What qualification certificates should be possessed for the installation of high and low voltage dis

Updated on society 2024-08-08
7 answers
  1. Anonymous users2024-02-15

    1. The installation of high and low voltage distribution cabinets should have the qualification certificates of senior engineers, medium engineers and second-level mechanical and electrical construction engineers in electric power.

    2. The high and low voltage distribution cabinet is the power distribution equipment connected to the high-voltage distribution cabinet, the low-voltage switchgear and the connecting cables. Generally, the power supply bureau and substation are used with high-voltage distribution cabinets, and then through the transformer step-down to low-voltage switchgear, low-voltage switchgear and then to the distribution panel, control box, and switch box of each electricity, which is nothing more than some switches, circuit breakers, fuses, buttons, indicator lights, instruments, wires and other protection devices assembled into an integrated power distribution equipment.

  2. Anonymous users2024-02-14

    3972966 Chengdu Jinhuaneng Electric Power Industry Co., Ltd. power transmission, substation, distribution engineering construction, commissioning and line maintenance, technical consulting services, real estate development, sales: power equipment, building materials, decorative materials, metal materials, knitted textiles, address: Chengdu, Sichuan Province, Chenghua District, Erxianqiao North Road Zip code:

    610051 **Number: 83347855 Chengdu Longmenshan Electric Power **** is engaged in hydropower generation and sales, power engineering construction, installation and maintenance, and power maintenance with a license or qualification certificate. Power technology consulting and services.

    89876576 Chengdu Ruixiang Electric Power Engineering **** high and low voltage power engineering installation, maintenance and repair (operating with qualification certificate); Sales of electrical equipment and equipment. Address: Qingbaijiang District, Chengdu, Sichuan Province, Dabend Town, Qingjiang East Road, No. Zip Code:

    611835 **Number: 7286211 Chongzhou Chongming Electric Power Co., Ltd. Electricity**, power generation, power line erection and maintenance, electrical products sales Address: Chongyang Town, Chongzhou City, Chengdu, Sichuan Province Shuzhou North Road Zip Code:

    611230 **Number: 82272937 Chongzhou Mingxin Electric Power Small Network **** Power Generation, Power Line Erection and Maintenance, Electrical Products Sales**Address: Chongyang Town, Chongyang City, Chengdu, Sichuan Province Shuzhou North Road Zip Code:

    611230 **Number: 82272937

  3. Anonymous users2024-02-13

    What certifications, approvals and qualifications are required for the production of distribution boxes and distribution cabinets?

    Hello dear! We'll be happy to answer for you. What good source certifications, approvals and qualifications are required for the production of distribution boxes and distribution cabinets?

    Answer: such as power cabinets, distribution boxes, distribution cabinets, JP cabinets, etc., in accordance with national regulations, for 3C compulsory certification, first, like the registration process of all ordinary companies, first go to handle business licenses, enterprise certificates, tax registration certificates and other licenses. Second, apply for CCC certification on the CQC online friendly type, note, low-voltage complete sets of manufacturers want to obtain a production license, must apply and pass the CCC certification.

    Third, the production of prototypes, to the designated institutions to do type tests, through the CQC to send people to do factory rent inspection, to meet the requirements of the certificate issued to the certificate, after the certificate can be produced. Only complete sets of manufacturers that have obtained CCC certification are qualified to produce and sell.

  4. Anonymous users2024-02-12

    Summary. Hello dear <>

    We'll be happy to answer for you.

    Electrician Certificate: All personnel engaged in the installation, maintenance, testing and other work of electrical equipment must hold a valid electrician certificate. 2.

    Qualification certification: Enterprises that install distribution cabinets need to obtain the corresponding general contracting qualification for construction engineering, including the professional contracting qualification for electrical installation engineering, and conduct annual review and filing in accordance with the regulations. 3.

    Engineer qualification: the design and construction of the distribution cabinet needs to have the corresponding information and professional skills, and the enterprise needs to have the title of registered electrical engineer or registered architect to participate in the design and construction of the project. 4.

    Qualification requirements for the installation of distribution cabinets.

    Hello dear <>

    We'll be happy to answer for you.

    The installation of power distribution cabinet is a project involving electrical safety, and there are strict regulations and requirements in the national and local laws and regulations. Here are some basic qualifications:1

    Electrician Certificate: All personnel engaged in the installation, maintenance, testing and other work of electrical equipment must hold a valid electrician certificate. Wang slip 2

    Qualification certification: Enterprises that install distribution cabinets need to obtain the corresponding general contracting qualification for construction engineering, including the professional contracting qualification for electrical installation engineering, and conduct annual review and filing in accordance with the regulations. 3.

    Engineer qualification: the design and construction of the distribution cabinet needs to have the corresponding information and professional skills, and the enterprise needs to have the title of registered electrical engineer or registered architect to participate in the design and construction of the project. 4.

    Refers to the replacement of the distribution cabinet.

    The installation of power distribution cabinets requires the following qualification requirements: 1. General contracting qualification or professional contracting qualification for the construction of jujube power engineering; 2. Professional contracting qualification for electrical engineering or professional contracting qualification for electrical installation engineering; Nabo 3, with the corresponding electrical engineering design qualification or electrical design consulting qualification; 4. Have the relevant electrical engineering supervision qualification or electrical engineering supervision consulting qualification.

  5. Anonymous users2024-02-11

    Summary. Hello, this situation is that the installation of high and low voltage distribution cabinets should have the qualification certificate of senior engineer, medium engineer and secondary mechanical and electrical construction engineer in the power profession.

