What is included in the special construction plan?

Updated on society 2024-07-29
5 answers
  1. Anonymous users2024-02-13

    1. What are the contents of the special construction plan?

    1. The special construction plan includes: temporary layout plan in the preparation stage, temporary construction layout plan, temporary power supply plan, temporary water use plan, sewage discharge plan, etc. It also needs the plan required for the construction process, other construction plans, fire protection plans, drainage, HVAC construction plans, system commissioning plans, and acceptance plans.

    2. Legal basis: Article 49 of the Construction Law of the People's Republic of China.

    2. What is the approval process for the special construction plan?

    1. The approval process of the special construction plan is: the construction plan constructed by the professional unit shall be approved by the technical person in charge of the professional contractor or the technical person in charge authorized by the technical person-in-charge, and then the subcontractor shall submit the plan, and the technical person in charge of the project department shall review and seal it, and send it to the quality department of the head office for review and registration. For the temporary electricity scheme with greater risk, it shall be reviewed and approved by the safety department, and shall be submitted to the chief engineer for approval after sealing.

    2. According to the relevant regulations, for the decoration project involving the change of the main body of the building and the load-bearing structure, the construction unit shall entrust the original design unit or the design unit with corresponding qualifications to propose the design plan before construction; If there is no design plan, no construction shall be allowed.

  2. Anonymous users2024-02-12

    1. Basis and principle of preparation;

    2. Scope of preparation;

    3. Project overview;

    4. Overall layout and construction schedule;

    5. Construction technical scheme;

    6. Guarantee measures for the construction period;

    7. Quality objectives, assurance system and assurance measures;

    8. Safety production objectives and guarantee measures;

    9. Emergency rescue plan;

    10. Seasonal and winter construction guarantee measures;

    11. Environmental protection measures;

    12. Civilized construction requirements;

    13. Coordination with Party A, supervision and design.

    First, the main construction plan of earthworks.

    According to the actual situation of construction, the outdoor frozen soil excavation in winter needs to be melted before construction, and burned shavings, sawdust, waste wood and coal are used to bake, and special personnel should be assigned to supervise them, and reliable fire prevention measures should be taken at the same time. The foundation pit (groove) adopts mechanical excavation, and the excavated soil material is concentrated in the designated soil dumping site; For the excavated unfrozen soil, do a good job of thermal insulation at the spoil site, and use the method of covering plastic sheets and sacks to prevent freezing for backfilling. The dug foundation pit (groove) is covered with sacks and plastic sheets to prevent freezing, and according to the ambient temperature conditions, the thermal calculation is carried out in its work instructions to determine the thickness of the insulation layer.

    Other requirements during construction are as follows:

    1. For the winter construction of earthworks, preparations should be made before construction and continuous construction.

    2. When excavating, thermal insulation measures should be taken to prevent the freezing of adjacent building (structure) foundations or other facilities.

    3. Remove the ice, snow and debris on the substrate before filling, and the indoor backfill shall not contain frozen soil materials; For outdoor large-area backfill (no other building (structure) or foundation on the top) can be used containing the soil material containing frozen soil blocks, but the particle size of frozen blocks shall not be greater than 15cm, and its content (in terms of volume) shall not exceed 30, and evenly distributed, the thickness of each layer of paving soil is reduced by 20 25 than at room temperature construction, and should be compacted layer by layer.

    4. Avoid freezing of the foundation soil, and the frozen foundation soil shall not be used as the bearing layer of the foundation.

    5. During the construction process of the foundation, the base soil shall not be soaked in water or melted snow water.

    2. The legal basis for building construction.

    Article 7 of the Construction Act.

    Before the start of the construction project, the construction unit shall, in accordance with the relevant provisions of the state, apply to the people's construction administrative department at or above the county level where the project is located to obtain a construction permit; However, the exception is for minor works below the limit determined by the construction administrative department. Construction projects that approve the commencement report in accordance with the authority and procedures specified in the *** will no longer receive a construction permit.

  3. Anonymous users2024-02-11

    Legal analysis: The special construction plan shall include the following main contents: 1

    Project overview: the basic situation of the project, the construction layout, the construction requirements and the technical guarantee conditions. 2.

