Sub-projects. How to fill in the quality acceptance record form.
Answer: The acceptance of the sub-project shall be carried out by the supervising engineer and the professional and technical person in charge of the project. Appendix E is used for the acceptance record of the sub-project. The sub-project is in the inspection batch.
It is carried out on the basis of acceptance and acceptance, usually plays a role of induction and sorting, is a statistical table, and has no substantive acceptance content. As long as you pay attention to three points, one is to check whether the inspection batch covers the entire project and whether there are any missing parts: the second is to check whether the inspection batch with concrete and mortar strength requirements can meet the specifications after the order period; The third is to unify the information of the inspection batch and register and sort it out in turn to facilitate management.
Fill in the form: fill in the name of the sub-project to be accepted and the header of the form.
And the inspection batch parts, sections, the construction unit inspection and evaluation results, by the construction unit project professional quality inspector to fill in, by the construction unit of the project professional technical person in charge of the inspection to give evaluation and sign, to the supervision unit or construction unit.
Acceptance. The professional supervision engineer of the supervision unit (or the professional person in charge of the construction unit) should be reviewed item by item, and the agreed item should be filled in "qualified or in line with the requirements", and the disagreement item should not be filled in temporarily, and then accepted after processing, but it should be marked. Indicate the acceptance and non-acceptance opinions, such as agreeing to the acceptance and signing to confirm, disagreeing with the acceptance, please point out the problems, and clarify the handling opinions and completion time.
-
The sub-project is actually to summarize the inspection batch, and the sub-project is to summarize the sub-project. Fill in the corresponding inspection batch name in order and indicate the quantity. There is a corresponding acceptance officer's signature below.
The sub-project can be signed by the technical person in charge and professional supervisors. The branch project should be signed by the project manager and the director.
-
Depending on each process, the list is not the same. For example, the road should be divided into structures to report elevation, median line, traverse or something. The measurement reports to you the measurement review record, and the experiment reports to you the experiment sheet, you fill in the error according to their list, you look at the acceptance specification, there are all on it.
-
Project acceptance data, including sub-projects. A division project is a summary of a branch project.
For example, a hotel project, air conditioning engineering. Then, the air-conditioning project is the sub-project of the project, and the air-conditioning division can be subdivided into:
Refrigeration and pipeline engineering, air duct production and installation engineering, refrigeration equipment installation engineering, etc., to put it bluntly, in a word, the sub-project is to summarize the "inspection batch" in the process data, fill in the project can be recorded in sections, or fill in layers, as for how to fill in the data inside, only need a cracked version of the "Guangdong Province Construction Engineering Completion Acceptance Technical Data System", how to use it, you will slowly explore how to use, I believe it can help you.
-
When confirming the completion of each inspection batch of the sub-project of the division, fill in the day on the day of reporting to the supervisor for inspection. The date of the acceptance meeting of the branch project shall be filled in as the acceptance date of the branch project.
The quality acceptance of the sub-project shall comply with the following provisions:
The inspection batches contained in the sub-project shall comply with the provisions of qualified quality:
The quality acceptance record of the inspection batch contained in the sub-project shall be complete.
The acceptance of the quality of the sub-project is carried out on the basis of the inspection batch acceptance is a statistical process, and there are some direct acceptance contents from time to time, so it should be noted when accepting the sub-project:
1) Check whether the parts and sections of the inspection batch all cover the scope of the sub-project, and whether there are any missing parts that have not been accepted.
2) Some items that cannot be inspected in the inspection batch will be directly accepted in the sub-project. Such as the evaluation of the full-height verticality and mortar strength in brick masonry engineering.
3) Check whether the content of the batch acceptance record and the signatory are correct and complete.
The main contents of the general project are:
Items with a certain deviation are allowed, and in general projects, with the standard specified in the data, there can be individual deviation ranges, and the checkpoint of no more than 20 can exceed the allowable deviation value, but it cannot exceed 150 of the allowable value.
For items where the deviation value cannot be determined, but a certain defect is allowed, the number of defects is distinguished. If the brick masonry is embedded with tie bars, the spacing deviation is retained; Concrete steel bars are exposed, exposing a certain length, etc.
Some items that cannot be quantified and use qualitative ones. For example, the color of the broken marble floor is coordinated, and there are no obvious cracks and potholes: in the painting project, the bright and smooth project of the intermediate paint, the installation project of the water supply accessories of sanitary appliances, the interface is tight, and the opening and closing parts are flexible; Pipeline interface project, no exposed hemp, etc.
These are up to the supervising engineer to master.
