What are the requirements of the latest professional contracting qualification standards for foundat

Updated on society 2024-02-09
5 answers
  1. Anonymous users2024-02-06

    The net assets of the enterprise are more than 4 million yuan.

    The main personnel of the enterprise: (1) no less than 3 registered constructors; (2) The technical person in charge has more than 5 years of experience in engineering construction technology management, and has the intermediate title or above in the engineering sequence or the professional qualification of registered construction engineer or registered geotechnical engineer; There are no less than 8 personnel with intermediate or above professional titles in structure, geotechnical, mechanical and other majors, and the majors are complete; (3) There are no less than 10 construction site management personnel with post certificates, and the construction personnel, quality officers, safety officers, mechanics, cost personnel and other personnel are complete; (4) There are no less than 15 skilled workers such as pile driver operators, electricians, welders and other skilled workers who have been assessed or trained; (5) The technical person in charge (or registered constructor) has presided over the completion of no less than 2 projects required by the second-level or above standards of this category of qualifications.

  2. Anonymous users2024-02-05

    Enterprise assets: net assets of more than 4 million yuan.

    Key personnel of the enterprise.

    1) There shall be no less than 3 registered constructors.

    (2) The technical person in charge has more than 5 years of experience in engineering construction technology management, and has the intermediate title or above in the engineering sequence or the professional qualification of registered construction engineer or registered geotechnical engineer; There are no less than 8 personnel with intermediate or above professional titles in structure, geotechnical, mechanical and other majors, and the majors are complete;

    (3) There are no less than 10 construction site management personnel with post certificates, and the construction personnel, quality officers, safety officers, mechanics, cost personnel and other personnel are complete;

    (4) There are no less than 15 skilled workers such as pile driver operators, electricians, welders and other skilled workers who have been assessed or trained;

    5) Technical Leader.

    or registered constructor) has presided over the completion of no less than 2 projects required by the second-level or above standards of this category of qualifications.

    1) Industrial and civil construction projects with a height of less than 50 meters and foundation works of structures with a height of less than 70 meters;

    2) Rigid pile composite foundation treatment with a depth of no more than 18 meters or other foundation treatment projects with a depth of no more than 8 meters;

    3) Pile foundation works with a design load of 3000 kN or less for a single pile;

    4) Foundation pit enclosure project with an excavation depth of no more than 12 meters.

  3. Anonymous users2024-02-04

    Grade 1 qualification standard for professional contracting of foundation engineering:

    Net assets of more than 20 million yuan.

    There shall be no less than 6 first-class registered constructors.

    The technical person in charge has more than 10 years of experience in engineering construction technology management, and has the senior title of engineering sequence or the professional qualification of first-class registered constructor or registered geotechnical engineer; There are no less than 15 personnel with intermediate or above professional titles in structure, geotechnical, mechanical, surveying and other majors, and the majors are complete.

    There are no less than 30 construction site management personnel with post certificates, and the construction personnel, quality officers, safety officers, mechanics, cost personnel and other personnel are complete.

    There are no less than 30 skilled workers such as pile driver operators, electricians, welders and other skilled workers who have passed the assessment or training.

    In the past 5 years, he has undertaken the construction of 2 of the following 4 categories, and the quality of the project is qualified.

    Civil construction works with more than 25 floors or foundation works for structures with a height of more than 100 meters;

    Other foundation treatment works with a rigid pile composite foundation treatment depth of more than 18 meters or a depth of more than 8 meters;

    Pile foundation works with a design load of more than 3,000 kN for a single pile;

    Foundation pit enclosure works with an excavation depth of more than 12 meters.

  4. Anonymous users2024-02-03

    Business Assets:

    Net assets of more than 20 million yuan.

    Key personnel of the enterprise.

    1) There shall be no less than 6 first-class registered constructors.

    2) The technical person in charge has more than 10 years of experience in engineering construction technology management, and has the senior title of engineering sequence or the professional qualification of a registered construction engineer or registered geotechnical engineer; There are no less than 15 personnel with intermediate or above professional titles in structure, geotechnical, mechanical, surveying and other majors, and the majors are complete.

    3) There are no less than 30 construction site management personnel with post certificates, and the construction personnel, quality officers, safety officers, mechanics, cost personnel and other personnel are complete.

    4) There are no less than 30 skilled workers such as pile driver operators, electricians, welders and other skilled workers who have passed the assessment or training.

    Enterprise engineering performance.

    In the past 5 years, he has undertaken the construction of 2 of the following 4 categories, and the quality of the project is qualified.

    (1) Civil construction projects with more than 25 floors or foundation works for structures with a height of more than 100 meters;

    B) rigid pile composite foundation treatment depth more than 18 meters or depth more than 8 meters of other foundation treatment engineering;

    3) Pile foundation works with a design load of more than 3,000 kN for a single pile;

    4) Foundation pit enclosure works with an excavation depth of more than 12 meters.

  5. Anonymous users2024-02-02

    Hello, the professional contracting qualification of foundation engineering is divided into Grade A and Grade B.

    One. Class A qualification standards.

    1.Enterprise assets: net assets of more than 20 million yuan. In the past three years, the company has paid more than 2 million yuan in the construction industry.

    2.The main personnel of the enterprise: the main personnel of the enterprise are required to be not lower than the standard of grade B, and the technical person in charge has more than 10 years of experience in engineering construction technology management, and has the senior title of engineering sequence or the professional qualification of a registered constructor or registered geotechnical engineer.

    3.Scope of contracted projects: It can undertake the construction of various foundation projects.

    Two. Class B qualification standards.

    1.Enterprise assets: net assets of more than 4 million yuan.

    2.Key personnel of the enterprise: (1) No less than 2 registered constructors.

    (2) The technical person in charge has more than 5 years of experience in engineering construction technology management, and has the intermediate title or above in the engineering sequence or the professional qualification of registered construction engineer or registered geotechnical engineer; There are no less than 8 personnel with intermediate or above professional titles in structure, geotechnical, mechanical and other majors, and the majors are complete;

    3.Scope of contracted works: (1) Industrial and civil construction works with a height of less than 100 meters and foundation works of structures with a height of less than 120 meters; (2) Rigid round pile composite foundation treatment with a depth of not more than 24 meters and other foundation treatment projects with a depth of not more than 10 meters; (3) Pile foundation works with a design load of less than 5,000 kN for a single pile; (4) Foundation pit enclosure works with an excavation depth of no more than 15 meters.