Generally, it is not said that it is squared, because some are single-layered, some are double-layered, and even have multiple layers. There is no way to measure it. Generally speaking, it is said that kilograms, binding flat and small steel bars, generally can be tied a day, and the girder is about 1 ton.
Generally on a daily basis, a good rebar worker can bind, which is an ordinary house, frame structure or shear wall structure, and the efficiency of binding the bottom plate reinforcement will be higher. A4-307 (rebar with a diameter of less than 10) man-days tons, A4-310 (stirrups with a diameter of less than 10) man-days tons.
Inspection of rebar.
The inspection of the steel bar should first check the brand number and quality certificate of the steel bar; Secondly, the appearance inspection should be done, 5% of the steel bar should be extracted from each batch, and the surface of the steel bar should not be cracked, wounded and stacked, the bump on the surface of the steel bar should not exceed the height of the cross rib, the depth and height of the defect should not be greater than the allowable and deviation of the part, and the bending of each meter of the steel bar should not be greater than four millimeters; Next, if each batch is less than 60 tons, 2 will be extracted from it, and two sections of each will be intercepted for tensile and cold bending tests respectively.
-
Four or five hundred yuan a day can be obtained, but this requires the cooperation of workers to complete the corresponding workload. A person has to tie about 300 kg of rebar. It can also be used to record work and calculate accounts at the construction site.
-
Pro, reinforcing steel workers can bundle 5 8 square steel bars a day to take the square of Kisen The daily workload is consumed in the field of binding, and 600-700 kg can be tied every day, which is in the general workload, excluding the foundation and secondary structure of the normal ** is about 310 yuan per ton. It depends on the **! The ups and downs are no more than 20 fast depending on the specific building requirements, frame structure construction, a skilled rebar worker can do 5 8 square meters per day.
If my answer is helpful, please give it a thumbs up (rate it in the bottom left corner) <>
I look forward to your praise, your efforts are very important to me, and your support is also the driving force for my progress<><
If you are satisfied with my answer, <>
Xianfeng Hidden Flower] can click on my avatar for one-on-one consultation. Finally, I wish you good health and a good mood! <>
-
Summary. The pros are as follows; It is generally not calculated by square, because some are single-layered, some are double-layered, and even have multiple layers. There is no way to measure it. Generally, it is measured by tons, and the flat small steel bar can be tied in a day, and the beam is about 1 ton.
The pro-lead stuffiness and empty hood stuffiness; Generally, it is not calculated by square, because some are single-layered, some are double-layered, and even have multiple layers. There is no way to measure it. Generally, it is measured by tons, and the flat small steel bar can be tied in a day, and the beam is about 1 ton.
A steel bar hole can be tied to about tons of steel bars every day, if it is the foundation of the steel bar can be cracked to bind tons, mainly because the base steel bar specifications are large, the weight is also large, so you can tie more, after the standard layer, the steel bar specifications become smaller, can only be tied 200 kg per day left Na source mold right, that is, about tons, if it is about square meters, a steel bar worker can be tied about ten square meters a day.
Reinforcement engineering labor can be roughly divided into three categories: >>>More
Long-term outdoor work, coupled with the fact that this guy is very hard-working, in order to make a living for ten years, it is difficult to work as a steel worker on the construction site without looking old.
The theoretical weight of the rebar is calculated by multiplying the square of the rebar diameter (mm) by the weight of the rebar per meter in a circle of 10 rebars. The weight of the rebar is proportional to the square of the diameter (radius). >>>More
Quantity calculation rules.
VIP Exclusive Document 2018-10-15 7 pages. >>>More
According to Article 39 of the "Work-related Injury Insurance Regulations of the People's Republic of China", if an employee dies on the job, his close relatives shall receive funeral subsidies, pensions for dependent relatives and one-time work-related death subsidies from work-related injury insurance in accordance with the following provisions: >>>More