Highway Engineering Bidding and Bidding Management Measures 2019 is a basic document in the field of highway construction in China, including the provisions on bidding and bidding procedures, bid bonds, bid evaluation, transaction and performance, etc., aiming to strengthen the supervision and management of highway engineering bidding and bidding, and improve the transparency and fairness of bidding and bidding.
Highway Engineering Bidding and Bidding Management Measures 2019 is a basic document in the field of highway construction in China, which has been implemented since July 2019. The measures mainly include the following provisions: 1
Provisions on bidding and bidding procedures: clarify the procedures that should be followed in the bidding and bidding of highway projects, including the issuance of announcements, prequalification, preparation of bidding documents, bid opening and evaluation, transaction and performance, as well as the time limits and specific requirements of relevant procedures. 2.
Provisions on bid bonds: It is stipulated that bidders shall pay the deposit in accordance with the regulations, the payment method, amount, return, confiscation and other matters, and the bidders who have not paid or do not meet the requirements shall be eliminated. 3.
Provisions on bid evaluation and closing: The composition and working procedures of the evaluation committee are clarified, as well as the specific requirements for the determination of the winning bidder and the signing of the contract. 4.
Provisions on performance management: It is stipulated that the winning bidder shall complete the project and meet the quality requirements in accordance with the contract, and at the same time clarify the specific matters such as the payment and use of the performance bond. In addition, the measures also clarify the response methods and procedures for the problems that may arise in the bidding and bidding of highway projects, such as failed bids, scrapped bids, changes, etc.
If there is a dispute in the tender documents, how can it be resolved? If there is a dispute in the bidding documents, the bidder can challenge the tenderer in writing and file an administrative lawsuit or arbitration within the specified time. In addition, the terms in the bidding documents should be strictly interpreted and understood to avoid misunderstandings.
In the bidding documents, it should be detailed as much as possible that the bidder should have the qualifications and technical requirements, as well as the evaluation criteria and procedures of the winning bidder.
Highway Engineering Bidding and Bidding Management Measures 2019 is a basic document in the field of highway construction in China, which stipulates the procedures and specific requirements for highway engineering bidding and bidding behaviors to ensure the transparency, fairness and legitimacy of highway construction projects. In the implementation of bidding and bidding, the relevant regulations and procedures shall be strictly observed, so as to ensure that the bidding and bidding are open, fair and reasonable.
Legal basis]:
The People's Republic of China highway engineering bidding and bidding management measures 23rd sale of bidding documents should be open, fair and transparent. The tenderer shall not restrict the tenderer from obtaining the bidding documents in any way, and the bidding documents must be in accordance with the same format, and the information provided by the bidding documents must be sufficiently detailed, accurate, comprehensive and standardized.
-
The Ministry of Transport is responsible for the supervision and management of the bidding and bidding of the construction project of the national highway limb grinding project. The provincial-level people's transportation department is responsible for the supervision and management of the bidding and bidding activities of highway engineering construction projects within the administrative area.
1. Measures for the management of bidding and bidding for construction project survey and design.
Measures for Survey and Design Bidding and Bidding of Engineering Construction Projects is a document issued by the Ministry of Construction of the People's Republic of China and other departments. In order to standardize the survey and design bidding and bidding activities of engineering construction projects, improve investment efficiency and ensure the quality of projects, these measures are formulated in accordance with the "Bidding Law of the People's Republic of China" and the "Regulations on the Implementation of the Bidding and Bidding Law of the People's Republic of China".
Second, the construction of water conservancy project bidding and bidding management regulations.
1.In order to strengthen the management of bidding and bidding for water conservancy construction projects and standardize bidding and bidding activities, these provisions are formulated in accordance with the "Bidding and Bidding Law of the People's Republic of China" and relevant national regulations, combined with the characteristics of water conservancy project construction.
2.These provisions apply to the survey, design, construction, supervision of water conservancy engineering construction projects, as well as the bidding and bidding activities related to the construction of important equipment and materials related to the construction of water conservancy projects.
3. Which department to report to the bidding violation.
1. For the bidding and investment in the procurement, because the procurement stipulates that the main regulatory department is the financial department, therefore, if it is the procurement bidding and the bidding is the financial department;
2. For non-first-class procurement bidding and bidding activities, the "Opinions on the Division of Responsibilities for the Implementation of Administrative Supervision of Bidding and Bidding Activities by Relevant Departments" stipulates that the competent department shall supervise it;
3. The latest plan stipulates that the first is the coordination department for the bidding and bidding work, so it also has the right to supervise the national bidding and bidding work;
4. Depending on the nature of the purchaser, the competent regulatory authorities may also include the audit department, the supervision department, the State-owned Assets Supervision and Administration Commission, etc.
Measures for the Administration of Bidding and Bidding of Highway Engineering Construction Projects
Article 1 in order to standardize the bidding and bidding activities of highway engineering construction projects, improve the highway engineering construction market management system, in accordance with the People's Republic of China Highway Law, the People's Republic of China Bidding and Bidding Law, the People's Republic of China Bidding and Bidding Law Implementation Regulations and other laws and administrative regulations, these measures are formulated.
