Do all the information to be done by the installation data clerk from the start of the project to th

Updated on workplace 2024-02-12
7 answers
  1. Anonymous users2024-02-06

    Collect, archive and sort out various materials such as pre-licenses and contracts for each development project. Collect, archive and sort out all kinds of information such as drawings, supporting facilities, budget and final accounts of various development projects. Arrange the sending and receiving of drawings and materials for construction projects.

    Collect all kinds of technical books and magazines. Refine workflow documents. The data clerk is responsible for information documents such as:

    Management documents, notices, relevant technical documents, construction technical standards, process standards, construction specifications, atlases, construction drawings, and construction organization design.

    Engineering contact form, change visa form, project negotiation record, meeting minutes, process checklist, equipment installation checklist, commissioning record, engineering hidden (pre)inspection record, design change.

    Organizing, preserving, and archiving. Preparation of data, processing of texts such as project pre-settlements.

  2. Anonymous users2024-02-05

    1. Submit the construction organization design and construction plan for review; 2. The general construction schedule is submitted for review; 3. Inspection of incoming materials; 4. Submit for review of machinery and equipment entering the site; 5. Enterprise qualifications, project department management personnel, and special work qualifications for review; 6. Commencement of construction for review; 7. The filing materials of the quality supervision station and the safety supervision station; 8. Filing materials of sampling personnel in the testing center.

    1. Precautions for construction sites

    (1) Pay attention to labor protection, correctly use protective equipment and utensils, and strictly follow the operating procedures for construction. Pay attention to fire safety, enter the construction site operation area, especially around flammable and explosive materials, and strictly prohibit smoking. Open flame operations shall not be carried out at the same time and in the same place as flammable and explosive operations.

    (2) Wear tight-fitting work clothes, non-slip shoes, safety helmets, and safety belts when working at height. In the event of heavy fog, heavy rain and strong winds above level 6, it is forbidden to work at height. Special attention should be paid to platform protection, edge protection, and hole protection during high-altitude operations, and safety regulations should be strictly observed during cross operations and climbing operations, and materials should not be thrown downward during construction.

    Second, the characteristics of site construction

    (1) There are many three-dimensional cross operations. The structure of building products is complex, the construction period is tight, and it is necessary to cooperate with each other in multiple units and types of work, and the three-dimensional cross construction, if the management is not good, the connection is improper, and the protection is not strict, it may cause mutual injury. There are many temporary employees.

    At present, migrant workers account for about 50 70 of the workers working on the front line of construction sites, and some construction sites are as high as 95%.

    (2) There are many high-altitude operations. According to the national standard "Classification of Work at Height", more than 90% of the construction is work at height. There are many open-air operations.

    The open-air operation of the building accounts for about 70% of the entire workload, and is affected and harmed by different climates such as spring, summer, autumn and winter, as well as natural conditions such as sunlight, wind, rain, ice and snow, and lightning. There is a lot of manual labor and heavy physical labor.

  3. Anonymous users2024-02-04

    Data clerk workflow.

    Part 1: Pre-construction information.

    1. Notice of winning the bid and construction permit.

    2. Construction contract.

    3. The supervision contract of the entrusted supervision project.

    4. Construction drawing review approval letter and construction drawing review report.

    5. Quality supervision registration.

    6. Key points of quality supervision and quality supervision work plan.

    7. Geotechnical investigation report.

    8. Construction drawings will be reviewed and recorded.

    9. Approved by the supervisor (or owner) of the construction organization design or construction plan 10, commencement report.

    11. Quality management system registration form.

    12. Construction site quality management inspection records.

    13. Technical disclosure records.

    14. Measurement and positioning records.

  4. Anonymous users2024-02-03

    I suggest you take a look at these two books.

    How to be a good data clerk. pdf

    Top 10 technical management manual clerks on the construction site. pdf

    If you want, you can hi me or adopt the post.

  5. Anonymous users2024-02-02

    First, the following information should be done when the decoration project starts:

    1. Commencement report;

    2. Construction organization design and construction plan of each sub-project;

    3. Temporary electricity construction plan and safety production emergency plan;

    4. Enterprise qualifications and project department management personnel and special work qualifications for review;

    5. On-site quality management inspection record form (including various quality management systems, post responsibility systems, etc.);

    6. Inspection materials and equipment inspection materials (sampling and witnesses should go to the quality supervision station and testing center for the record);

    7. The general construction schedule;

    8. Plan for the use of safety construction protection measures.

    Second, the following information should be done during the construction process:

    1. Sampling and inspection of incoming materials;

    2. Acceptance record of concealed project;

    3. Construction test inspection records (water storage test, water supply and drainage ball, pressure test, etc. of balconies, toilets and other parts with waterproof requirements).

    4. Inspection batch process inspection;

    5. Acceptance records of sub-projects;

    6. Acceptance records of sub-divisions and sub-divisions;

    7. Unit project acceptance record; (Perception quality acceptance records, quality assurance data checklists, safety, functional testing data, etc.).

    8. Completion report;

    9. Monthly and weekly construction schedule;

    10. Construction plan and technical disclosure;

    11. Relevant reports required by the owner and supervisor;

    12. Drawing review, negotiation records, design disclosure, design change notices 13, and meeting minutes.

    14. an as-built drawing.

    15. A complete set of safety information (the requirements vary from place to place, but they are nothing more than the content listed in JGJ59-99).

  6. Anonymous users2024-02-01

    Construction plan Slope support Prepare crane foundation data.

  7. Anonymous users2024-01-31

    Contract collation, backup, construction plan, drawing review.

Related questions
2 answers2024-02-12

Summary. Dear, the application for the conversion of the chemical enterprise information clerk can be written like this: Dear xx I became a probationary employee of the company on 20/x/x, and the 3-month probationary period has expired today, according to the company's rules and regulations, I now apply to become a regular employee of the company. >>>More

3 answers2024-02-12

The premise is to install the original disk first, if you buy a genuine disk, then it's very simple, in addition to the original disk of the expansion card in the optical drive to install it. >>>More

3 answers2024-02-12

Method 1: Use Group Policy to prohibit access to Task Manager. >>>More

7 answers2024-02-12

The money you earn with your own hands is profitable.

44 answers2024-02-12

It's not too late, but it may be late in the industry. Now a lot of kids are out doing steel sales. But this line of work is not considered to be a meal of youth. So it's not sooner or later. >>>More