    Preparation basis: relevant laws, regulations, normative documents, standards, specifications and drawings (icon atlas), construction organization design, etc. 3.

    Construction plan: including construction schedule, material and equipment plan.

    Legal basis: "Regulations on the Administration of Work Safety in Construction Projects" Article 26 The construction unit shall, in the construction organization design, prepare safety technical measures and temporary electricity plans at the construction site, prepare special construction plans for the following sub-projects that have reached a certain scale of greater risk, and attach the results of safety calculations, which shall be implemented after being signed by the technical person in charge of the construction unit and the chief engineer, and shall be supervised by full-time safety production management personnel on site: (A) foundation pit support and dewatering engineering; (B) earthwork excavation works; (C) formwork engineering; (D) lifting and hoisting engineering; (5) Scaffolding works; (6) Demolition and blasting projects; (VII) the construction administrative departments or other relevant departments of other dangerous projects.

    For the projects listed in the preceding paragraph involving deep foundation pits, underground excavation projects, and tall formwork projects for special construction plans, the construction unit shall also organize experts to demonstrate and review.

    The standards provided for in the first paragraph of this article to reach a certain scale of dangerous projects shall be formulated by the competent administrative department of construction in conjunction with other relevant departments.

  4. Anonymous users2024-02-10

    Earthwork, precipitation, slope protection engineering construction plan.

    Waterproofing engineering construction plan.

    Tower crane foundation construction plan.

    Temporary electricity construction plan.

    Construction test scheme.

    Construction Survey Scheme.

    Winter construction plan.

    Construction plan of reinforcement project.

    Formwork construction plan.

    Concrete engineering construction plan.

    Scaffolding and protective construction scheme.

    Roofing engineering construction plan.

    Secondary structure construction plan.

    Hydropower installation project construction plan.

    External elevator foundation construction plan.

    Decoration and decoration project construction plan.

    Fire protection plan.

    Project data compilation scheme.

    Project Overview 2Prepared on the basis of 3Construction Plan 4Construction technology 5 Construction safety assurance measures 6Workforce Planning 7Calculations and drawings.

    The following preparations should be made for the preparation of emergency plans:

    Programming 1Working Group on the Preparation of Emergency Plans 2Data collection 3Hazard and Risk Analysis 4Emergency Response Capability Assessment 5Preparation of emergency plans 6Review and release of emergency plans.

    Type of emergency plan.

    1. Comprehensive emergency plan. The comprehensive emergency plan is a comprehensive document for dealing with all kinds of accidents, such as emergency guidelines, policies, emergency organizational structure and related emergency responsibilities, emergency actions, measures and guarantees, and other basic requirements and procedures for dealing with accidents.

    2. Special emergency plan. The special emergency plan is a plan or program formulated for specific accident categories, hazards and emergency support, and is a component of the comprehensive emergency plan. 3. On-site disposal plan.

    The on-site disposal plan is an emergency response measure formulated for specific devices, places or facilities, and posts. The on-site disposal plan should be specific, simple and targeted.

  5. Anonymous users2024-02-09

    "Regulations on the Safety Management of Dangerous Sub-project Projects" (Order No. 37 of 2018 of the Ministry of Housing and Urban-Rural Development).

    Notice on issues related to the safety management regulations of sub-projects with greater risk (Jian Ban Zhi 2018 No. 31.

Related questions
2 answers2024-07-29

Construction organization design of the dredging project of the Junheyong section of the Shijing River in Baiyun District, Guangzhou. >>>More

3 answers2024-07-29

Emergency plan, special construction plan 370

Decoration Engineering Special Construction Organization Design 314 >>>More

16 answers2024-07-29

Approval by the technical person in charge of the enterprise. >>>More

3 answers2024-07-29

Kiss! Hello, happy to answer your <>

The main points of the pro-concrete construction scheme are as follows:1** way of concrete: >>>More

2 answers2024-07-29

First, the general situation of the project.

XX Bay Bridge and XX River Bridge, starting station number: K22+, ending station number: K23+, XX Bay Bridge bridge length, 9 30m structural continuous T beam. >>>More