    Low-voltage distribution cabinets need to apply for CCC certification, and cannot be sold in China without CCC certification. The executive standard is GB 7251 series.

    High-voltage switchgear generally needs to do the type test of the laboratory approved by the State Grid Corporation, which is more expensive. Of course, there are other tax, industrial and commercial qualifications for starting a company, and other product requirements.

    What qualifications do I need to apply for high and low voltage complete sets of equipment (such as distribution cabinets)?

    Hello, this situation is that the installation of high and low voltage distribution cabinets should have the qualification certificate of senior engineer, engineer and second-level mechanical and electrical construction engineer in the power major. Low-voltage distribution cabinets need to apply for CCC certification, and cannot be sold in China without CCC certification. The standard family is GB 7251 series.

    High-voltage switchgear generally needs to be sold to the type test of the laboratory approved by the State Grid Corporation, which is more expensive. Of course, there are other tax, industrial and commercial qualifications for starting a company, and other product requirements.

  6. Anonymous users2024-02-10

    What qualifications do I need to apply for high and low voltage complete sets of equipment (such as distribution cabinets)?

    Hello Lianghe, the source key calendar of high and low voltage complete sets of equipment needs to handle the following qualifications: 1Power Engineering Construction General Contracting Qualification Certificate:

    This certificate is a necessary certificate for the construction of high and low voltage complete sets of equipment engineering. 2.Professional Qualification Certificate for Power Engineering Design:

    It is necessary to supervise the construction site of high and low voltage complete sets of equipment, which must be carried out by the supervision personnel with the qualification certificate. 4.Certificate of Qualification of Supervision Agency:

    The supervision agency needs to obtain a certificate of conformity before it can undertake the supervision of high and low voltage complete sets of equipment engineering. 5.Maintenance and overhaul service information hail search:

    High and low voltage complete sets of equipment need to be maintained and overhauled regularly, so it is necessary to obtain maintenance and overhaul service qualifications. 6.Engineering quality inspection qualification:

    For high and low voltage complete sets of equipment engineering, quality inspection is required, so it is necessary to obtain the corresponding qualification certificate.

  7. Anonymous users2024-02-09

    Abstract: What are the installation requirements for low-voltage distribution cabinets.

    1. The box material of low-voltage distribution cabinet, distribution box and switch box is generally made of steel plate, and insulating board can also be selected, but wood material should not be used.

    2. The electrical box and switch box should be installed upright, firmly, and should not be inverted or skewed. The bottom of the fixed distribution box and switch box is perpendicular to the ground, which should be greater than less than or equal to; The distance between the bottom of the mobile distribution box and the switch box and the ground should be greater than or equal to less than or equal to.

    3. It is strictly forbidden to connect the power cord into the low-voltage distribution cabinet with a bolt.

    4. The distance between the electrical boxes should not be too far. The distance between the distribution electric box and the switch box is not more than 30m. The horizontal distance between the switch box and the fixed electrical equipment should not exceed 3m.

    5. Each electrical equipment should have its own special switch box. Each electrical equipment on the construction site should have its own special switch box, and must meet the requirements of "one machine, one gate and one leakage", and it is strictly forbidden to use the same switch to directly control two or more electrical equipment (including sockets). A leakage protector must be set up in the switch box, and its rated leakage action current should not be greater than 30mA, and the leakage action time should not be greater than.

    What are the requirements for the installation of low-voltage distribution cabinets?

    Hello, I am helping you to inquire about the relevant case and will reply to you immediately.

    What are the installation requirements for low-voltage distribution cabinets 1. The box materials of low-voltage distribution cabinets, distribution boxes and switch boxes are generally made of steel plates and insulating boards, but wood materials should not be used. 2. The electrical box and switch box should be installed upright, firmly, and should not be inverted or skewed. The bottom of the fixed distribution box and switch box is perpendicular to the ground, which should be greater than less than or equal to; The distance between the bottom of the mobile distribution box and the switch box and the ground should be greater than or equal to less than or equal to.

    3. It is strictly forbidden to connect the power cord into the low-voltage distribution cabinet with a bolt. 4. The distance between the electrical boxes should not be too far. The distance between the distribution electric box and the switch box is not more than 30m.

    The horizontal distance between the switch box and the fixed electrical equipment should not exceed the level of each electrical equipment, and each electrical equipment should have its own special switch box. Each electrical equipment on the construction site should have its own special switch box, and must meet the requirements of "one machine, one gate and one leakage", and it is strictly forbidden to use the same switch to directly control two or more electrical equipment (including sockets). A leakage protector must be set up in the switch box, and its rated leakage action current should not be greater than 30mA, and the leakage action time should not be greater than.

    What I want to ask is what are the requirements for the switch in the phase change low-voltage outlet cabinet of formal electricity.

    Personally, I understand that the circuit breaker is selected for the outgoing switch in the institute, the first-level leakage protection should refer to the main distribution box out of the low-voltage cabinet, the total distribution box of the construction unit should be the second-level leakage protection, and the leakage protection switch connected to the electrical equipment should be the third-level protection.

Related questions
15 answers2024-08-08

1. The excessive pressure in the system causes the safety valve to discharge water. >>>More

6 answers2024-08-08

What do you mean by high and low pressure? Does high voltage refer to 220V mains? >>>More

10 answers2024-08-08

1. Design tasks and requirements.

1.Use a reed meter water level controller to measure the water level of the water tower. >>>More

6 answers2024-08-08

Well, not everyone is the same. The general relevant needs are: 3C certification standard qualification, company profile, business license (annual inspection is valid), organization ** certificate, tax registration certificate (all copies are stamped with official seal), power of attorney of legal representative (must be original), etc.