What does the backstage of the reinforcing barworker on the contracted construction site do

Updated on society 2024-03-08
6 answers
  1. Anonymous users2024-02-06

    Reinforcement engineering labor can be roughly divided into three categories:

    The first type is a large package: that is, technology, labor, machinery and equipment, and materials are packaged together, and a certain percentage of management fees are charged, but this proportion. Of course, the amount of capital invested in materials is very large, and it is not possible to do without a large amount of capital, and the risk is also very large.

    So this form is used sparingly. This differentiates into other subcontracting methods.

    The second type of reinforcement technology, installation, background processing, and small machinery, materials such as wire binding and other packaging methods. This is only one way to go with a big bag. This approach requires a certain amount of technical and human resources.

    At present, the regional assault building method is more applicable, and there is also a good development space, which is relatively high. It is also the builder who prefers this kind of package.

    The third type is clearance: that is, the integration of installation and processing. It can also be divided into two categories, one is package installation, and the other is package background processing. Relatively speaking, this is relatively simple, and the profit margin is also very small.

    Steel bars are paid more attention to technical management and material saving, which directly affects the efficiency of the project. There can be some room for bargaining.

    I'll quote some of the things that were said downstairs as well:

    If you want to contract, you must have a group of good technical personnel by your side, familiar with drawings and steel bar samples, familiar with specifications, and know how to manage projects.

    It is more important to know how to organize and rationalize the mobilization of workers. Do your job well and your work will continue.

    For now, you said too many steel bosses, and there are few who can really become bigger and stronger. But it can be big.

  2. Anonymous users2024-02-05

    Hello! After the reinforcement worker, the person who is in the field of straightening the steel bar, breaking the material ruler reputation and bending stirrups and bending large material elbows in the shed, generally said that it should be the personnel who make the steel bar. The corresponding reinforcing bar worker front desk refers to the on-site reinforcing bar binding and installation personnel.

    The background of the reinforcing bar worker refers to the personnel who are straightening the steel bar, breaking the material and bending stirrups and bending large material elbows in the shed, which should be the personnel of steel bar production. The corresponding reinforcing bar worker front desk refers to the on-site rebar binding and installation personnel.

  3. Anonymous users2024-02-04

    How to do a steel bar project on a contracted construction site! Hello, I am glad to answer your <> reinforcing steel projects on the contracting site are as follows: the contractor's status is divided into reinforcing steel engineering contracting methods In engineering contracting, there is often more than one contractor on a construction project.

    The relationship between the contractor and the construction unit, as well as between different contractors, is different and the status is different, which also forms different contracting methods. There are 5 types of norms. 1. A contractor is responsible for organizing and implementing all the work of the whole process of construction of a construction project or a certain stage (such as the construction stage).

    This contractor can assign professional work to different professional contractors to complete, and coordinate and supervise their work in a unified manner. Under normal circumstances, the construction unit only has a direct relationship with this contractor, and does not have a direct relationship with each professional contractor. This type of contracting is called general contracting.

    The unit that undertakes this kind of task is called the general contractor, or simply the general contractor, and usually has consulting and design institutions, general civil engineering companies and large construction companies with integrated design and construction. China's general contracting company is a form of organization of the general contractor. 2. Subcontracting and subcontracting are referred to as subcontracting, which is relative to general contracting, that is, the contractor does not have a direct relationship with the construction unit, but subcontracts a sub-project (such as earthwork, formwork, steel bar, etc.) or a certain professional project (such as steel structure production and installation, sanitary equipment installation, elevator installation, etc.) from the general contractor, and the general contractor makes overall arrangements for its activities on the site and is responsible for the general contractor.

    The subcontractor is usually a professional engineering company, such as an industrial furnace company, an equipment installation company, a decoration engineering company, etc. There are two main ways of subcontracting in the world: one is for the construction unit to designate the subcontractor and sign a subcontract with the general contractor; One is for the general contractor to choose the subcontractor to sign the subcontract.

    Hope mine can help you <>

    Do you have any other questions?

  4. Anonymous users2024-02-03

    The background includes rebar unloading, blanking (copying and bundling), bending, threading and early welding, loading and so on.

  5. Anonymous users2024-02-02

    Answer: The front desk refers to the on-site reinforcement binding and installation personnel; The background refers to the personnel who are straightening the steel bars, breaking the materials, bending stirrups and bending large material elbows in the shed, and generally speaking, the personnel who should make the steel bars. Although the rebar sample is also a rebar worker, it is actually a batch, is it classified in the background?

    Hard! Because only the production and installation of steel bars are mentioned. ‍

  6. Anonymous users2024-02-01

    Lashing at the front desk, production at the back of the house.

Related questions
11 answers2024-03-08

There are a lot of people working on the construction site.

7 answers2024-03-08

You can also apply for no more than 5 professional contracting qualifications, but you shall not be qualified for certification - if the registered capital and legal representative are changed only after passing the certification, it shall be in the industry and commerce

7 answers2024-03-08

According to the regulations on work-related injury insurance, during working hours and at work, if a person dies of sudden illness or dies within 48 hours after rescue is ineffective, it can be regarded as a work-related injury.

3 answers2024-03-08

Relying on hydraulics, support the two side feet on the ground, hold the main body, and then slide the main body for a certain distance, and then drop the main body to complete a slide, or you can slide in the direction of 90 degrees vertically. >>>More

33 answers2024-03-08

According to the process, the work-related injury determination is applied for first, and the compensation amount can only be finalized after waiting for the labor ability appraisal level. >>>More