-
It is possible to fill in the last date of the inspection batch a few working days back from the date of the sub-project, and so on for the sub-division, the sub-division, and so on. Pay attention to the date of filling in the branch to see if it is after the date of all compulsory inspection reports.
-
You can fill in according to the date of your acceptance, which is generally after the date of all inspection batches of the item.
-
The project quality acceptance should be on what day the acceptance should be filled, which is related to the century-old plan, not child's play!
-
Fill in the steel bar processing and production inspection batch, steel bar installation inspection batch, template installation inspection batch, template removal inspection batch and so on. The part is the part of the inspection batch representative, such as: the first floor of the roof, the second layer of the structural column, etc.
The project is divided according to the size of the scope involved: the unit project, the sub-project, the sub-project, the inspection batch of the part, the section. The inspection lot is the smallest unit. As the acceptance data of the project.
-
<>1. The completion report of the construction unit.
2. The quality evaluation report of the completion of the project of the supervision unit.
3. Survey documents and implementation inspection reports of the survey unit.
4. The design documents and implementation of the design unit are inspected and reported.
5. Opinion on the completion and acceptance of the quality of the construction project or the completion and acceptance record of the quality of the unit.
6. Notice of rectification of problems in completion acceptance.
7. There are problems in the completion acceptance and rectification acceptance opinion.
8. The notice of the project with the completion acceptance conditions and the notice of re-organization of the completion acceptance.
9. The quality control data of the unit project is good to check the records.
10. Verification of safety and functional inspection data of unit engineering and random inspection records of main functions.
11. Records of quality inspection of unit projects.
12. Sign-off opinion form for users who sell commercial housing or employee fund-raising housing.
13. Project quality warranty contract.
14. Completion and acceptance report of construction project.
15. an as-built drawing.
It refers to the construction project on the basis of the construction unit's own quality inspection and evaluation, and the relevant units involved in the construction activities jointly conduct sampling and re-inspection of the quality of the inspection batch, sub-item, division and unit project, and confirm whether the quality of the project is qualified or not in writing according to the relevant standards.
-
Legal analysis: the quality acceptance data of the sub-project are: 1, the construction unit project completion report 2, the rough talker supervision unit project completion quality evaluation report 3, the survey unit survey documents and implementation inspection report 4, the design unit design documents and implementation inspection report 5, the construction project quality completion acceptance opinion or the unit project quality completion acceptance record 6, the completion acceptance of the problem rectification notice 7, the completion acceptance of the problem rectification acceptance opinion 8, The notice of the project with the completion acceptance conditions and the notice of re-organization of the completion acceptance 9, the verification record of the quality control data of the unit project 10, the verification record of the safety and functional inspection data of the unit project and the random inspection of the main function 11, the quality inspection record of the unit project perception of the liquid 12, the user signature opinion form of the directional sale of commercial housing or the housing of the staff fund-raising 13, the project quality warranty and the rock potato 14, the completion acceptance report of the construction project 15, and the completion drawing.
Legal basis: "Measures for the Safety Management of Sub-projects with Greater Risk" Article 9 The special plan for sub-projects with greater risk exceeding a certain scale shall be organized by the construction unit to convene an expert demonstration meeting. If the general construction contracting is implemented, the general construction contractor shall organize and convene an expert demonstration meeting.
In fact, for such problems, it is already very common. If you want to find information, I recommend that you collect it in the library, but my personal opinion is that these things are all about how to manage all aspects of the construction site well, right? In the whole management system, the management system plays an auxiliary role >>>More
Legal analysis: 1. Formwork engineering: The formwork project should have a design and construction plan, the formwork support (frame) should have sufficient strength, stiffness and stability, and the support (frame) should be able to withstand the weight of the newly poured concrete, the weight of the formwork, the lateral pressure and the construction load. >>>More
1. The acceptance of the quality of the sub-project and the sub-division (sub-division) shall be carried out on the basis of the self-inspection of the construction unit. The construction unit confirms that the self-inspection is qualified and submits an application for project acceptance, and the following technical documents and records shall be provided during the project acceptance: >>>More
Fan Wen 1: Quality Assurance Certificate.
Dear Clients: >>>More
In accordance with the provisions of Articles 15 and 27 of the Constitution of the People's Republic of China, the People's Republic of China** attaches great importance to protecting the people's housing rights and interests, and actively promotes urban construction and improvement of the living environment. In order to ensure the construction quality of the exterior wall insulation project of the housing building, the relevant departments emphasize the strengthening of construction quality management. >>>More