the empty room?
There is no effect. 1. If you find that the wall of the rough room is hollow, you should first combine the cause and then solve it. In the construction process, it is possible that the water-cement ratio content is relatively low, and the lime content is common again, resulting in the instability of the clay structure, the surface is hard, the phenomenon of hollowing and opening holes appears, and the appearance is easy to produce sand and dust phenomenon when it cracks again.
2.The method is a little more complicated. First, all the sand and ash need to be removed, and the base layer is leveled and ground with cement or cement.
After drying, brush with the interface agent and lay the hanging net. Wait until it is completely dry, 1 2 days, we scrape the putty again, generally 1 2 times. Once scraped, you can paint or paste wallpaper for wall decoration.
When scraping putty, you can also add some glue, but you can choose a certain possibility, which can increase the environmental protection ability of the damaged product and avoid falling off again.
What happens if a blank room is empty and not treated?
1. Affect the appearance. Generally, in the hollow part of the wall, cracks will appear in the plastering layer, just like a scar on the face, which is very glaring.
2. It affects the use effect, loses the enclosure and decoration function, and has potential safety hazards. Large open spaces will fall off due to gravity for a long time, and small losses are smashed floor tiles and floor furniture.
3. Affect the later decoration. The first is the appearance of cracks on the surface of the hollow drum wall. After a while, once the hollow part is stressed, the cracked plastering layer will fall off.
If there are cavities or cracks in places that are in direct contact with external interfaces, such as window sills and balconies, the cracks will inevitably cause water seepage, which will not only reduce the protection of the wall, but also affect the decorative effect.
4. Cause cracking of the wall. If the hollow wall is not treated in time before or during the decoration, it will cause a large area of cracking of the wall after the decoration.
-
I don't think the new house should be able to ask for a dozen hollow drums; It will also have an impact after the blank house is repaired, which is a serious quality problem, and you need to find a developer to deal with it.
-
The blank hollow drum can be repaired first, otherwise the hollow drum is easy to crack and damage after decoration.
-
There are more than a dozen hollows in the new house, but the developer needs to inspect and rework the hollows. If there is no hollowing after the drum is repaired, there is a high probability that it will have no effect.
-
What should I do when I find that there is a hollow drum on the wall, what is the reason for the hollowing, and the reason for the hollowing of the wall of the rough house: during the main construction process, the cement content of the gray layer of the wall is low, and the lime content is too heavy, resulting in poor wall structure and low adhesion, which directly leads to the hollowing and cracking of the wall. This type of wall is commonly known as a "lime sand wall".
The common method of hollowing drum repair is to shovel sand ash, refill it with fast ash, and re-batch putty after drying. But there are some hollows, which are difficult to chisel out due to location and other reasons.
If such problems are found in the house inspection, please ask the house inspector to mark the hollow drum and cracked place on the corresponding wall, and the owner will feedback this problem to the community property company, and ask them to rectify it in time (wipe the hollow drum and cracked place, and re-powder it with cement mortar); In addition, in the decoration and wall construction, the original damaged wall should be covered with a layer of white cement (if the original wall has an insulated wall, this construction process should be added) to enhance the overall structure of the wall, and the cracked part of the wall should be pasted; When applying eco-friendly putty, some glue should be added to increase the strength and adhesion of the wall and structure.
When the tile is not full, the mortar is not full or the tile is not tapped, squeezed. This situation is either to cut corners: to save cement mortar, or to save time.
There is also a situation that occurs when the contractor packs the material, that is, the quality of the tile is too poor, and he is afraid that the tile will be broken when compacted. Not soaked or not soaked enough before paving. Ceramic tiles (glazed tiles) should be soaked in water for more than 2h before laying, and after the tiles fully absorb water, they should be taken out to dry or wipe.
The plastering of the base wall is not standardized, and it is not treated according to the requirements or the grassroots garbage is not cleaned. Before tile paving, check whether the plastering of the wall foundation meets the requirements, and the debris, dust and dirt on the wall foundation must be removed; When paving, apply cement mixed mortar or 107 cement slurry on the back of the tile and tap the tile with a hammer handle or soft hammer to fill the back of the tile, and then press hard to make the tile firmly bond with the wall foundation.
