  1. Anonymous users2024-02-06

    It is mainly distinguished according to the degree of temperature resistance of the steel.

    A steam turbine is a rotating power machine that converts the energy of steam into mechanical work. Also known as steam turbines. It is mainly used as a prime mover for power generation, and can also directly drive various pumps, fans, compressors and ship propellers.

    It can also use the exhaust steam or intermediate extraction of the steam turbine to meet the heating needs of production and life.

    The high-pressure cylinder, which is an integral part of the steam turbine, is available in two types: single-flow and double-flow.

    Medium pressure cylinder, it is parallel to high-pressure cylinder and low-pressure cylinder, the difference is the difference in internal pressure. In steam turbines they are generally connected to each other, and only if there are multiple shafts, they are separated. However, in order to save costs, high, medium and low pressure cylinders are all connected by a single shaft.

    Low-pressure cylinders are similar to high-pressure cylinders and medium-pressure cylinders, and are an important part of steam turbines, when the steam turbine converts the thermal energy of high-temperature steam into high-speed rotating mechanical energy, and drives the generator to cut magnetic field lines and convert them into electrical energy.

  2. Anonymous users2024-02-05

    How much coal does a 300MW generator need for one hour of electricity generation at full load? It mainly depends on the coal consumption of the unit for power generation, if its coal consumption is 350g kWh, then 105 tons of coal are required to generate 300MWH.

  3. Anonymous users2024-02-04

    I think the landlord should know about the air door on the high water side.

    The start of the internal gas on the steam side of the high plus is generally used for the first time after the unit is overhauled (many power plants are directly replaced by continuous exhaust because of the high efficiency of the deaerator), that is, when the high heating body is just started, open a few turns, and pay attention to the vacuum change of the condenser when opening the high plus gas. After the warm-up is over, you can turn off the high plus start to deflate, slowly open and fully open the high plus continuous exhaust.

  4. Anonymous users2024-02-03

    The steam turbine of our factory is produced by Harbin Steam Turbine Factory. That is to say, the main steam pressure is 537

  5. Anonymous users2024-02-02

    Generally, it refers to the relative internal efficiency of the steam turbine, that is, the percentage of the actual enthalpy drop and the theoretical enthalpy drop.

  6. Anonymous users2024-02-01

    Answer: First of all, it is necessary to pass the brake test, the main steam door, and the tightness of the door adjustment test is qualified. Electric DAO Overdrive:

    Set the speed to stop the DEH, the DEH system jumps, protect the input, set the speed to the maximum speed of 3180R min, press and hold the F2 button on the 505E, and increase the speed with the adjustment key at the same time, the speed is increased to 3270R min, and the electric overspeed is stopped. At the end of the test, the brake was re-hung and maintained for 3000r min. Mechanical speeding:

    TSI jump, overspeed DEH jump, DEH system jump, protection release. The speed is set to 3180r min, hold down the F2 button of 505E, and at the same time use the adjustment button to increase the speed to the flying hammer action, and if you don't move, you will use the main valve and the adjustment valve to resist something, and make him fly! ~yyy

Related questions
13 answers2024-02-18

First of all, your battery BAI board should be a working voltage of 6V, and charge the battery one. 2500 mAh sunlight is good for 8-10 hours to be fully charged, but you can only drive an LED bulb for 5-6 hours. To be exact, you need 5 x 3W cells and 5 x 2500 mAh cells. >>>More

10 answers2024-02-18

Gundam before oo.

In 1989, the Gundam anime released after the change of the Japanese yuan to Heisei is generally referred to as the Heisei Gundam. From the beginning of 1993, when "Gundam V" began to air, to the end of "Gundam X" in late 1996, the Japanese animation industry finally began to break free from the ice that had lasted for several years since 1989 under the "third impact" of "EVA". The four "single-letter" Gundams of V, G, W, and X are going through this era of change, but in general, their spirit is still "pre-EVA". >>>More

6 answers2024-02-18

First of all, let's analyze that the W200C was released relatively late compared to the W300C. So there is a certain difference between the two. **W200C is currently about 500 yuan, and W300C seems to be not sold in many places,**About 600 yuan. >>>More

9 answers2024-02-18

W10 can not be installed in XP system, hardware requirements. You can play strategy games, but they must support Android, and games under win cannot be played, unless they are flash games. I can go to the QQ space, I can see other people's logs**, I can collect food, and this function is not added to the parking at present, and I have to wait for the firmware to be upgraded. >>>More

11 answers2024-02-18

W stands for winter, and the number in front of w represents the freezing point temperature. The freezing point temperature corresponding to 5W oil is -30. If the local temperature is not so low, this oil can be used as an all-season oil. >>>More