Article in the People's Republic of China engaged in highway engineering construction project survey and design, construction, construction supervision and other bidding activities, these measures shall apply.
-
Legal analysis: highway engineering construction project bidding and bidding management measures stipulate: highway engineering survey design and construction supervision bidding, should use the comprehensive evaluation method for bid evaluation, the bidder's business documents, technical documents and ** documents for scoring, according to the comprehensive score from high to low sorting, recommend the winning candidate.
The weight of the evaluation price should not exceed 10, and the evaluation price score should be calculated according to the degree of deviation between the evaluation price and the evaluation benchmark price. For highway engineering construction bidding, the bid evaluation adopts the comprehensive evaluation method or the lowest bid price method after evaluation. The comprehensive evaluation method includes the reasonable low price method, the lowest price method for technical scoring and the comprehensive scoring method.
The reasonable low price method refers to the bidders who have passed the preliminary evaluation, no longer scoring their construction organization design, project management agencies, technical capabilities and other factors, and only scoring the evaluation price according to the evaluation benchmark price, and recommending the bid evaluation method of the winning candidate according to the score from high to low. The lowest price method of technical scoring refers to the construction organization design, project management agency, technical ability and other factors of the bidder who have passed the preliminary evaluation, and the bidding documents are reviewed according to the ranking from high to low, and the bidder's ** documents are reviewed within the number specified in the bidding documents, and the bid evaluation method is recommended for the winning candidates in accordance with the order of the evaluation price from low to high. The number of bidders participating in the evaluation of ** documents specified in the bidding documents shall not be less than 3.
Legal basis: "Highway Engineering Construction Project Bidding and Bidding Management Measures" Article 8 For highway engineering construction projects that need to perform project examination and approval procedures in accordance with the relevant provisions of the State and must be tendered in accordance with the law, the tenderer shall carry out the bidding in accordance with the scope of the project examination and approval department, the bidding method, and the bidding organization form. The highway engineering construction project can only carry out survey and design bidding after the project approval or approval procedures are completed; After the preliminary design documents are approved, the bidding for construction supervision and design and construction general contracting can be carried out; After the approval of the construction drawing design documents, the construction bidding can be carried out.
If the construction bidding adopts the prequalification method, the preliminary design documents can be pre-qualified.
-
The administrative measures for the bidding and bidding of highway projects generally refer to the administrative measures for the bidding and bidding of highway engineering construction.
The conditions for bidding for highway projects are as follows:
The construction project that must be tendered according to the leniency rule law shall meet the following conditions before the construction bidding can be carried out:
1. The tenderer has been established in accordance with the law;
2. If the preliminary design and budget estimate should be subject to examination and approval procedures, it has been approved;
3. The scope of bidding, bidding methods and organizational forms of bidding shall be carried out and have been approved;
4. There are corresponding funds or funds that have been implemented;
5. There are design drawings and technical information required for bidding.
Legal basis]:Article 16 of the Measures for the Acceptance of the Completion (Delivery) of Highway Projects.
The following conditions shall be met for the completion acceptance of highway projects:
1) 2 years after the trial operation;
2) The remaining problems such as project quality defects raised by the delivery and acceptance have been dealt with and passed the acceptance by the project legal person;
3) The final accounts of the project have been prepared in accordance with the methods prescribed by the Ministry of Communications, and the final accounts of the completed shed have been audited and identified by the competent department of transportation or its authorized units;
4) The completion documents have been completed in accordance with the provisions of the Ministry of Communications;
5) For projects that need to be accepted for individual items such as archives and environmental protection, they have been accepted by relevant departments;
6) The participating units have completed their respective work reports in accordance with the provisions of the Ministry of Communications;
VII) the quality supervision agency has been in accordance with the Ministry of Communications provisions of the highway engineering quality appraisal method for the quality inspection and appraisal of the project qualified, and the formation of the project quality appraisal report.
At this stage, what is the common problem of the quality of subgrade engineering in China?What are the main quality problems?The following is the relevant content of Zhongda Consulting's combing of professional construction terminology for common problems in the quality of subgrade engineering, and the basic situation is as follows: >>>More
Prerequisites. A) all citizens of the People's Republic of China, law-abiding and have one of the following conditions, can apply to participate in the national supervision engineer qualification examination. >>>More
Highway engineering quality assurance system: supervision, social supervision, enterprise self-inspection. >>>More
First, the latest highway engineering quality inspection and evaluation standards basis. >>>More
None of the exam questions will be leaked before the exam, and if they do, the person responsible is breaking the law. Therefore, the secret papers and question papers on the Internet are all mock papers, and the question types of real exams are simulated as much as possible. Therefore, it is recommended that the subject be carefully screened, and the answers to the questions that have not yet been held are even more funny.