-
A common way to repair a hollow drum is to remove part of the wall surface of the hollow drum and repaint or pave it. Before plastering, the bottom layer is not clean, and the wall is impermeable, resulting in insufficient fit between each layer, so that the plastering loses too much water, causing the base and the plastering layer to not stick firmly and cause hollowing. If the plastering is too thick at one time, there is no layered plastering or the plastering time is too close to each other, and it is easy to have a hollowing situation.
-
Then you can ask the other party to redecorate, and let the other party solve such a problem, so as to meet your own living needs. It may be caused by tile problems, or it may be caused by too much gas in the tile, it may be caused by the wrong way of installing tiles, or it may be caused by the master's poor craftsmanship.
-
We can find his person in charge to carry out the renovation and let him renovate; It's because they cut corners, and then it's possible that the construction is particularly substandard, or it's possible that the developer has a problem when building the house, and they don't take it particularly seriously and deceive customers.
-
It is very common for the walls of new houses to be hollowedAccording to the specific situation of the wall hollow, it is necessary to choose whether to overhaul each wall hollow part. As the owner of the community after obtaining a new house in the housing developmentThe house will be assigned staff to go to the new house with the owners of the community to accept, the new house acceptance project includes whether the wall is hollow, of course, the property management will not take the initiative to inspect this, the property management will check whether the water and electricity of the new house is passable, the windows and doors are not detailed, and the sewage pipe is not smooth These are very obvious things, and as the owners of the community who have obtained the new house know that the house is a big deal for themselves. Therefore, they will find a professional and technical personnel to go to the new house acceptance with themselves, in addition, the decoration company on the spot due to the fierce competition in the field of market, in order to better attract customers to sign the house decoration contract, will also be completely free to help customers in the new house acceptance. Around the floor tiles: hollow out the floor tiles around, and then use special tools for grouting to carry out pure cement paste or tile adhesive grouting, before grouting first pour some water to carry out moisturizing, so that just grouting in, the water of the slurry will be sucked away by the wall and floor tiles, and the remaining dry grout will block the channel, causing difficulties in grouting again.
If the hollow part of the wall is at the upper end of the floor tile, you can tap the floor tile at the same time as the grouting to make the grouting more fully cover the gap position, if the wall hollow drum position is under the floor tile, you can not knock on the floor tile, and the grout will flow out when you knock it. The internal structure of the floor tiles: such a thing, the sealing around the floor tiles cannot be grouted, only the bricks can be replaced. First of all, use a cutting tool to cut the joints around the floor tiles to prevent the adjacent wall tiles from being damaged when prying the tiles. In the actual operation of cutting tools, it is necessary to pay attention to life safety, and it is also necessary to stayDo not damage the adjacent bricks.
After cutting the joints around the bricks, you can be satisfied with the bricks, first remove from the hollow position of the wall, and then gradually chisel around, and remove the information of the previous sticking bricks together, and then paste the tiles again after cleaning the bottom layer. The edge wall is hollow, the edge wall is hollow, and the floor tiles of the wall have a bulge problem. You can start with the side seam, and then beat with the raw materials that were originally used to pave the tiles, such as cement mortar, and pour cement mortar into the edge while beating, so that the cement mortar is slowly spread all over the hollow part of the wall.
-
It must be repaired, and it can be carried out by gluing, or re-paving, which can be solved with a needle.
-
During the construction process, due to the low structure and adhesion in the wall powder layer, the wall surface is hollowed out and cracked, which is often called "sand gray wall". In the construction process, the brushing and maintenance are insufficient or not watered and moistened in advance, so that the plastering loses too much water, and the surface causes the base and the plastering layer to not stick firmly, resulting in hollowing.
If a similar situation is found in the house inspection, you can ask the inspector to mark the location of the hollow drum and cracking on the wall, and ask the developer to rectify it in time. In addition, then re-make a layer of white cement on the original wool damaged wall, the purpose is to enhance the overall structure of the wall, and the hollow part of the wall is treated with cloth, and when the environmental protection putty is draped, part of the glue is mixed to increase the structural force and adhesion of the wall.
Hollow drum problems can also be addressed using perfusion repair. For example, if the AB resin grout is used to repair the cracks, the high-strength adhesive is directly injected into the hollow drum, and then the hollow drum position is filled with fullness. The method of grouting to repair the hollow drum is fast, does not damage the base layer, and will not affect the owner's use much in the construction process, which is a more convenient way.
-
It must be repaired, although it is a bit troublesome, but there will be some safety hazards in the future, such as the wall suddenly collapsed or cracked, and then it will be even more troublesome.
-
For the new house for the delivery, you can actually go to see if the house has any drawbacks, the most important thing is to see the house hollow problem, otherwise there will be a lot of problems in the later decoration. So, can you still ask for a dozen hollow drums in a new house? Let's take a look at the introduction brought by Quding.com!
Can you still have a new house with more than a dozen hollow drums
You can't ask for a new house when there are more than a dozen hollows. It is recommended to go to the developer and ask the developer to show the acceptance certificate of the house, if the developer does not have the acceptance certificate, he has the right to request an extension and ask the developer to re-repair and accept the new house. At the same time, if there is a serious quality problem in the house, and it affects the residence, the buyer has the right to ask the developer to check out, so when accepting the new house, it is necessary to consider the new house in an all-round way, starting from the wall of the house, ground infrastructure, etc., to carry out a comprehensive investigation and acceptance, when there is a problem, it is necessary to put forward to the developer in time and ask the developer to give a solution suggestion.
There is no impact after the blank room has a hollow drum repair
There is no impact. 1. If you find that the wall of the rough house is hollow, you need to combine its reasons first and then solve it. In the process of construction, it may be that the water-cement ratio content is relatively low, and the lime content is common, resulting in unstable structure, solid surface clay, there is a phenomenon of hollowing and opening, in fact, this appearance is cracked and easy to sand ash phenomenon.
2. The treatment method is slightly more complicated, first of all, it is necessary to remove all the sand and ash, do a leveling treatment on the base layer, and grind and level it with cement or cement.
3. After drying, brush the interface agent and lay the hanging net. Wait until it is fully dry, 1 2 days later, we scrape the putty, generally need to scrape 1 2 times. After scraping and flattening, you can paint or paste wallpaper to decorate the wall.
4. When scraping putty, you can also add part of the glue, but you can choose a certain possibility, so as to increase the environmental protection ability of the damaged product and avoid falling off again.
What will happen if the blank room is hollow and not treated
1. Affect the appearance. Generally, where the wall is hollow, cracks will appear in the stucco layer, like a scar on the face, which is very dazzling.
2. It affects the use effect, loses the enclosure and decoration function, and has potential safety hazards. The place with a large hollow drum will fall off due to gravity for a long time, and the small loss is to smash the floor tiles and floor furniture.
3. Affect the later decoration. The first is that there seem to be cracks in the surface of the hollow drum wall. After a while, once the hollow drum part is stressed, the cracked mortar layer will fall off.
If there are hollows or cracks in the window sills, balconies, and other places that are in direct contact with the external interface, the cracks will inevitably cause water seepage, which will not only reduce the protection of the wall, but also affect the decorative effect.
4. Cause cracking of the wall. If the hollow wall is not treated in time before or during the decoration, it will cause a large area of cracking on the wall after the decoration.
In fact, it is better to buy a large area or a small area, it depends on your own needs. >>>More
With an eraser, it was erased.
The volatilization period of formaldehyde is about 3-15 years, and the volatilization period of benzene and benzene series is about 3 years. >>>More
4 to 5 years after handover to find a large areaHollow drumsIf there is evidence to be retained, you can sue the developer to resolve. But if there is no problem at the time of acceptance, and the place that falls off is newly renovated by yourself, then find your construction team, and if it is the original developer's decoration place, find the developer. >>>More
Negotiate with the property that if they are not responsible for repairs, the owner of the floor heating leak does not pay the strata fee. >>>More